differential CHRYSLER VOYAGER 2004 Service Manual
Page 2549 of 2585
CABLE - DIAGNOSIS AND TESTING,
ANTENNA BODY......................8A-4
CABLE - DIAGNOSIS AND TESTING,
BATTERY...........................8F-16
CABLE - INSTALLATION................8P-4
CABLE - INSTALLATION, ANTENNA BODY . . 8A-6
CABLE - INSTALLATION, FRONT.....5-64,5s-67
CABLE - INSTALLATION, GEAR SHIFT....21-205
CABLE - INSTALLATION, HOLD OPEN
LATCH .............................23-38
CABLE - INSTALLATION, INSIDE HANDLE . . 23-38
CABLE - INSTALLATION, INSTRUMENT
PANEL ANTENNA......................8A-9
CABLE - INSTALLATION, LATCH RELEASE . 23-62
CABLE - INSTALLATION, OUTSIDE
HANDLE............................23-37
CABLE - INSTALLATION, PARKING
BRAKE LEVER AND FRONT.........5-66,5s-69
CABLE - INSTALLATION, THROTTLE
CONTROL..........................14-36
CABLE - OPERATION...................8P-4
CABLE - OPERATION, ANTENNA BODY.....8A-4
CABLE - REMOVAL....................8P-4
CABLE - REMOVAL, ANTENNA BODY......8A-5
CABLE - REMOVAL, FRONT.........5-64,5s-67
CABLE - REMOVAL, GEAR SHIFT.......21-204,
21s-105
CABLE - REMOVAL, HOLD OPEN LATCH . . . 23-38
CABLE - REMOVAL, INSIDE HANDLE.....23-37
CABLE - REMOVAL, INSTRUMENT PANEL
ANTENNA...........................8A-8
CABLE - REMOVAL, LATCH RELEASE.....23-61
CABLE - REMOVAL, OUTSIDE HANDLE....23-37
CABLE - REMOVAL, PARKING BRAKE
LEVER AND FRONT...............5-65,5s-68
CABLE - REMOVAL, THROTTLE
CONTROL..........................14-35
CABLE - SELECTOR - INSTALLATION,
GEARSHIFT.........................21-84
CABLE - SELECTOR - REMOVAL,
GEARSHIFT.........................21-81
CABLE ADJUSTMENT, ADJUSTMENTS -
GEARSHIFT........................21-206
CABLE ADJUSTMENT, INSTALLATION -
SYNCHRONIZING...............23-102,23-88
CABLE (FRONT) - INSTALLATION,
PARKING BRAKE.................5-63,5s-65
CABLE (FRONT) - REMOVAL, PARKING
BRAKE.........................5-59,5s-62
CABLE (INTERMEDIATE) -
INSTALLATION, PARKING BRAKE
....5-63,5s-66
CABLE (INTERMEDIATE) - REMOVAL,
PARKING BRAKE
.................5-60,5s-62
CABLE (LEFT REAR) - INSTALLATION,
PARKING BRAKE
.................5-64,5s-66
CABLE (LEFT REAR) - REMOVAL,
PARKING BRAKE
.................5-62,5s-64
CABLE RESISTANCE, SPECIFICATIONS -
SPARK PLUG
.........................8I-2
CABLE (RIGHT REAR) - INSTALLATION,
PARKING BRAKE
.................5-63,5s-66
CABLE (RIGHT REAR) - REMOVAL,
PARKING BRAKE
.................5-60,5s-63
CABLES - ADJUSTMENT, PARKING
BRAKE
.........................5-64,5s-66
CABLES - DESCRIPTION, BATTERY
.......8F-16
CABLES - INSTALLATION, BATTERY
......8F-18
CABLES - OPERATION, BATTERY
........8F-16
CABLES - REMOVAL, BATTERY
..........8F-18
CALIBRATION - STANDARD PROCEDURE,
A/C-HEATER CONTROL
................24-20
CALIBRATION - STANDARD PROCEDURE,
COMPASS
...........................8M-3
CALIPER - CLEANING
....5-25,5-29,5s-24,5s-28
CALIPER - INSPECTION
. . . 5-25,5-29,5s-24,5s-28
CALIPER - INSTALLATION, REAR DISC
BRAKE
.........................5-30,5s-29
CALIPER - REMOVAL, REAR DISC
BRAKE
.........................5-27,5s-26
CALIPER ADAPTER - INSTALLATION,
FRONT DISC BRAKE
..............5-31,5s-30
CALIPER ADAPTER - REMOVAL, FRONT
DISC BRAKE
....................5-31,5s-30
CALIPER (CONTINENTAL TEVES
BRAKES) - INSTALLATION, FRONT
DISC BRAKE
........................5s-26CALIPER (CONTINENTAL TEVES
BRAKES) - REMOVAL, FRONT DISC
BRAKE.............................5s-23
CALIPER (DISC/DISC BRAKES) -
INSTALLATION, FRONT DISC BRAKE......5-27
CALIPER (DISC/DISC BRAKES) -
REMOVAL, FRONT DISC BRAKE..........5-24
CALIPER (DISC/DRUM BRAKES) -
INSTALLATION, FRONT DISC BRAKE......5-27
CALIPER (DISC/DRUM BRAKES) -
REMOVAL, FRONT DISC BRAKE..........5-24
CALIPER GUIDE PIN BUSHINGS
(CONTINENTAL TEVES BRAKES) -
ASSEMBLY..........................5s-24
CALIPER GUIDE PIN BUSHINGS
(CONTINENTAL TEVES BRAKES) -
DISASSEMBLY.......................5s-23
CALIPER GUIDE PIN BUSHINGS
(DISC/DISC BRAKES) - ASSEMBLY........5-25
CALIPER GUIDE PIN BUSHINGS
(DISC/DISC BRAKES) - DISASSEMBLY.....5-24
CALIPER GUIDE PINS (DISC/DRUM
BRAKES) - INSTALLATION, DISC
BRAKE..............................5-31
CALIPER GUIDE PINS (DISC/DRUM
BRAKES) - REMOVAL, DISC BRAKE.......5-31
CALIPER GUIDE PINS (TRW BRAKES) -
INSTALLATION, DISC BRAKE............5s-30
CALIPER GUIDE PINS (TRW BRAKES) -
REMOVAL, DISC BRAKE...............5s-30
CALIPER PISTON AND SEAL -
ASSEMBLY.............5-26,5-29,5s-25,5s-28
CALIPER PISTON AND SEAL -
DISASSEMBLY..........5-24,5-28,5s-23,5s-27
CALIPER (TRW BRAKES) -
INSTALLATION, FRONT DISC BRAKE......5s-26
CALIPER (TRW BRAKES) - REMOVAL,
FRONT DISC BRAKE..................5s-23
CAMSHAFT & BEARINGS (IN BLOCK) -
DESCRIPTION.......................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
INSPECTION........................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
INSTALLATION.......................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
OPERATION.........................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
REMOVAL..........................9-115
CAMSHAFT END PLAY - STANDARD
PROCEDURE, MEASURING..............9-29
CAMSHAFT OIL SEAL(S) - INSTALLATION . . 9-28
CAMSHAFT OIL SEAL(S) - REMOVAL......9-27
CAMSHAFT POSITION SENSOR -
DESCRIPTION.........................8I-4
CAMSHAFT POSITION SENSOR -
OPERATION..........................8I-4
CAMSHAFT SPROCKET - INSTALLATION,
TIMING CHAIN.......................9-157
CAMSHAFT SPROCKET - REMOVAL,
TIMING CHAIN.......................9-156
CAMSHAFT SPROCKETS - INSTALLATION . . 9-65
CAMSHAFT SPROCKETS - REMOVAL......9-64
CAMSHAFT(S) - CLEANING..............9-29
CAMSHAFT(S) - DESCRIPTION...........9-28
CAMSHAFT(S) - INSPECTION............9-30
CAMSHAFT(S) - INSTALLATION..........9-30
CAMSHAFT(S) - OPERATION.............9-28
CAMSHAFT(S) - REMOVAL..............9-29
CANISTER - DESCRIPTION, VAPOR......25-18
CANISTER - INSTALLATION, REAR EVAP . . 25-20
CANISTER - OPERATION, VAPOR........25-18
CANISTER - REMOVAL, REAR EVAP......25-19
CAP - DESCRIPTION, FUEL FILLER.......25-12
CAP - DESCRIPTION, RADIATOR
PRESSURE..........................7-26
CAP - INSTALLATION, INSTRUMENT
PANEL END.........................23-68
CAP - OPERATION, FUEL FILLER........25-12
CAP - OPERATION, RADIATOR
PRESSURE
..........................7-27
CAP - REMOVAL, INSTRUMENT PANEL
END
...............................23-68
CAP TESTING - DIAGNOSIS AND
TESTING, COOLING SYSTEM
PRESSURE
..........................7-27
CAP TO FILLER NECK SEAL -
DIAGNOSIS AND TESTING, RADIATOR
.....7-27
CAPACITIES - SPECIFICATIONS, FLUID
......0-6CARE - CLEANING, ALUMINUM WHEEL . . . 22-18
CARGO - INSTALLATION, AWD, HEAVY
DUTY...............................2-36
CARGO - INSTALLATION, SPRING........2-40
CARGO - REMOVAL, AWD, HEAVY DUTY . . . 2-36
CARGO - REMOVAL, SPRING............2-40
CARPETS AND FLOOR MATS -
INSTALLATION.......................23-76
CARPETS AND FLOOR MATS - REMOVAL . 23-75
CARRIER ASSEMBLY - DESCRIPTION,
BALANCE SHAFTS.....................9-69
CARRIER ASSEMBLY - INSTALLATION,
BALANCE SHAFTS.....................9-72
CARRIER ASSEMBLY - OPERATION,
BALANCE SHAFTS.....................9-69
CARRIER ASSEMBLY - REMOVAL,
BALANCE SHAFTS.....................9-69
CARRIER SEAL - INSTALLATION,
DIFFERENTIAL........................21-9
CARRIER SEAL - REMOVAL,
DIFFERENTIAL........................21-9
CATALYTIC CONVERTER - DESCRIPTION . . . 11-4
CATALYTIC CONVERTER - INSPECTION....11-5
CATALYTIC CONVERTER - INSTALLATION . . . 11-6
CATALYTIC CONVERTER - OPERATION.....11-4
CATALYTIC CONVERTER - REMOVAL......11-5
CAUSES - DIAGNOSIS AND TESTING,
COMMON PROBLEM..................21-30
CAUTION - A/C SYSTEM...............24-66
CAUTION - CAUTIONS...................5-78
CAUTION, DESCRIPTION.............5-4,5s-4
CAUTION, DESCRIPTION...............19-37
CAUTION, SENSOR - TPM.........22-10,22s-2
CAUTIONS, CAUTION..................5-78
CAUTIONS, WARNING - WARNINGS . 19-10,19-27
CD CHANGER - DESCRIPTION...........8A-7
CD CHANGER - INSTALLATION...........8A-8
CD CHANGER - OPERATION.............8A-7
CD CHANGER - REMOVAL..............8A-8
CENTER - DESCRIPTION, ELECTRONIC
VEHICLE INFO.......................8M-6
CENTER - DIAGNOSIS AND TESTING,
ELECTRONIC VEHICLE INFORMATION.....8M-7
CENTER - INSTALLATION, ELECTRONIC
VEHICLE INFO.......................8M-9
CENTER - OPERATION, ELECTRONIC
VEHICLE INFO.......................8M-7
CENTER - REMOVAL, ELECTRONIC
VEHICLE INFO.......................8M-9
CENTER BEZEL - INSTALLATION,
INSTRUMENT PANEL..................23-68
CENTER BEZEL - REMOVAL,
INSTRUMENT PANEL..................23-68
CENTER BEZEL OUTLETS -
INSTALLATION.......................24-45
CENTER BEZEL OUTLETS - REMOVAL....24-44
CENTER CONSOLE LAMP -
INSTALLATION.......................8L-21
CENTER CONSOLE LAMP - REMOVAL....8L-21
CENTER CONSOLE LAMP SWITCH -
INSTALLATION.......................8L-21
CENTER CONSOLE LAMP SWITCH -
REMOVAL..........................8L-21
CENTER HIGH MOUNTED STOP LAMP -
INSTALLATION........................8L-6
CENTER HIGH MOUNTED STOP LAMP -
REMOVAL...........................8L-6
CENTER HIGH MOUNTED STOP LAMP
UNIT - INSTALLATION..................8L-6
CENTER HIGH MOUNTED STOP LAMP
UNIT - REMOVAL.....................8L-6
CENTER HINGE - INSTALLATION.........23-24
CENTER HINGE - REMOVAL............23-24
CENTER PROGRAMMING - STANDARD
PROCEDURE, ELECTRONIC VEHICLE
INFORMATION.......................8M-7
CENTER STRIKER - INSTALLATION.......23-28
CENTER STRIKER - REMOVAL..........23-28
CENTERING - STANDARD PROCEDURE,
CLOCK SPRING.......................8O-5
CERTIFICATION LABEL - DESCRIPTION,
VEHICLE
.........................Intro.-11
CHAIN AND CAMSHAFT SPROCKET -
INSTALLATION, TIMING
................9-157
CHAIN AND CAMSHAFT SPROCKET -
REMOVAL, TIMING
...................9-156
CHAIN COVER - INSTALLATION, TIMING
. . 9-155
CHAIN COVER - REMOVAL, TIMING
......9-153
6 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2550 of 2585
CHAIN WEAR - STANDARD PROCEDURE,
MEASURING TIMING..................9-153
CHANGE - STANDARD PROCEDURE,
DIFFERENTIAL ASSEMBLY FLUID.........3-40
CHANGE - STANDARD PROCEDURE,
ENGINE OIL AND FILTER...........9-137,9-53
CHANGE - STANDARD PROCEDURE,
OVERRUNNING CLUTCH HOUSING
FLUID..............................3-41
CHANGE - STANDARD PROCEDURE, PTU
FLUID..............................21-5
CHANGER - DESCRIPTION, CD...........8A-7
CHANGER - INSTALLATION, CD..........8A-8
CHANGER - OPERATION, CD.............8A-7
CHANGER - REMOVAL, CD..............8A-8
CHANNEL - INSTALLATION, WATER.....23-121
CHANNEL - REMOVAL, WATER.........23-121
CHARGE - STANDARD PROCEDURE,
REFRIGERANT SYSTEM...............24-72
CHARGE LEVEL TEST - 2.5L DIESEL -
DIAGNOSIS AND TESTING, SYSTEM......24-68
CHARGE LEVEL TEST - GASOLINE
ENGINES - DIAGNOSIS AND TESTING,
SYSTEM............................24-67
CHARGING - STANDARD PROCEDURE,
CONVENTIONAL BATTERY..............8F-11
CHARGING - STANDARD PROCEDURE,
SPIRAL PLATE BATTERY...............8F-10
CHARGING SYSTEM - DESCRIPTION.....8F-20
CHARGING SYSTEM - OPERATION.......8F-20
CHARTS - DIAGNOSIS AND TESTING,
STEERING SYSTEM DIAGNOSIS...........19-3
CHARTS - SPECIFICATIONS, COLOR
CODE..............................23-84
CHATTER COMPLAINTS - DIAGNOSIS
AND TESTING, CLUTCH.................6-6
CHECK - DIAGNOSIS AND TESTING,
COOLING SYSTEM FLOW................7-3
CHECK - DIAGNOSIS AND TESTING,
EXHAUST SYSTEM RESTRICTION.........11-2
CHECK - STANDARD PROCEDURE,
COOLANT LEVEL.......................7-5
CHECK - STANDARD PROCEDURE,
ENGINE OIL LEVEL...................9-137
CHECK - STANDARD PROCEDURE, FLUID
LEVEL.............................21-71
CHECK, STANDARD PROCEDURE -
ENGINE OIL LEVEL....................9-53
CHECK, STANDARD PROCEDURE - FLUID
LEVEL AND CONDITION........21-201,21s-102
CHECK STRAP - INSTALLATION.........23-15
CHECK STRAP - REMOVAL.............23-15
CHECKING - STANDARD PROCEDURE,
BRAKE FLUID LEVEL..............5-32,5s-31
CHECKING - STANDARD PROCEDURE,
POWER STEERING FLUID LEVEL........19-44
CHECKING BATTERY ELECTROLYTE
LEVEL - STANDARD PROCEDURE........8F-14
CHECKING ENGINE OIL PRESSURE -
DIAGNOSIS AND TESTING..............9-52
CHECKING POWER STEERING BELT
TENSION - STANDARD PROCEDURE.......7-8
CHILD RESTRAINT ANCHOR -
DESCRIPTION........................8O-4
CHILD RESTRAINT ANCHOR -
OPERATION..........................8O-4
CHILD SEAT - INSTALLATION, QUAD.....23-89
CHILD SEAT - REMOVAL, QUAD.........23-89
CHILD SEAT MODULE, BENCH SEAT -
REMOVAL..........................23-87
CHIME SYSTEM - DIAGNOSIS AND
TESTING
............................8B-1
CHIME/BUZZER - DESCRIPTION
..........8B-1
CHIME/BUZZER - OPERATION
............8B-1
CHIME/BUZZER - WARNING
.............8B-1
CHIME/THERMISTOR - DESCRIPTION
....8N-10
CHIME/THERMISTOR - INSTALLATION
....8N-10
CHIME/THERMISTOR - OPERATION
......8N-10
CHIME/THERMISTOR - REMOVAL
.......8N-10
CHIRP PREFERENCE - STANDARD
PROCEDURE, HORN
..............8N-42,8N-5
CIRCUIT - DIAGNOSIS AND TESTING,
AMBIENT TEMPERATURE SENSOR
......8M-12
CIRCUIT FUNCTIONS - DESCRIPTION
. . 8W-01-6
CIRCUIT INFORMATION - DESCRIPTION
. 8W-01-5
CIRCUIT RESISTANCE TEST -
DIAGNOSIS AND TESTING, FEED
. . . 8F-32,8F-34CIRCUIT TEST - DIAGNOSIS AND
TESTING, CONTROL..............8F-30,8F-32
CIRCUIT TEST - DIAGNOSIS AND
TESTING, FEED.................8F-33,8F-35
CIRCUITS - OPERATION, NON-
MONITORED.........................25-5
CIRCUITS AND VALVES - OPERATION,
HYDRAULIC..........................5-83
CLAMP - STANDARD PROCEDURE,
HOSES..............................14-7
CLAMPS - DESCRIPTION, FUEL
LINES/HOSES........................14-6
CLAMPS - DESCRIPTION, HOSE...........7-1
CLAMPS - OPERATION, HOSE.............7-2
CLEAN, CLEANING...................21-114
CLEARANCE - STANDARD PROCEDURE,
MEASURING CONNECTING ROD
BEARING...........................9-120
CLEARANCE USING PLASTIGAGE -
STANDARD PROCEDURE, MEASURING
BEARING........................9-12,9-84
CLOCK SPRING - DESCRIPTION..........8O-4
CLOCK SPRING - INSTALLATION.........8O-5
CLOCK SPRING - OPERATION...........8O-4
CLOCK SPRING - REMOVAL.............8O-5
CLOCK SPRING CENTERING -
STANDARD PROCEDURE...............8O-5
CLUSTER - DESCRIPTION, INSTRUMENT . . . 8J-1
CLUSTER - OPERATION, INSTRUMENT.....8J-1
CLUSTER BEZEL - INSTALLATION........23-63
CLUSTER BEZEL - REMOVAL.............23-63
CLUSTER DIAGNOSIS - DIAGNOSIS AND
TESTING............................8J-2
CLUSTER ILLUMINATION LAMPS -
INSTALLATION.......................8L-21
CLUSTER ILLUMINATION LAMPS -
REMOVAL..........................8L-21
CLUSTER LENS - INSTALLATION........8J-10
CLUSTER LENS - REMOVAL............8J-10
CLUTCH - DESCRIPTION.................6-1
CLUTCH - DESCRIPTION, BI-
DIRECTIONAL OVERRUNNING...........3-34
CLUTCH - OPERATION, BI-DIRECTIONAL
OVERRUNNING.......................3-36
CLUTCH AIR PRESSURE TESTS -
DIAGNOSIS AND TESTING.......21-122,21s-30
CLUTCH ASSEMBLY - ASSEMBLY,
INPUT.....................21-216,21s-116
CLUTCH ASSEMBLY - DISASSEMBLY,
INPUT.....................21-208,21s-107
CLUTCH ASSY - 2.4L GAS -
INSTALLATION, MODULAR..............6-11
CLUTCH ASSY - 2.4L GAS - REMOVAL,
MODULAR...........................6-11
CLUTCH CHATTER COMPLAINTS -
DIAGNOSIS AND TESTING...............6-6
CLUTCH COIL - DIAGNOSIS AND
TESTING, A/C COMPRESSOR...........24-15
CLUTCH COVER AND DISC RUNOUT -
DIAGNOSIS AND TESTING...............6-6
CLUTCH DISC AND PRESSURE PLATE -
2.5L TD - INSTALLATION
...............6-12
CLUTCH DISC AND PRESSURE PLATE -
2.5L TD - REMOVAL
...................6-11
CLUTCH HOUSING FLUID CHANGE -
STANDARD PROCEDURE,
OVERRUNNING
.......................3-41
CLUTCH PEDAL INTERLOCK SWITCH -
INSTALLATION
........................6-14
CLUTCH PEDAL INTERLOCK SWITCH -
REMOVAL
...........................6-13
CLUTCH PEDAL UPSTOP SWITCH -
INSTALLATION
........................6-16
CLUTCH PEDAL UPSTOP SWITCH -
REMOVAL
...........................6-15
CLUTCH RELAY - DESCRIPTION, A/C
COMPRESSOR
.......................24-19
CLUTCH RELAY - INSTALLATION, A/C
COMPRESSOR
.......................24-20
CLUTCH RELAY - OPERATION, A/C
COMPRESSOR
.......................24-19
CLUTCH RELAY - REMOVAL, A/C
COMPRESSOR
.......................24-20
CLUTCH RELEASE LEVER AND BEARING
- INSTALLATION
.......................6-7
CLUTCH RELEASE LEVER AND BEARING
- REMOVAL
...........................6-6CLUTCH SYSTEM - DIAGNOSIS AND
TESTING.............................6-3
CLUTCH/COIL - DESCRIPTION, A/C
COMPRESSOR.......................24-15
CLUTCH/COIL - INSPECTION, A/C
COMPRESSOR.......................24-17
CLUTCH/COIL - INSTALLATION, A/C
COMPRESSOR.......................24-17
CLUTCH/COIL - OPERATION, A/C
COMPRESSOR.......................24-15
CLUTCH/COIL - REMOVAL, A/C
COMPRESSOR.......................24-16
CLUTCHES - DESCRIPTION, DRIVING . . . 21-190,
21s-95
CLUTCHES - DESCRIPTION, HOLDING . . . 21-207,
21s-106
CLUTCHES - OPERATION, DRIVING.....21-190,
21s-95
CLUTCHES - OPERATION, HOLDING....21-207,
21s-106
COAT/CLEARCOAT FINISH -
DESCRIPTION, BASE..................23-85
CODE - DESCRIPTION, PAINT...........23-85
CODE CHARTS - SPECIFICATIONS,
COLOR.............................23-84
CODE PLATE - DESCRIPTION, BODY....Intro.-1
CODES - STANDARD PROCEDURE,
ERASING TRANSMITTER..............8M-11
CODES - STANDARD PROCEDURE,
OBTAINING DIAGNOSTIC TROUBLE......8E-15
CODES - STANDARD PROCEDURE,
SETTING TRANSMITTER..............8M-11
COIL - DESCRIPTION, IGNITION............8I-6
COIL - DIAGNOSIS AND TESTING, A/C
COMPRESSOR CLUTCH...............24-15
COIL - OPERATION, IGNITION............8I-7
COLLAR - INSTALLATION, STRUCTURAL . . . 9-48
COLLAR - REMOVAL, STRUCTURAL.......9-47
COLOR CODE CHARTS -
SPECIFICATIONS.....................23-84
COLUMN - DESCRIPTION, STEERING.....19-10
COLUMN - DIAGNOSIS AND TESTING,
STEERING..........................19-12
COLUMN COVER - INSTALLATION,
LOWER STEERING...................23-70
COLUMN COVER - INSTALLATION, OVER
STEERING..........................23-70
COLUMN COVER - REMOVAL, LOWER
STEERING..........................23-70
COLUMN COVER - REMOVAL, OVER
STEERING..........................23-70
COLUMN COVER BACKING PLATE -
INSTALLATION, STEERING.............23-70
COLUMN COVER BACKING PLATE -
REMOVAL, STEERING.................23-70
COLUMN TORQUE, SPECIFICATIONS.....19-14
COMBUSTION PRESSURE LEAKAGE
TEST - DIAGNOSIS AND TESTING,
CYLINDER........................9-83,9-9
COMMON PROBLEM CAUSES -
DIAGNOSIS AND TESTING.............21-30
COMMUNICATION RECEIVE - PCM INPUT
- OPERATION, DATA BUS..............8E-15
COMMUNICATIONS INTERFACE (PCI)
BUS, OPERATION - PROGRAMMABLE....14-21
COMPASS CALIBRATION - STANDARD
PROCEDURE.........................8M-3
COMPASS DEMAGNETIZING -
STANDARD PROCEDURE...............8M-4
COMPASS MINI-TRIP COMPUTER -
DIAGNOSIS AND TESTING.............8M-10
COMPASS VARIATION ADJUSTMENT -
STANDARD PROCEDURE...............8M-5
COMPASS/MINI-TRIP COMPUTER -
DESCRIPTION........................8M-9
COMPASS/MINI-TRIP COMPUTER -
INSTALLATION......................8M-10
COMPASS/MINI-TRIP COMPUTER -
OPERATION.........................8M-9
COMPASS/MINI-TRIP COMPUTER -
REMOVAL..........................8M-10
COMPLAINTS - DIAGNOSIS AND
TESTING, CLUTCH CHATTER
..............6-6
COMPRESSION PRESSURE TEST -
DIAGNOSIS AND TESTING, CYLINDER
. . 9-83,9-9
COMPRESSOR - DESCRIPTION, A/C
......24-73
COMPRESSOR - OPERATION, A/C
........24-73
COMPRESSOR - REMOVAL
.............24-74
RSINDEX7
Description Group-Page Description Group-Page Description Group-Page
Page 2553 of 2585
CV BOOT - INNER/OUTER -
INSTALLATION........................3-17
CV BOOT - INNER/OUTER - REMOVAL.....3-15
CV BOOT - OUTER - INSTALLATION.......3-10
CV BOOT - OUTER - REMOVAL...........3-10
CYCLE - STANDARD PROCEDURE,
POWER DOOR LEARN................8N-28
CYCLE - STANDARD PROCEDURE,
POWER LIFTGATE LEARN...............8N-9
CYLINDER - DESCRIPTION, KEY/LOCK....19-20
CYLINDER - DESCRIPTION, STANDARD 4 . . . 8I-9
CYLINDER - INSTALLATION, KEY/LOCK . . . 19-20
CYLINDER - INSTALLATION, LOCK . . 23-19,23-42
CYLINDER - INSTALLATION, SLAVE.......6-11
CYLINDER - INSTALLATION, SUPPORT....23-43
CYLINDER - LHD - INSTALLATION,
MASTER............................6-10
CYLINDER - LHD - REMOVAL, MASTER.....6-9
CYLINDER - OPERATION, KEY/LOCK......19-20
CYLINDER - REMOVAL, KEY/LOCK.......19-20
CYLINDER - REMOVAL, LOCK......23-19,23-42
CYLINDER - REMOVAL, SLAVE...........6-11
CYLINDER - REMOVAL, SUPPORT.......23-43
CYLINDER - RHD - INSTALLATION,
MASTER.............................6-9
CYLINDER - RHD - REMOVAL, MASTER.....6-8
CYLINDER BLEEDING - STANDARD
PROCEDURE, MASTER............5-35,5s-34
CYLINDER BORE FITTING - STANDARD
PROCEDURE, PISTON TO...............9-42
CYLINDER BORE HONING - STANDARD
PROCEDURE....................9-112,9-35
CYLINDER COMBUSTION PRESSURE
LEAKAGE TEST - DIAGNOSIS AND
TESTING.........................9-83,9-9
CYLINDER COMPRESSION PRESSURE
TEST - DIAGNOSIS AND TESTING.....9-83,9-9
CYLINDER (FLUID RESERVOIR) -
ASSEMBLY, MASTER..............5-38,5s-37
CYLINDER (FLUID RESERVOIR) -
DISASSEMBLY, MASTER...........5-37,5s-36
CYLINDER HEAD - CLEANING . . 9-100,9-26,9s-17
CYLINDER HEAD - DESCRIPTION....9-24,9-99,
9s-16
CYLINDER HEAD - INSPECTION.....9-101,9-26,
9s-17
CYLINDER HEAD - INSTALLATION . . . 9-101,9-26,
9s-18
CYLINDER HEAD - REMOVAL . . 9-100,9-25,9s-17
CYLINDER HEAD COVER - CLEANING......9-31
CYLINDER HEAD COVER - INSPECTION....9-31
CYLINDER HEAD COVER -
INSTALLATION........................9-31
CYLINDER HEAD COVER - LEFT -
INSTALLATION.......................9-103
CYLINDER HEAD COVER - LEFT -
REMOVAL..........................9-103
CYLINDER HEAD COVER - REMOVAL......9-31
CYLINDER HEAD COVER - RIGHT -
INSTALLATION.......................9-103
CYLINDER HEAD COVER - RIGHT -
REMOVAL..........................9-102
CYLINDER HEAD COVER-LEFT -
INSTALLATION
.......................9s-20
CYLINDER HEAD COVER-LEFT -
REMOVAL
..........................9s-20
CYLINDER HEAD COVER-RIGHT -
INSTALLATION
.......................9s-19
CYLINDER HEAD COVER-RIGHT -
REMOVAL
..........................9s-19
CYLINDER HEAD COVER(S) -
DESCRIPTION
..................9-102,9s-19
CYLINDER HEAD GASKET - DIAGNOSIS
AND TESTING
...............9-24,9-99,9s-16
CYLINDER HEAD OFF - INSTALLATION
. . . 9-108,
9-33,9s-26
CYLINDER HEAD OFF - REMOVAL
. . . 9-106,9-32,
9s-24
CYLINDER HEAD ON - INSTALLATION
....9-108,
9-33,9s-26
CYLINDER HEAD ON - REMOVAL
. . . 9-106,9-32,
9s-24
CYLINDER HOUSING - INSTALLATION,
LOCK
..............................19-19
CYLINDER HOUSING - REMOVAL, LOCK
. . 19-17
CYLINDER LOCK SWITCH -
DESCRIPTION, DOOR
.................8N-40CYLINDER LOCK SWITCH - DIAGNOSIS
AND TESTING, DOOR.................8N-40
CYLINDER LOCK SWITCH - EXPORT -
DESCRIPTION, DOOR..................8N-3
CYLINDER LOCK SWITCH - EXPORT -
DIAGNOSIS AND TESTING, DOOR........8N-3
CYLINDER LOCK SWITCH - EXPORT -
INSTALLATION, DOOR.................8N-4
CYLINDER LOCK SWITCH - EXPORT -
OPERATION, DOOR....................8N-3
CYLINDER LOCK SWITCH - EXPORT -
REMOVAL, DOOR.....................8N-3
CYLINDER LOCK SWITCH -
INSTALLATION, DOOR.................8N-41
CYLINDER LOCK SWITCH - OPERATION,
DOOR.............................8N-40
CYLINDER LOCK SWITCH - REMOVAL,
DOOR.............................8N-41
CYLINDERS - INSPECTION, WHEEL . . 5-57,5s-59
CYLINDERS - INSTALLATION, WHEEL . 5-57,5s-60
CYLINDERS - REMOVAL, WHEEL....5-57,5s-59
DAMAGED OR WORN THREADS -
STANDARD PROCEDURE, REPAIR OF . . 9-10,9-86
DAMPER - INSTALLATION, VIBRATION . . . 9-130,
9-47
DAMPER - REMOVAL, VIBRATION . . . 9-130,9-47
DATA BUS COMMUNICATION RECEIVE -
PCM INPUT - OPERATION..............8E-15
DATA LINK CONNECTOR - DESCRIPTION . . . 8E-6
DATA LINK CONNECTOR - OPERATION.....8E-7
DAY / NIGHT MIRROR - DESCRIPTION,
AUTOMATIC..........................8N-47
DAY / NIGHT MIRROR - DIAGNOSIS AND
TESTING, AUTOMATIC................8N-47
DAY / NIGHT MIRROR - OPERATION,
AUTOMATIC........................8N-47
DEAERATION - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-4
DECOUPLER PULLEY - DESCRIPTION,
GENERATOR....................8F-25,8F-27
DECOUPLER PULLEY - DIAGNOSIS AND
TESTING, GENERATOR...........8F-25,8F-27
DECOUPLER PULLEY - INSTALLATION,
GENERATOR....................8F-26,8F-28
DECOUPLER PULLEY - OPERATION,
GENERATOR....................8F-25,8F-27
DECOUPLER PULLEY - REMOVAL,
GENERATOR....................8F-26,8F-28
DEFINITION - DESCRIPTION, TRIP........25-1
DEFLECTOR - INSTALLATION, WIND.....23-121
DEFLECTOR - REMOVAL, WIND........23-121
DEFOGGER RELAY - DESCRIPTION,
REAR WINDOW.......................8G-3
DEFOGGER RELAY - INSTALLATION,
REAR WINDOW.......................8G-3
DEFOGGER RELAY - OPERATION, REAR
WINDOW............................8G-3
DEFOGGER RELAY - REMOVAL, REAR
WINDOW............................8G-3
DEFOGGER SWITCH - DESCRIPTION,
REAR WINDOW.......................8G-4
DEFOGGER SWITCH - OPERATION, REAR
WINDOW............................8G-4
DEFOGGER SYSTEM - DIAGNOSIS AND
TESTING, REAR WINDOW..............8G-2
DEFROSTER DUCT - INSTALLATION......24-50
DEFROSTER DUCT - REMOVAL..........24-50
DEMAGNETIZING - STANDARD
PROCEDURE, COMPASS...............8M-4
DEMISTER DUCTS - INSTALLATION,
INSTRUMENT PANEL..................24-55
DEMISTER DUCTS - REMOVAL,
INSTRUMENT PANEL..................24-55
DEMISTER OUTLET - INSTALLATION.....24-46
DEMISTER OUTLET - REMOVAL.........24-45
DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER AN
AIRBAG.............................8O-3
DETECTION ASSY - INSTALLATION,
NATURAL VAC LEAK
..................25-13
DETECTION ASSY - REMOVAL, NATURAL
VAC LEAK
..........................25-13
DETECTION PUMP - INSTALLATION,
LEAK
..............................25-13
DETECTION PUMP - REMOVAL, LEAK
....25-13
DEVICES - STANDARD PROCEDURE,
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE
........................8W-01-8DIAGNOSTIC SYSTEM - DIAGNOSIS AND
TESTING, ON-BOARD.................8F-21
DIAGNOSTIC TROUBLE CODES -
STANDARD PROCEDURE, OBTAINING.....8E-15
DIAGRAMS - 41TE TRANSAXLE
HYDRAULIC SCHEMATICS,
SCHEMATICS.......................21-169
DIAGRAMS - 4XTE TRANSAXLE
HYDRAULIC SCHEMATICS,
SCHEMATICS.......................21s-75
DIAGRAMS - DESCRIPTION, HOW TO
USE WIRING......................8W-01-1
DIAGRAMS - SPECIAL TOOLS,
SCHEMATICS.......................21s-89
DIESEL - DESCRIPTION, 2.5L...........19-51
DIESEL - DIAGNOSIS AND TESTING,
SYSTEM CHARGE LEVEL TEST - 2.5L....24-68
DIESEL - INSTALLATION, 2.5L..........19-52
DIESEL - REMOVAL, 2.5L..............19-51
DIESEL ENGINE - DESCRIPTION, FUEL
REQUIREMENTS.......................0-6
DIESEL ENGINES - DESCRIPTION,
ENGINE OIL...........................0-6
DIESEL ENGINES - EXPORT -
DESCRIPTION........................0-24
DIESEL HEATER WIRING -
INSTALLATION, SUPPLEMENTAL........24-119
DIESEL HEATER WIRING - REMOVAL,
SUPPLEMENTAL....................24-119
DIESEL SUPPLEMENTAL CABIN HEATER
- DIAGNOSIS AND TESTING...........24-113
DIFFERENTIAL - ASSEMBLY............21-66
DIFFERENTIAL - DESCRIPTION...........21-62
DIFFERENTIAL - DISASSEMBLY.........21-62
DIFFERENTIAL - OPERATION............21-62
DIFFERENTIAL ASSEMBLY -
DESCRIPTION........................3-39
DIFFERENTIAL ASSEMBLY - OPERATION . . . 3-39
DIFFERENTIAL ASSEMBLY FLUID
CHANGE - STANDARD PROCEDURE.......3-40
DIFFERENTIAL BEARING PRELOAD -
ADJUSTMENT......................21-199
DIFFERENTIAL BEARING PRELOAD
MEASUREMENT AND ADJUSTMENT,
ADJUSTMENTS....................21s-100
DIFFERENTIAL CARRIER SEAL -
INSTALLATION........................21-9
DIFFERENTIAL CARRIER SEAL -
REMOVAL...........................21-9
DIFFERENTIAL SIDE GEAR END PLAY -
ADJUSTMENT.......................21-70
DIFFERENTIAL TURNING TORQUE -
ADJUSTMENT.......................21-69
DIMENSIONS - SPECIFICATIONS, BODY
OPENING..........................23-127
DIMENSIONS, SPECIFICATIONS - FRAME . . . 13-4
DIODE - INSTALLATION............8W-01-14
DIODE - REMOVAL................8W-01-14
DISC AND PRESSURE PLATE - 2.5L TD -
INSTALLATION, CLUTCH................6-12
DISC AND PRESSURE PLATE - 2.5L TD -
REMOVAL, CLUTCH....................6-11
DISC BRAKE CALIPER - INSTALLATION,
REAR..........................5-30,5s-29
DISC BRAKE CALIPER - REMOVAL,
REAR..........................5-27,5s-26
DISC BRAKE CALIPER ADAPTER -
INSTALLATION, FRONT............5-31,5s-30
DISC BRAKE CALIPER ADAPTER -
REMOVAL, FRONT................5-31,5s-30
DISC BRAKE CALIPER (CONTINENTAL
TEVES BRAKES) - INSTALLATION,
FRONT.............................5s-26
DISC BRAKE CALIPER (CONTINENTAL
TEVES BRAKES) - REMOVAL, FRONT.....5s-23
DISC BRAKE CALIPER (DISC/DISC
BRAKES) - INSTALLATION, FRONT........5-27
DISC BRAKE CALIPER (DISC/DISC
BRAKES) - REMOVAL, FRONT
............5-24
DISC BRAKE CALIPER (DISC/DRUM
BRAKES) - INSTALLATION, FRONT
........5-27
DISC BRAKE CALIPER (DISC/DRUM
BRAKES) - REMOVAL, FRONT
............5-24
DISC BRAKE CALIPER GUIDE PINS
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-31
DISC BRAKE CALIPER GUIDE PINS
(DISC/DRUM BRAKES) - REMOVAL
.......5-31
10 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2555 of 2585
DRIVE UNIT - INSTALLATION, LOWER....8N-33
DRIVE UNIT - OPERATION, LOWER......8N-32
DRIVE UNIT - REMOVAL, LOWER.......8N-33
DRIVE UNIT TRACK & RACK -
DESCRIPTION, LOWER................8N-34
DRIVE UNIT TRACK & RACK -
INSTALLATION, LOWER...............8N-34
DRIVE UNIT TRACK & RACK -
OPERATION, LOWER..................8N-34
DRIVE UNIT TRACK & RACK -
REMOVAL, LOWER...................8N-34
DRIVELINE MODULE - DESCRIPTION,
REAR...............................3-23
DRIVELINE MODULE - OPERATION,
REAR...............................3-23
DRIVELINE MODULE - SPECIFICATIONS,
REAR...............................3-34
DRIVELINE MODULE FLUIDS -
DESCRIPTION, AWD REAR...............0-6
DRIVELINE MODULE NOISE -
DIAGNOSIS AND TESTING, REAR.........3-24
DRIVELINE MODULE OPERATION -
DIAGNOSIS AND TESTING, REAR.........3-26
DRIVER AIRBAG - DESCRIPTION.........8O-6
DRIVER AIRBAG - INSTALLATION........8O-7
DRIVER AIRBAG - OPERATION...........8O-6
DRIVER AIRBAG - REMOVAL............8O-6
DRIVER AIRBAG TRIM COVER -
INSTALLATION.......................8O-7
DRIVER AIRBAG TRIM COVER -
REMOVAL...........................8O-7
DRIVER HEATED SEAT SWITCH -
DESCRIPTION........................8G-8
DRIVER HEATED SEAT SWITCH -
DIAGNOSIS AND TESTING..............8G-9
DRIVER HEATED SEAT SWITCH -
INSTALLATION......................8G-10
DRIVER HEATED SEAT SWITCH -
OPERATION..........................8G-8
DRIVER HEATED SEAT SWITCH -
REMOVAL..........................8G-10
DRIVER POWER SEAT TRACK -
DESCRIPTION..................8N-15,8N-58
DRIVER POWER SEAT TRACK -
DIAGNOSIS AND TESTING........8N-15,8N-58
DRIVER POWER SEAT TRACK -
INSTALLATION.................8N-16,8N-59
DRIVER POWER SEAT TRACK -
OPERATION...................8N-15,8N-58
DRIVER POWER SEAT TRACK -
REMOVAL.....................8N-16,8N-59
DRIVER SEAT SWITCH - DESCRIPTION . . . 8N-10,
8N-53
DRIVER SEAT SWITCH - DIAGNOSIS
AND TESTING..................8N-11,8N-54
DRIVER SEAT SWITCH - INSTALLATION . . 8N-12,
8N-55
DRIVER SEAT SWITCH - OPERATION....8N-11,
8N-54
DRIVER SEAT SWITCH - REMOVAL . 8N-12,8N-55
DRIVING CLUTCHES - DESCRIPTION....21-190,
21s-95
DRIVING CLUTCHES - OPERATION.....21-190,
21s-95
DROP - STANDARD PROCEDURE,
TESTING FOR A VOLTAGE...........8W-01-10
DRUM - INSTALLATION............5-32,5s-31
DRUM - REMOVAL...............5-32,5s-31
DRUM BRAKE - INSTALLATION,
SUPPORT PLATE.................5-56,5s-58
DRUM BRAKE - REMOVAL, SUPPORT
PLATE .........................5-56,5s-58
DRUM BRAKE AUTOMATIC ADJUSTER -
DIAGNOSIS AND TESTING.........5-13,5s-13
DRUM BRAKE SHOE LINING -
INSPECTION, REAR...............5-22,5s-21
DRUM BRAKE SHOES - ADJUSTMENT,
REAR..........................5-23,5s-22
DRUM BRAKE SHOES - INSTALLATION,
REAR..........................5-22,5s-21
DRUM BRAKE SHOES - REMOVAL, REAR . . 5-19,
5s-18
DRUM BRAKES (REAR) - DESCRIPTION
. . . 5-13,
5s-12
DUAL ZONE - DESCRIPTION
.............24-2
DUAL ZONE - OPERATION
...............24-5
DUCT - INSTALLATION, DEFROSTER
.....24-50
DUCT - INSTALLATION, DISTRIBUTION
. . . 24-57DUCT - INSTALLATION, REAR FLOOR
HEAT ..............................24-63
DUCT - REMOVAL, DEFROSTER.........24-50
DUCT - REMOVAL, DISTRIBUTION.......24-57
DUCT - REMOVAL, REAR FLOOR HEAT . . . 24-62
DUCTS - INSTALLATION, FLOOR
DISTRIBUTION.......................24-50
DUCTS - INSTALLATION, INSTRUMENT
PANEL.............................24-55
DUCTS - INSTALLATION, INSTRUMENT
PANEL DEMISTER....................24-55
DUCTS - REMOVAL, FLOOR
DISTRIBUTION.......................24-50
DUCTS - REMOVAL, INSTRUMENT
PANEL.............................24-55
DUCTS - REMOVAL, INSTRUMENT
PANEL DEMISTER....................24-55
DUTY, CARGO - INSTALLATION, AWD,
HEAVY..............................2-36
DUTY, CARGO - REMOVAL, AWD, HEAVY . . . 2-36
DVD PLAYER - DESCRIPTION............8A-8
DVD PLAYER - INSTALLATION...........8A-8
DVD PLAYER - OPERATION.............8A-8
DVD PLAYER - REMOVAL...............8A-8
ELECTROLYTE LEVEL - STANDARD
PROCEDURE, CHECKING BATTERY.......8F-14
ELECTRONIC VARIABLE BRAKE
PROPORTIONING - DESCRIPTION........5-75
ELECTRONIC VARIABLE BRAKE
PROPORTIONING - OPERATION..........5-77
ELECTRONIC VEHICLE INFO CENTER -
DESCRIPTION........................8M-6
ELECTRONIC VEHICLE INFO CENTER -
INSTALLATION.......................8M-9
ELECTRONIC VEHICLE INFO CENTER -
OPERATION.........................8M-7
ELECTRONIC VEHICLE INFO CENTER -
REMOVAL...........................8M-9
ELECTRONIC VEHICLE INFORMATION
CENTER - DIAGNOSIS AND TESTING......8M-7
ELECTRONIC VEHICLE INFORMATION
CENTER PROGRAMMING - STANDARD
PROCEDURE.........................8M-7
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE DEVICES - STANDARD
PROCEDURE......................8W-01-8
ELEMENT - INSTALLATION, AIR
CLEANER........................9-24,9-98
ELEMENT - REMOVAL, AIR CLEANER . . 9-24,9-98
ELEMENTS - DESCRIPTION, HEATED
SEAT ..............................8G-10
ELEMENTS - DIAGNOSIS AND TESTING,
HEATED SEAT .......................8G-10
ELEMENTS - INSTALLATION, HEATED
SEAT ..............................8G-11
ELEMENTS - OPERATION, HEATED SEAT . . 8G-10
ELEMENTS - REMOVAL, HEATED SEAT . . . 8G-11
E-MARK LABEL - DESCRIPTION.......Intro.-11
EMISSION CONTROL INFORMATION
LABEL - DESCRIPTION, VEHICLE.........25-1
END CAP - INSTALLATION, INSTRUMENT
PANEL.............................23-68
END CAP - REMOVAL, INSTRUMENT
PANEL.............................23-68
END COVER BALL BEARING -
INSTALLATION.......................21-10
END COVER BALL BEARING - REMOVAL . . . 21-9
END COVER SEAL - INSTALLATION......21-11
END COVER SEAL - REMOVAL..........21-11
END PLAY - ADJUSTMENT,
DIFFERENTIAL SIDE GEAR.............21-70
END PLAY - STANDARD PROCEDURE,
CRANKSHAFT....................9-36,9s-6
END PLAY - STANDARD PROCEDURE,
MEASURING CAMSHAFT................9-29
END PLAY - STANDARD PROCEDURE,
MEASURING CRANKSHAFT.............9-125
END SEAL - INSTALLATION, INPUT
SHAFT.............................21-16
END SEAL - REMOVAL, INPUT SHAFT....21-15
ENGAGE ACTUATOR - DESCRIPTION.....8N-10
ENGAGE ACTUATOR - INSTALLATION.....8N-11
ENGAGE ACTUATOR - OPERATION
.......8N-11
ENGAGE ACTUATOR - REMOVAL
........8N-11
ENGINE - CLEANING
...................7-18
ENGINE - DESCRIPTION, 2.4L/3.3L/3.8L
. . . 19-51
ENGINE - DESCRIPTION, FUEL
REQUIREMENTS - DIESEL
...............0-6ENGINE - INSPECTION.................7-18
ENGINE - INSTALLATION, 2.4L.....19-46,19-49,
19-50,19-52
ENGINE - INSTALLATION, 3.3L/3.8L . 19-47,19-49,
19-50,19-52
ENGINE - INSTALLATION, A/C
COMPRESSOR MOUNTING BRACKET -
2.4L...............................24-76
ENGINE - REMOVAL, 2.4L . . . 19-45,19-48,19-50,
19-51
ENGINE - REMOVAL, 3.3L/3.8L....19-45,19-48,
19-50,19-51
ENGINE - REMOVAL, A/C COMPRESSOR
MOUNTING BRACKET - 2.4L............24-75
ENGINE - SPECIFICATIONS, 2.4L.....9-17,9s-1
ENGINE - STANDARD PROCEDURE,
HYDROSTATIC LOCKED.............9-10,9-85
ENGINE 2.4L - DESCRIPTION.............9-3
ENGINE 3.3/3.8L - DESCRIPTION.........9-76
ENGINE ASSEMBLY - INSTALLATION . . 9-16,9-89
ENGINE ASSEMBLY - REMOVAL......9-13,9-86
ENGINE BLOCK - CLEANING........9-112,9-36
ENGINE BLOCK - DESCRIPTION.....9-112,9-35
ENGINE BLOCK - INSPECTION......9-112,9-36
ENGINE BLOCK HEATER - DESCRIPTION . . . 7-20
ENGINE BLOCK HEATER - INSTALLATION . . . 7-20
ENGINE BLOCK HEATER - OPERATION.....7-20
ENGINE BLOCK HEATER - REMOVAL......7-20
ENGINE BLOCK HEATER TESTING -
DIAGNOSIS AND TESTING................7-20
ENGINE COOLANT - DESCRIPTION........7-19
ENGINE COOLANT - DESCRIPTION.........0-3
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - DESCRIPTION..........7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - INSTALLATION..........7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 2.4L - REMOVAL.............7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - DESCRIPTION.......7-21
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - INSTALLATION.......7-22
ENGINE COOLANT TEMPERATURE
SENSOR - 3.3/3.8L - REMOVAL..........7-21
ENGINE COOLANT THERMOSTAT - 2.4L -
INSTALLATION........................7-23
ENGINE COOLANT THERMOSTAT - 2.4L -
REMOVAL...........................7-23
ENGINE COOLANT THERMOSTAT -
3.3/3.8L - INSTALLATION...............7-24
ENGINE COOLANT THERMOSTAT -
3.3/3.8L - REMOVAL...................7-23
ENGINE COOLANT THERMOSTAT -
DESCRIPTION........................7-22
ENGINE COOLANT THERMOSTAT -
DIAGNOSIS AND TESTING..............7-23
ENGINE COOLANT THERMOSTAT -
OPERATION..........................7-22
ENGINE COOLING SYSTEM - DIAGNOSIS
AND TESTING........................7-14
ENGINE COOLING SYSTEM
REQUIREMENTS - DESCRIPTION.........24-1
ENGINE COOLING SYSTEM, WARNING
....24-65
ENGINE CORE AND OIL GALLERY PLUGS
- STANDARD PROCEDURE
..........9-10,9-86
ENGINE DIAGNOSIS - INTRODUCTION -
DIAGNOSIS AND TESTING
...........9-3,9-76
ENGINE DIAGNOSIS - MECHANICAL -
DIAGNOSIS AND TESTING
...........9-6,9-80
ENGINE DIAGNOSIS - PERFORMANCE -
DIAGNOSIS AND TESTING
...........9-4,9-78
ENGINE GASKET SURFACE
PREPARATION - STANDARD
PROCEDURE
.....................9-11,9-85
ENGINE MOUNTING - DESCRIPTION
. 9-131,9-48
ENGINE OIL - DESCRIPTION, FLEXIBLE
FUEL
................................0-3
ENGINE OIL - DIESEL ENGINES -
DESCRIPTION
.........................0-6
ENGINE OIL AND FILTER CHANGE -
STANDARD PROCEDURE
...........9-137,9-53
ENGINE OIL AND LUBRICANTS -
DESCRIPTION
.........................0-1
ENGINE OIL LEAK INSPECTION -
DIAGNOSIS AND TESTING
...........9-8,9-82
ENGINE OIL LEVEL CHECK - STANDARD
PROCEDURE
........................9-137
12 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2557 of 2585
FILL/CHECK LOCATIONS - DESCRIPTION,
FLUID...............................0-7
FILLER CAP - DESCRIPTION, FUEL.......25-12
FILLER CAP - OPERATION, FUEL........25-12
FILLER NECK SEAL - DIAGNOSIS AND
TESTING, RADIATOR CAP TO............7-27
FILLER TUBE - INSTALLATION, FUEL
TANK ..............................14-13
FILLER TUBE - REMOVAL, FUEL TANK....14-12
FILLING - STANDARD PROCEDURE,
COOLING SYSTEM.....................7-5
FILLING - STANDARD PROCEDURE,
REAR HEATER CORE.................24-101
FILTER - DESCRIPTION, AIR............24-43
FILTER - DESCRIPTION, OIL.............9-53
FILTER - INSTALLATION, AIR...........24-44
FILTER - INSTALLATION, INLET..........14-13
FILTER - INSTALLATION, OIL.......9-139,9-53
FILTER - REMOVAL, AIR...............24-43
FILTER - REMOVAL, INLET.............14-13
FILTER - REMOVAL, OIL...........9-139,9-53
FILTER ADAPTER - INSTALLATION, OIL . . . 9-139
FILTER ADAPTER - REMOVAL, OIL.......9-139
FILTER CHANGE - STANDARD
PROCEDURE, ENGINE OIL..........9-137,9-53
FILTER SERVICE - STANDARD
PROCEDURE, FLUID..........21-203,21s-104
FINAL DRIVE - ASSEMBLY......21-195,21s-99
FINAL DRIVE - DESCRIPTION............21s-95
FINAL DRIVE - DISASSEMBLY....21-190,21s-96
FINAL DRIVE - OPERATION............21s-96
FINESSE SANDING/BUFFING &
POLISHING - DESCRIPTION............23-85
FINISH - DESCRIPTION, BASE
COAT/CLEARCOAT....................23-85
FIRING ORDER, SPECIFICATIONS.........8I-3
FIRST ROW - BENCH - INSTALLATION,
SEAT BELT BUCKLE..................8O-13
FIRST ROW - BENCH - REMOVAL, SEAT
BELT BUCKLE.......................8O-13
FIRST ROW - OUTBOARD -
INSTALLATION, SEAT BELT &
RETRACTOR........................8O-14
FIRST ROW - OUTBOARD - REMOVAL,
SEAT BELT & RETRACTOR.............8O-14
FIRST ROW INBOARD - QUAD BUCKET -
INSTALLATION, SEAT BELT BUCKLE......8O-12
FIRST ROW INBOARD - QUAD BUCKET -
REMOVAL, SEAT BELT BUCKLE.........8O-12
FITTING - CONNECTING ROD............9-45
FITTING - PISTON RING................9-45
FITTING - STANDARD PROCEDURE,
MAIN BEARING......................9-123
FITTING - STANDARD PROCEDURE,
PISTON RING.......................9-121
FITTING - STANDARD PROCEDURE,
PISTON TO CYLINDER BORE............9-42
FITTING CONNECTING RODS -
STANDARD PROCEDURE...............9-116
FITTING PISTONS - STANDARD
PROCEDURE........................9-117
FITTINGS - STANDARD PROCEDURE,
HANDLING TUBING...................24-70
FITTINGS - STANDARD PROCEDURE,
QUICK-CONNECT.....................14-14
FLANGE SEAL - INSTALLATION, INPUT....3-45
FLANGE SEAL - INSTALLATION, OUTPUT . . . 3-46
FLANGE SEAL - REMOVAL, INPUT
........3-44
FLANGE SEAL - REMOVAL, OUTPUT
.......3-45
FLANGE SHIM SELECTION,
ADJUSTMENTS - OUTPUT
...............21-7
FLAP AND SPRING ASSEMBLY -
INSTALLATION, QUAD BUCKET SEAT
SIDE SHIELD/CUPHOLDER
............23-107
FLAP AND SPRING ASSEMBLY -
REMOVAL, QUAD BUCKET SEAT SIDE
SHIELD/CUPHOLDER
.................23-107
FLEX DRIVE - DESCRIPTION
...........8N-36
FLEX DRIVE - INSTALLATION
...........8N-37
FLEX DRIVE - OPERATION
.............8N-36
FLEX DRIVE - REMOVAL
...............8N-37
FLEX PLATE - INSTALLATION
...........9-131
FLEX PLATE - REMOVAL
...............9-131
FLEXIBLE FUEL ENGINE OIL -
DESCRIPTION
.........................0-3
FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - INSTALLATION
............23-83FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - REMOVAL................23-83
FLOOR CONSOLE TRAY - INSTALLATION . . 23-83
FLOOR CONSOLE TRAY - REMOVAL......23-83
FLOOR DISTRIBUTION DUCTS -
INSTALLATION.......................24-50
FLOOR DISTRIBUTION DUCTS -
REMOVAL..........................24-50
FLOOR HEAT DUCT - INSTALLATION,
REAR..............................24-63
FLOOR HEAT DUCT - REMOVAL, REAR . . . 24-62
FLOOR MATS - INSTALLATION, CARPETS . 23-76
FLOOR MATS - REMOVAL, CARPETS.....23-75
FLOW AND PRESSURE TEST -
DIAGNOSIS AND TESTING, POWER
STEERING SYSTEM....................19-1
FLOW CHECK - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-3
FLUID - DESCRIPTION, AUTOMATIC/
MANUAL TRANSAXLE...................0-4
FLUID - DESCRIPTION, AWD POWER
TRANSFER UNIT.......................0-6
FLUID AND FILTER SERVICE -
STANDARD PROCEDURE.......21-203,21s-104
FLUID CAPACITIES - SPECIFICATIONS......0-6
FLUID CHANGE - STANDARD
PROCEDURE, DIFFERENTIAL
ASSEMBLY..........................3-40
FLUID CHANGE - STANDARD
PROCEDURE, OVERRUNNING CLUTCH
HOUSING............................3-41
FLUID CHANGE - STANDARD
PROCEDURE, PTU......................21-5
FLUID CONTAMINATION - DIAGNOSIS
AND TESTING, BRAKE.............5-32,5s-31
FLUID COOLER - DESCRIPTION.........19-44
FLUID COOLER - INSTALLATION.........19-45
FLUID COOLER - OPERATION...........19-44
FLUID COOLER - REMOVAL............19-44
FLUID DRAIN AND FILL - STANDARD
PROCEDURE........................21-71
FLUID FILL/CHECK LOCATIONS -
DESCRIPTION.........................0-7
FLUID LEAK DIAGNOSIS, DIAGNOSIS
AND TESTING........................21-3
FLUID LEAKAGE - DIAGNOSIS AND
TESTING, TORQUE CONVERTER
HOUSING....................21-123,21s-31
FLUID LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE.......21-201,21s-102
FLUID LEVEL CHECK - STANDARD
PROCEDURE........................21-71
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE..............5-32,5s-31
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING........19-44
FLUID LEVEL INSPECTION - STANDARD
PROCEDURE.........................21-4
FLUID LEVEL SWITCH - DESCRIPTION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - INSTALLATION,
BRAKE.........................5-11,5s-10
FLUID LEVEL SWITCH - INSTALLATION,
WASHER...........................8R-12
FLUID LEVEL SWITCH - OPERATION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - REMOVAL,
BRAKE
.........................5-11,5s-10
FLUID LEVEL SWITCH - REMOVAL,
WASHER
...........................8R-12
FLUID, SPECIFICATIONS - BRAKE
....5-33,5s-32
FLUIDS - DESCRIPTION, AWD REAR
DRIVELINE MODULE
....................0-6
FLUSH MEASUREMENTS -
SPECIFICATIONS, GAP
................23-124
FLYWHEEL - INSTALLATION
.............6-12
FLYWHEEL - REMOVAL
.................6-12
FOG LAMP - DIAGNOSIS AND TESTING,
FRONT
..............................8L-7
FOG LAMP - INSTALLATION, FRONT
.......8L-8
FOG LAMP - REMOVAL, FRONT
..........8L-8
FOG LAMP UNIT ALIGNMENT - EXPORT
- STANDARD PROCEDURE, FRONT
........8L-9
FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE, FRONT
.........8L-9
FOLDAWAY MIRROR SWITCH - EXPORT
- DESCRIPTION, POWER
..............8N-48FOLDAWAY MIRROR SWITCH - EXPORT
- INSTALLATION, POWER..............8N-49
FOLDAWAY MIRROR SWITCH - EXPORT
- OPERATION, POWER................8N-48
FOLDAWAY MIRROR SWITCH - EXPORT
- REMOVAL, POWER..................8N-48
FORK AND SHAFT - DESCRIPTION,
SHIFT.............................21-113
FORM-IN-PLACE GASKETS AND
SEALERS - STANDARD PROCEDURE . . 9-11,9-84
FRAME DIMENSIONS, SPECIFICATIONS....13-4
FRONT - DESCRIPTION, HALF SHAFT.......3-1
FRONT - INSTALLATION, CRANKSHAFT
OIL SEAL.......................9-127,9-40
FRONT - INSTALLATION, HALF SHAFT......3-4
FRONT - INSTALLATION, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - INSTALLATION, SPRING
MOUNTS............................2-44
FRONT - INSTALLATION, WHEEL
MOUNTING STUDS...................22-21
FRONT - REMOVAL, CRANKSHAFT OIL
SEAL..........................9-127,9-40
FRONT - REMOVAL, HALF SHAFT..........3-2
FRONT - REMOVAL, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - REMOVAL, SPRING MOUNTS.....2-43
FRONT - REMOVAL, WHEEL MOUNTING
STUDS.............................22-20
FRONT - SPECIFICATIONS, HALF SHAFT . . . 3-15,
3-6
FRONT BRAKE ROTOR - INSTALLATION.....5-54,
5s-57
FRONT BRAKE ROTOR - REMOVAL . . . 5-54,5s-57
FRONT BUMPER REINFORCEMENT -
INSTALLATION........................13-2
FRONT BUMPER REINFORCEMENT -
REMOVAL...........................13-2
FRONT BUSHING - INSTALLATION, LEAF
SPRING.............................2-30
FRONT BUSHING - REMOVAL, LEAF
SPRING.............................2-29
FRONT CABLE - INSTALLATION.....5-64,5s-67
FRONT CABLE - INSTALLATION,
PARKING BRAKE LEVER...........5-66,5s-69
FRONT CABLE - REMOVAL.........5-64,5s-67
FRONT CABLE - REMOVAL, PARKING
BRAKE LEVER...................5-65,5s-68
FRONT CONTROL MODULE -
DESCRIPTION........................8E-7
FRONT CONTROL MODULE - DIAGNOSIS
AND TESTING........................8E-7
FRONT CONTROL MODULE -
INSTALLATION........................8E-8
FRONT CONTROL MODULE - OPERATION . . 8E-7
FRONT CONTROL MODULE - REMOVAL....8E-8
FRONT CRADLE CROSSMEMBER -
DESCRIPTION........................13-9
FRONT CRADLE CROSSMEMBER
THREAD REPAIR - DESCRIPTION
.........13-9
FRONT CROSSMEMBER MOUNT
BUSHINGS - INSTALLATION
............13-12
FRONT CROSSMEMBER MOUNT
BUSHINGS - REMOVAL
................13-12
FRONT DISC BRAKE CALIPER ADAPTER
- INSTALLATION
.................5-31,5s-30
FRONT DISC BRAKE CALIPER ADAPTER
- REMOVAL
.....................5-31,5s-30
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
INSTALLATION
.......................5s-26
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
REMOVAL
..........................5s-23
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - INSTALLATION
.....5-27
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - REMOVAL
.........5-24
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-27
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) - REMOVAL
.......5-24
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - INSTALLATION
..............5s-26
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - REMOVAL
.................5s-23
14 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2558 of 2585
FRONT DISC BRAKE SHOES
(CONTINENTAL TEVES BRAKES) -
INSTALLATION.......................5s-15
FRONT DISC BRAKE SHOES
(CONTINENTAL TEVES BRAKES) -
REMOVAL..........................5s-14
FRONT DISC BRAKE SHOES (DISC/DISC
BRAKES) - INSTALLATION...............5-16
FRONT DISC BRAKE SHOES (DISC/DISC
BRAKES) - REMOVAL..................5-14
FRONT DISC BRAKE SHOES (DISC/
DRUM BRAKES) - INSTALLATION.........5-17
FRONT DISC BRAKE SHOES (DISC/
DRUM BRAKES) - REMOVAL............5-15
FRONT DISC BRAKE SHOES (TRW
BRAKES) - INSTALLATION..............5s-16
FRONT DISC BRAKE SHOES (TRW
BRAKES) - REMOVAL.................5s-14
FRONT DOOR GLASS RUN
WEATHERSTRIP - INSTALLATION.......23-113
FRONT DOOR GLASS RUN
WEATHERSTRIP - REMOVAL...........23-113
FRONT DOOR INNER BELT MOLDING -
INSTALLATION......................23-115
FRONT DOOR INNER BELT MOLDING -
REMOVAL.........................23-115
FRONT DOOR OUTER BELT MOLDING -
INSTALLATION......................23-113
FRONT DOOR OUTER BELT MOLDING -
REMOVAL.........................23-113
FRONT DOOR WEATHERSTRIP -
INSTALLATION......................23-114
FRONT DOOR WEATHERSTRIP -
REMOVAL.........................23-114
FRONT FASCIA - INSTALLATION..........13-1
FRONT FASCIA - REMOVAL..............13-1
FRONT FENDER - INSTALLATION........23-52
FRONT FENDER - REMOVAL............23-52
FRONT FOG LAMP - DIAGNOSIS AND
TESTING............................8L-7
FRONT FOG LAMP - INSTALLATION.......8L-8
FRONT FOG LAMP - REMOVAL...........8L-8
FRONT FOG LAMP UNIT ALIGNMENT -
EXPORT - STANDARD PROCEDURE.......8L-9
FRONT FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE................8L-9
FRONT INBOARD - INSTALLATION, SEAT
BELT BUCKLE.......................8O-12
FRONT INBOARD - REMOVAL, SEAT
BELT BUCKLE.......................8O-12
FRONT MOUNT - INSTALLATION....9-131,9-49
FRONT MOUNT - REMOVAL........9-131,9-49
FRONT SEAT - INSTALLATION...........23-91
FRONT SEAT - REMOVAL..............23-91
FRONT SEAT BACK - INSTALLATION......23-92
FRONT SEAT BACK - REMOVAL.........23-92
FRONT SEAT CUSHION SIDE COVER -
INSTALLATION.......................23-94
FRONT SEAT CUSHION SIDE COVER -
REMOVAL..........................23-94
FRONT SEAT RISER - MANUAL TRACK -
INSTALLATION.......................23-95
FRONT SEAT RISER - MANUAL TRACK -
REMOVAL..........................23-94
FRONT SEAT TRACK - REAR COVER -
INSTALLATION.......................23-96
FRONT SEAT TRACK - REAR COVER -
REMOVAL..........................23-96
FRONT SEAT TRACK MANUAL
ADJUSTER - INSTALLATION............23-95
FRONT SEAT TRACK MANUAL
ADJUSTER - REMOVAL................23-95
FRONT SEAT TRACK POWER ADJUSTER
- INSTALLATION.....................23-95
FRONT SEAT TRACK POWER ADJUSTER
- REMOVAL.........................23-95
FRONT SEATBACK ASSIST STRAP -
INSTALLATION.......................23-92
FRONT SEATBACK ASSIST STRAP -
REMOVAL..........................23-92
FRONT SEATBACK COVER -
INSTALLATION.......................23-93
FRONT SEATBACK COVER - REMOVAL
....23-93
FRONT SEATBACK PANEL -
INSTALLATION
.......................23-93
FRONT SEATBACK PANEL - REMOVAL
....23-92
FRONT SUSPENSION - DESCRIPTION
......2-2
FRONT SUSPENSION - OPERATION
........2-2FRONT SUSPENSION FASTENER
TORQUE, SPECIFICATIONS...............2-3
FRONT SUSPENSION, SPECIAL TOOLS.....2-3
FRONT WASHER PUMP MOTOR -
INSTALLATION.......................8R-8
FRONT WASHER PUMP MOTOR -
REMOVAL...........................8R-8
FRONT WHEEL SPEED SENSOR -
INSTALLATION........................5-80
FRONT WHEEL SPEED SENSOR -
REMOVAL...........................5-79
FRONT WHEELHOUSE SPLASH SHIELD -
INSTALLATION.......................23-55
FRONT WHEELHOUSE SPLASH SHIELD -
REMOVAL..........................23-55
FRONT WIPER ARM ALIGNMENT -
STANDARD PROCEDURE...............8R-8
FRONT WIPER ARMS - INSTALLATION....8R-9
FRONT WIPER ARMS - REMOVAL........8R-9
FRONT WIPER MOTOR - INSTALLATION . . . 8R-9
FRONT WIPER MOTOR - REMOVAL.......8R-9
FRONT WIPER SYSTEM - DIAGNOSIS
AND TESTING........................8R-2
FRONT WIPER/WASHER SWITCH -
DIAGNOSIS AND TESTING..............8R-2
FRONT/QUAD SEAT CUSHION -
INSTALLATION.......................23-93
FRONT/QUAD SEAT CUSHION -
REMOVAL..........................23-93
FRONT-WHEEL-DRIVE - INSTALLATION....2-36
FRONT-WHEEL-DRIVE - REMOVAL........2-36
FUEL CORRECTION OR ADAPTIVE
MEMORIES, OPERATION...............14-20
FUEL DELIVERY - DESCRIPTION..........14-2
FUEL DELIVERY - OPERATION...........14-2
FUEL DELIVERY SYSTEM - DIAGNOSIS
AND TESTING........................14-2
FUEL DOSING PUMP - DESCRIPTION....24-115
FUEL DOSING PUMP - INSTALLATION . . . 24-116
FUEL DOSING PUMP - OPERATION.....24-115
FUEL DOSING PUMP - REMOVAL.......24-115
FUEL ENGINE OIL - DESCRIPTION,
FLEXIBLE.............................0-3
FUEL FILL DOOR - INSTALLATION.......23-52
FUEL FILL DOOR - REMOVAL...........23-52
FUEL FILL DOOR BLOCKER LATCH -
INSTALLATION.......................23-53
FUEL FILL DOOR BLOCKER LATCH -
REMOVAL..........................23-53
FUEL FILL DOOR BLOCKER LATCH
STRIKER - INSTALLATION..............23-53
FUEL FILL DOOR BLOCKER LATCH
STRIKER - REMOVAL.................23-53
FUEL FILL DOOR BLOCKER LOCKOUT
LINK - INSTALLATION.................23-54
FUEL FILL DOOR BLOCKER LOCKOUT
LINK - REMOVAL.....................23-53
FUEL FILLER CAP - DESCRIPTION.......25-12
FUEL FILLER CAP - OPERATION.........25-12
FUEL INJECTOR - DESCRIPTION.........14-26
FUEL INJECTOR - OPERATION..........14-26
FUEL LEVEL SENDING UNIT / SENSOR -
DESCRIPTION........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
INSTALLATION........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
OPERATION..........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
REMOVAL...........................14-5
FUEL LINE - INSTALLATION...........24-118
FUEL LINE - REMOVAL...............24-117
FUEL LINES/HOSES AND CLAMPS -
DESCRIPTION........................14-6
FUEL PRESSURE REGULATOR -
INSTALLATION........................14-7
FUEL PRESSURE REGULATOR -
OPERATION..........................14-7
FUEL PRESSURE REGULATOR -
REMOVAL...........................14-7
FUEL PUMP - DESCRIPTION.............14-8
FUEL PUMP - OPERATION..............14-8
FUEL PUMP MODULE - DESCRIPTION.....14-8
FUEL PUMP MODULE - INSTALLATION....14-9
FUEL PUMP MODULE - OPERATION
.......14-8
FUEL PUMP MODULE - REMOVAL
........14-8
FUEL PUMP RELAY - DESCRIPTION
......14-28
FUEL PUMP RELAY - OPERATION
........14-28
FUEL REQUIREMENTS - DESCRIPTION
......0-4FUEL REQUIREMENTS - DIESEL ENGINE
- DESCRIPTION........................0-6
FUEL, SPECIAL TOOLS............14-23,14-4
FUEL SYSTEM PRESSURE RELEASE
PROCEDURE - STANDARD
PROCEDURE.........................14-2
FUEL SYSTEM PRESSURE,
SPECIFICATIONS......................14-3
FUEL TANK - DESCRIPTION............14-10
FUEL TANK - INSTALLATION............14-12
FUEL TANK - OPERATION..............14-11
FUEL TANK - REMOVAL...............14-11
FUEL TANK - STANDARD PROCEDURE,
DRAINING...........................14-2
FUEL TANK FILLER TUBE -
INSTALLATION.......................14-13
FUEL TANK FILLER TUBE - REMOVAL....14-12
FULL OPEN SWITCH - DESCRIPTION....8N-12,
8N-31
FULL OPEN SWITCH - INSTALLATION....8N-13
FULL OPEN SWITCH - OPERATION . 8N-12,8N-31
FULL OPEN SWITCH - REMOVAL........8N-13
FUNCTIONS - DESCRIPTION, CIRCUIT . . 8W-01-6
FUSE - DESCRIPTION, IOD...........8W-97-3
FUSE - OPERATION, IOD.............8W-97-3
FUSES POWERING SEVERAL LOADS -
STANDARD PROCEDURE, TESTING
FOR A SHORT TO GROUND ON......8W-01-10
FWD - INSTALLATION..................2-45
FWD - INSTALLATION, REAR WHEEL
SPEED SENSOR.......................5-81
FWD - INSTALLATION, SPRING...........2-42
FWD - REMOVAL......................2-45
FWD - REMOVAL, REAR WHEEL SPEED
SENSOR............................5-81
FWD - REMOVAL, SPRING..............2-41
GALLERY PLUGS - STANDARD
PROCEDURE, ENGINE CORE AND OIL . 9-10,9-86
GAP AND FLUSH MEASUREMENTS -
SPECIFICATIONS....................23-124
GAP, SPECIFICATIONS - WHEEL SPEED
SENSOR AIR.........................5-79
GAS - INSTALLATION, MODULAR
CLUTCH ASSY - 2.4L..................6-11
GAS - REMOVAL, MODULAR CLUTCH
ASSY - 2.4L..........................6-11
GASKET - DIAGNOSIS AND TESTING,
CYLINDER HEAD.............9-24,9-99,9s-16
GASKET SURFACE PREPARATION -
STANDARD PROCEDURE, ENGINE....9-11,9-85
GASKETS AND SEALERS - STANDARD
PROCEDURE, FORM-IN-PLACE.......9-11,9-84
GASOLINE ENGINES - DIAGNOSIS AND
TESTING, SYSTEM CHARGE LEVEL
TEST..............................24-67
GEAR - DESCRIPTION.................19-26
GEAR - INSTALLATION, LHD............19-32
GEAR - INSTALLATION, RHD............19-33
GEAR & LINK ROD - DESCRIPTION, LIFT . 8N-16
GEAR & LINK ROD - INSTALLATION,
LIFT...............................8N-16
GEAR & LINK ROD - OPERATION, LIFT . . . 8N-16
GEAR & LINK ROD - REMOVAL, LIFT.....8N-16
GEAR - OPERATION...................19-27
GEAR - REMOVAL, LHD...............19-27
GEAR - REMOVAL, RHD...............19-31
GEAR END PLAY - ADJUSTMENT,
DIFFERENTIAL SIDE..................21-70
GEAR SHIFT CABLE - INSTALLATION....21-205
GEAR SHIFT CABLE - REMOVAL . 21-204,21s-105
GEAR SHIFT LEVER - INSTALLATION.....19-21
GEAR SHIFT LEVER - REMOVAL.........19-21
GEAR, SPECIAL TOOLS - POWER
STEERING..........................19-34
GEARSHIFT BOOT - INSTALLATION......21-73
GEARSHIFT BOOT - REMOVAL..........21-72
GEARSHIFT CABLE - CROSSOVER -
INSTALLATION.......................21-76
GEARSHIFT CABLE - CROSSOVER -
REMOVAL..........................21-73
GEARSHIFT CABLE - SELECTOR -
INSTALLATION
.......................21-84
GEARSHIFT CABLE - SELECTOR -
REMOVAL
..........................21-81
GEARSHIFT CABLE ADJUSTMENT,
ADJUSTMENTS
.....................21-206
GEARSHIFT KNOB - INSTALLATION
......21-87
GEARSHIFT KNOB - REMOVAL
..........21-87
RSINDEX15
Description Group-Page Description Group-Page Description Group-Page
Page 2564 of 2585
LOWER HINGE - REMOVAL.............23-28
LOWER INSTRUMENT PANEL -
INSTALLATION.......................23-69
LOWER INSTRUMENT PANEL -
REMOVAL..........................23-69
LOWER INTAKE MANIFOLD -
INSTALLATION.......................9-149
LOWER INTAKE MANIFOLD - REMOVAL . . . 9-148
LOWER STEERING COLUMN COVER -
INSTALLATION.......................23-70
LOWER STEERING COLUMN COVER -
REMOVAL..........................23-70
LOWER TRIM - INSTALLATION,
B-PILLAR...........................23-75
LOWER TRIM - REMOVAL, B-PILLAR.....23-74
LUBRICANTS - DESCRIPTION, ENGINE
OIL .................................0-1
LUBRICATION - DESCRIPTION......9-136,9-52
LUBRICATION - OPERATION........9-136,9-52
LUBRICATION - STANDARD PROCEDURE....2-2
LUBRICATION POINTS - DESCRIPTION......0-7
LUBRICATION, SPECIFICATIONS - BODY . . 23-12
LUGGAGE RACK CROSSBAR -
INSTALLATION.......................23-57
LUGGAGE RACK CROSSBAR - REMOVAL . . 23-56
LUGGAGE RACK RISER - INSTALLATION . . 23-56
LUGGAGE RACK RISER - REMOVAL......23-55
LUMBAR SUPPORT - INSTALLATION....23-106
LUMBAR SUPPORT - REMOVAL........23-106
LWB - INSTALLATION, SEAT BELT &
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR HVAC..........8O-16
LWB - REMOVAL, SEAT BELT &
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR HVAC..........8O-16
MACHINING - STANDARD PROCEDURE,
BRAKE ROTOR..................5-53,5s-56
MAIN BEARING FITTING - STANDARD
PROCEDURE........................9-123
MAIN BEARINGS - INSTALLATION,
CRANKSHAFT.......................9-124
MAIN BEARINGS - REMOVAL,
CRANKSHAFT.......................9-124
MANAGER - DESCRIPTION, TASK........25-24
MANAGER - OPERATION, TASK.........25-24
MANIFOLD - CLEANING, EXHAUST........9-61
MANIFOLD - DESCRIPTION, INTAKE . . 9-144,9-58
MANIFOLD - INSPECTION, EXHAUST......9-61
MANIFOLD - INSTALLATION, EXHAUST....9-61
MANIFOLD - INSTALLATION, LOWER
INTAKE ............................9-149
MANIFOLD - INSTALLATION, UPPER
INTAKE ............................9-147
MANIFOLD - LEFT - CLEANING,
EXHAUST...........................9-152
MANIFOLD - LEFT - INSPECTION,
EXHAUST...........................9-152
MANIFOLD - LEFT - INSTALLATION,
EXHAUST...........................9-152
MANIFOLD - LEFT - REMOVAL, EXHAUST . 9-152
MANIFOLD - LOWER - CLEANING,
INTAKE ............................9-148
MANIFOLD - LOWER - INSPECTION,
INTAKE ........................9-148,9-60
MANIFOLD - LOWER - INSTALLATION,
INTAKE .............................9-60
MANIFOLD - LOWER - REMOVAL,
INTAKE .............................9-60
MANIFOLD - REMOVAL, EXHAUST........9-61
MANIFOLD - REMOVAL, LOWER INTAKE . . 9-148
MANIFOLD - REMOVAL, UPPER INTAKE . . . 9-145
MANIFOLD - RIGHT - CLEANING,
EXHAUST...........................9-151
MANIFOLD - RIGHT - INSPECTION,
EXHAUST...........................9-151
MANIFOLD - RIGHT - INSTALLATION,
EXHAUST...........................9-151
MANIFOLD - RIGHT - REMOVAL,
EXHAUST...........................9-150
MANIFOLD - UPPER - INSPECTION,
INTAKE
.............................9-59
MANIFOLD - UPPER - INSTALLATION,
INTAKE
.............................9-59
MANIFOLD - UPPER - REMOVAL, INTAKE
. . 9-58
MANIFOLD LEAKS - DIAGNOSIS AND
TESTING, INTAKE
................9-145,9-58
MANIFOLD STRIPPED THREAD REPAIR -
STANDARD PROCEDURE
...............9-145MANIFOLD VACUUM PORT REPAIR -
STANDARD PROCEDURE, INTAKE........9-145
MANUAL - INSTALLATION, WINDOW
REGULATOR........................23-23
MANUAL - REMOVAL, WINDOW
REGULATOR........................23-22
MANUAL ADJUSTER - INSTALLATION,
FRONT SEAT TRACK..................23-95
MANUAL ADJUSTER - REMOVAL, FRONT
SEAT TRACK........................23-95
MANUAL TEMPERATURE CONTROL
(MTC) - INSTALLATION................24-29
MANUAL TEMPERATURE CONTROL
(MTC) - REMOVAL...................24-29
MANUAL TEMPERATURE CONTROL
SYSTEM - OPERATION...............24-112
MANUAL THREE ZONE - DESCRIPTION....24-2
MANUAL THREE ZONE - OPERATION......24-5
MANUAL TRACK - INSTALLATION,
FRONT SEAT RISER...................23-95
MANUAL TRACK - REMOVAL, FRONT
SEAT RISER.........................23-94
MANUAL TRANSAXLE - ASSEMBLY, T850 . 21-42
MANUAL TRANSAXLE - DESCRIPTION,
T850..............................21-21
MANUAL TRANSAXLE - DISASSEMBLY,
T850..............................21-35
MANUAL TRANSAXLE - INSTALLATION,
T850..............................21-51
MANUAL TRANSAXLE - OPERATION,
T850..............................21-24
MANUAL TRANSAXLE - REMOVAL, T850 . . 21-31
MANUAL TRANSAXLE - SPECIFICATIONS,
T850..............................21-56
MANUFACTURER PLATE - DESCRIPTION . Intro.-11
MAP SENSOR - DESCRIPTION..........14-30
MAP SENSOR - OPERATION............14-30
MASTER CYLINDER - LHD -
INSTALLATION........................6-10
MASTER CYLINDER - LHD - REMOVAL.....6-9
MASTER CYLINDER - RHD -
INSTALLATION.........................6-9
MASTER CYLINDER - RHD - REMOVAL.....6-8
MASTER CYLINDER BLEEDING -
STANDARD PROCEDURE...........5-35,5s-34
MASTER CYLINDER (FLUID RESERVOIR)
- ASSEMBLY....................5-38,5s-37
MASTER CYLINDER (FLUID RESERVOIR)
- DISASSEMBLY.................5-37,5s-36
MATCH MOUNTING - STANDARD
PROCEDURE, TIRE AND WHEEL..........22-7
MATS - INSTALLATION, CARPETS AND
FLOOR.............................23-76
MATS - REMOVAL, CARPETS AND
FLOOR.............................23-75
MEASUREMENT - STANDARD
PROCEDURE, CURB HEIGHT.............2-55
MEASUREMENT AND ADJUSTMENT,
ADJUSTMENTS - DIFFERENTIAL
BEARING PRELOAD.................21s-100
MEASUREMENTS - SPECIFICATIONS,
GAP AND FLUSH
....................23-124
MEASURING BEARING CLEARANCE
USING PLASTIGAGE - STANDARD
PROCEDURE
.....................9-12,9-84
MEASURING CAMSHAFT END PLAY -
STANDARD PROCEDURE
................9-29
MEASURING CONNECTING ROD
BEARING CLEARANCE - STANDARD
PROCEDURE
........................9-120
MEASURING CRANKSHAFT END PLAY -
STANDARD PROCEDURE
...............9-125
MEASURING TIMING CHAIN WEAR -
STANDARD PROCEDURE
...............9-153
MECHANICAL - DIAGNOSIS AND
TESTING, ENGINE DIAGNOSIS
........9-6,9-80
MECHANISM - INSTALLATION,
GEARSHIFT
.........................21-89
MECHANISM - REMOVAL, GEARSHIFT
....21-87
MEMORIES, OPERATION - FUEL
CORRECTION OR ADAPTIVE
............14-20
MEMORY SEAT/MIRROR MODULE -
DESCRIPTION
.......................8E-10
MEMORY SEAT/MIRROR MODULE -
DIAGNOSIS AND TESTING
.............8E-10
MEMORY SEAT/MIRROR MODULE -
INSTALLATION
.......................8E-10MEMORY SEAT/MIRROR MODULE -
OPERATION.........................8E-10
MEMORY SEAT/MIRROR MODULE -
REMOVAL..........................8E-10
MEMORY SET SWITCH - DESCRIPTION . . 8N-12,
8N-55
MEMORY SET SWITCH - INSTALLATION . . 8N-13,
8N-56
MEMORY SET SWITCH - OPERATION....8N-13,
8N-56
MEMORY SET SWITCH - REMOVAL . 8N-13,8N-56
MEMORY SWITCH - DIAGNOSIS AND
TESTING......................8N-13,8N-56
MEMORY SYSTEM - DESCRIPTION . . 8N-51,8N-8
MEMORY SYSTEM - DIAGNOSIS AND
TESTING......................8N-10,8N-53
MEMORY SYSTEM - OPERATION....8N-52,8N-9
METRIC SYSTEM - DESCRIPTION......Intro.-6
MINI-TRIP COMPUTER - DIAGNOSIS
AND TESTING, COMPASS.............8M-10
MIRROR - DESCRIPTION, AUTOMATIC
DAY / NIGHT........................8N-47
MIRROR - DIAGNOSIS AND TESTING,
AUTOMATIC DAY / NIGHT..............8N-47
MIRROR - INSTALLATION, REAR VIEW . . . 23-81
MIRROR - INSTALLATION, SIDE VIEW....23-59
MIRROR - OPERATION, AUTOMATIC DAY
/ NIGHT............................8N-47
MIRROR - REMOVAL, REAR VIEW.......23-81
MIRROR - REMOVAL, SIDE VIEW........23-59
MIRROR - REMOVAL, SIDEVIEW..........8N-49
MIRROR GLASS - INSTALLATION, SIDE
VIEW..............................23-59
MIRROR GLASS - REMOVAL, SIDE VIEW . . 23-59
MIRROR SWITCH - EXPORT -
DESCRIPTION, POWER FOLDAWAY......8N-48
MIRROR SWITCH - EXPORT -
INSTALLATION, POWER FOLDAWAY......8N-49
MIRROR SWITCH - EXPORT -
OPERATION, POWER FOLDAWAY........8N-48
MIRROR SWITCH - EXPORT - REMOVAL,
POWER FOLDAWAY..................8N-48
MIRRORS - DESCRIPTION, HEATED.......8G-6
MIRRORS - DESCRIPTION, POWER......8N-45
MIRRORS - DIAGNOSIS AND TESTING,
POWER............................8N-46
MIRRORS - OPERATION, HEATED........8G-6
MIRRORS - OPERATION, POWER........8N-45
MISALIGNMENT - DIAGNOSIS AND
TESTING, DRIVE PLATE.................6-6
MODE DOOR ACTUATOR - DESCRIPTION . . 24-30
MODE DOOR ACTUATOR -
INSTALLATION.......................24-31
MODE DOOR ACTUATOR - OPERATION . . . 24-30
MODE DOOR ACTUATOR - REAR -
DESCRIPTION.......................24-39
MODE DOOR ACTUATOR - REAR -
INSTALLATION.......................24-40
MODE DOOR ACTUATOR - REAR -
OPERATION.........................24-40
MODE DOOR ACTUATOR - REAR -
REMOVAL..........................24-40
MODE DOOR ACTUATOR - REMOVAL.....24-30
MODE, OPERATION - DRB IIITS TAT E
DISPLAY TEST........................25-9
MODES OF OPERATION - OPERATION....14-18
MODULAR CLUTCH ASSY - 2.4L GAS -
INSTALLATION........................6-11
MODULAR CLUTCH ASSY - 2.4L GAS -
REMOVAL...........................6-11
MODULE - BLOWER MOTOR -
DESCRIPTION, POWER................24-31
MODULE - BLOWER MOTOR -
INSTALLATION, POWER...............24-32
MODULE - BLOWER MOTOR -
OPERATION, POWER..................24-31
MODULE - BLOWER MOTOR -
REMOVAL, POWER...................24-31
MODULE - DESCRIPTION, BODY
CONTROL............................8s-1
MODULE - DESCRIPTION, BODY
CONTROL
...........................8E-3
MODULE - DESCRIPTION, FRONT
CONTROL
...........................8E-7
MODULE - DESCRIPTION, FUEL PUMP
....14-8
MODULE - DESCRIPTION, HEATED SEAT
. . . 8E-8
MODULE - DESCRIPTION, INTEGRATED
POWER
..........................8W-97-2
RSINDEX21
Description Group-Page Description Group-Page Description Group-Page
Page 2568 of 2585
PINS (DISC/DRUM BRAKES) -
INSTALLATION, DISC BRAKE CALIPER
GUIDE..............................5-31
PINS (DISC/DRUM BRAKES) - REMOVAL,
DISC BRAKE CALIPER GUIDE............5-31
PINS (TRW BRAKES) - INSTALLATION,
DISC BRAKE CALIPER GUIDE...........5s-30
PINS (TRW BRAKES) - REMOVAL, DISC
BRAKE CALIPER GUIDE................5s-30
PIPE - 3.3/3.8L - INSTALLATION,
CROSS-OVER........................11-6
PIPE - 3.3/3.8L - REMOVAL, CROSS-
OVER...............................11-6
PIPE - INSTALLATION, AIR INTAKE......24-114
PIPE - REMOVAL, AIR INTAKE.........24-113
PISTON & CONNECTING ROD -
DESCRIPTION...................9-116,9-42
PISTON & CONNECTING ROD -
INSTALLATION........................9-44
PISTON & CONNECTING ROD -
REMOVAL...........................9-43
PISTON AND SEAL - ASSEMBLY,
CALIPER..............5-26,5-29,5s-25,5s-28
PISTON AND SEAL - DISASSEMBLY,
CALIPER..............5-24,5-28,5s-23,5s-27
PISTON RING, FITTING.................9-45
PISTON RING FITTING - STANDARD
PROCEDURE........................9-121
PISTON RINGS - INSTALLATION.........9-121
PISTON RINGS - REMOVAL............9-121
PISTON TO CYLINDER BORE FITTING -
STANDARD PROCEDURE................9-42
PISTONS - STANDARD PROCEDURE,
FITTING............................9-117
PLANETARY GEARTRAIN -
DESCRIPTION...............21-232,21s-132
PLANETARY GEARTRAIN - OPERATION . . 21-232,
21s-132
PLASTIC BODY PANEL REPAIR -
STANDARD PROCEDURE................23-3
PLASTIC GROCERY BAG RETAINER -
INSTALLATION......................23-105
PLASTIC GROCERY BAG RETAINER -
REMOVAL.........................23-104
PLASTIGAGE - STANDARD PROCEDURE,
MEASURING BEARING CLEARANCE
USING..........................9-12,9-84
PLATE - 2.5L TD - INSTALLATION,
CLUTCH DISC AND PRESSURE...........6-12
PLATE - 2.5L TD - REMOVAL, CLUTCH
DISC AND PRESSURE..................6-11
PLATE - DESCRIPTION, BODY CODE....Intro.-1
PLATE - DESCRIPTION, MANUFACTURER . Intro.-11
PLATE - DRUM BRAKE - INSTALLATION,
SUPPORT.......................5-56,5s-58
PLATE - DRUM BRAKE - REMOVAL,
SUPPORT.......................5-56,5s-58
PLATE - INSTALLATION, DOOR SILL
TRIM..............................23-77
PLATE - INSTALLATION, FLEX...........9-131
PLATE - INSTALLATION, LIFTGATE SILL . . . 23-79
PLATE - INSTALLATION, SLIDING DOOR
SILL...............................23-82
PLATE - INSTALLATION, STEERING
COLUMN COVER BACKING.............23-70
PLATE - REMOVAL, DOOR SILL TRIM....23-77
PLATE - REMOVAL, FLEX..............9-131
PLATE - REMOVAL, LIFTGATE SILL.......23-79
PLATE - REMOVAL, SLIDING DOOR SILL . . 23-82
PLATE - REMOVAL, STEERING COLUMN
COVER BACKING.....................23-70
PLATE BATTERY CHARGING -
STANDARD PROCEDURE, SPIRAL........8F-10
PLATE MISALIGNMENT - DIAGNOSIS
AND TESTING, DRIVE...................6-6
PLATES - ADHESIVE ATTACHED -
INSTALLATION, EXTERIOR NAME........23-51
PLATES - ADHESIVE ATTACHED -
REMOVAL, EXTERIOR NAME............23-51
PLATES - TAPE ATTACHED -
INSTALLATION, EXTERIOR NAME
........23-51
PLATES - TAPE ATTACHED - REMOVAL,
EXTERIOR NAME
.....................23-51
PLATINUM PLUGS - DESCRIPTION
........8I-9
PLAY - ADJUSTMENT, DIFFERENTIAL
SIDE GEAR END
.....................21-70
PLAY - STANDARD PROCEDURE,
CRANKSHAFT END
................9-36,9s-6PLAY - STANDARD PROCEDURE,
MEASURING CAMSHAFT END............9-29
PLAY - STANDARD PROCEDURE,
MEASURING CRANKSHAFT END.........9-125
PLAYER - DESCRIPTION, DVD...........8A-8
PLAYER - INSTALLATION, DVD...........8A-8
PLAYER - OPERATION, DVD.............8A-8
PLAYER - REMOVAL, DVD..............8A-8
PLUG CABLE - DESCRIPTION, SPARK.....8I-10
PLUG CABLE RESISTANCE,
SPECIFICATIONS - SPARK...............8I-2
PLUG, SPECIFICATIONS - SPARK.........8I-2
PLUGS - DESCRIPTION, PLATINUM........8I-9
PLUGS - STANDARD PROCEDURE,
ENGINE CORE AND OIL GALLERY....9-10,9-86
POINTS - DESCRIPTION, LUBRICATION.....0-7
POLISHING - DESCRIPTION, FINESSE
SANDING/BUFFING...................23-85
PORT REPAIR - STANDARD
PROCEDURE, INTAKE MANIFOLD
VACUUM...........................9-145
PORT VALVE CORE - DESCRIPTION,
SERVICE...........................24-94
PORT VALVE CORE - INSTALLATION,
SERVICE...........................24-94
PORT VALVE CORE - REMOVAL,
SERVICE...........................24-94
POSITION SENSOR - DESCRIPTION,
CAMSHAFT...........................8I-4
POSITION SENSOR - DESCRIPTION,
CRANKSHAFT.......................14-25
POSITION SENSOR - DESCRIPTION,
THROTTLE..........................14-36
POSITION SENSOR - OPERATION,
CAMSHAFT...........................8I-4
POSITION SENSOR - OPERATION,
CRANKSHAFT.......................14-25
POSITION SENSOR - OPERATION,
THROTTLE..........................14-36
POSITION SENSOR - REMOVAL,
CRANKSHAFT.......................14-25
POTENTIAL - STANDARD PROCEDURE,
TESTING OF VOLTAGE..............8W-01-9
POWER - INSTALLATION, WINDOW
REGULATOR........................23-22
POWER - REMOVAL, WINDOW
REGULATOR........................23-22
POWER ADJUSTER - INSTALLATION,
FRONT SEAT TRACK..................23-95
POWER ADJUSTER - REMOVAL, FRONT
SEAT TRACK........................23-95
POWER BRAKE BOOSTER -
DESCRIPTION...................5-40,5s-43
POWER BRAKE BOOSTER - DIAGNOSIS
AND TESTING...................5-41,5s-44
POWER BRAKE BOOSTER - OPERATION . . . 5-41,
5s-44
POWER DISTRIBUTION SYSTEM -
DESCRIPTION.....................8W-97-1
POWER DISTRIBUTION SYSTEM -
OPERATION.......................8W-97-1
POWER DISTRIBUTION SYSTEMS,
SPECIAL TOOLS...................8W-97-1
POWER DOOR LEARN CYCLE -
STANDARD PROCEDURE..............8N-28
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - DESCRIPTION...............8N-48
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - INSTALLATION..............8N-49
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - OPERATION................8N-48
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - REMOVAL..................8N-48
POWER LIFTGATE CONTROL MODULE -
DESCRIPTION.......................8E-10
POWER LIFTGATE CONTROL MODULE -
INSTALLATION.......................8E-11
POWER LIFTGATE CONTROL MODULE -
OPERATION.........................8E-11
POWER LIFTGATE CONTROL MODULE -
REMOVAL
..........................8E-11
POWER LIFTGATE LEARN CYCLE -
STANDARD PROCEDURE
...............8N-9
POWER LIFTGATE SYSTEM -
DESCRIPTION
........................8N-2
POWER LIFTGATE SYSTEM - DIAGNOSIS
AND TESTING
........................8N-4
POWER LIFTGATE SYSTEM - OPERATION
. . 8N-3POWER LOCKS - DESCRIPTION.....8N-1,8N-38
POWER LOCKS - OPERATION......8N-2,8N-39
POWER MIRRORS - DESCRIPTION......8N-45
POWER MIRRORS - DIAGNOSIS AND
TESTING...........................8N-46
POWER MIRRORS - OPERATION........8N-45
POWER MODULE - BLOWER MOTOR -
DESCRIPTION.......................24-31
POWER MODULE - BLOWER MOTOR -
INSTALLATION.......................24-32
POWER MODULE - BLOWER MOTOR -
OPERATION.........................24-31
POWER MODULE - BLOWER MOTOR -
REMOVAL..........................24-31
POWER MODULE - DESCRIPTION,
INTEGRATED......................8W-97-2
POWER MODULE - INSTALLATION,
INTEGRATED......................8W-97-3
POWER MODULE - OPERATION,
INTEGRATED......................8W-97-2
POWER MODULE - REAR BLOWER
MOTOR - DESCRIPTION...............24-41
POWER MODULE - REAR BLOWER
MOTOR - INSTALLATION...............24-42
POWER MODULE - REAR BLOWER
MOTOR - OPERATION.................24-41
POWER MODULE - REAR BLOWER
MOTOR - REMOVAL..................24-41
POWER MODULE - REMOVAL,
INTEGRATED......................8W-97-2
POWER OUTLET - DESCRIPTION......8W-97-4
POWER OUTLET - DIAGNOSIS &
TESTING.........................8W-97-4
POWER OUTLET - OPERATION........8W-97-4
POWER SEAT SYSTEM - DIAGNOSIS
AND TESTING...................8N-52,8N-9
POWER SEAT SYSTEM - OPERATION....8N-52,
8N-9
POWER SEAT TRACK - DESCRIPTION,
DRIVER.......................8N-15,8N-58
POWER SEAT TRACK - DESCRIPTION,
PASSENGER...................8N-16,8N-59
POWER SEAT TRACK - DIAGNOSIS AND
TESTING......................8N-17,8N-60
POWER SEAT TRACK - DIAGNOSIS AND
TESTING, DRIVER...............8N-15,8N-58
POWER SEAT TRACK - INSTALLATION,
DRIVER.......................8N-16,8N-59
POWER SEAT TRACK - INSTALLATION,
PASSENGER...................8N-18,8N-61
POWER SEAT TRACK - OPERATION,
DRIVER.......................8N-15,8N-58
POWER SEAT TRACK - OPERATION,
PASSENGER...................8N-17,8N-60
POWER SEAT TRACK - REMOVAL,
DRIVER.......................8N-16,8N-59
POWER SEAT TRACK - REMOVAL,
PASSENGER...................8N-18,8N-61
POWER SLIDING DOOR SYSTEM -
DESCRIPTION.......................8N-19
POWER SLIDING DOOR SYSTEM -
DIAGNOSIS AND TESTING.............8N-22
POWER SLIDING DOOR SYSTEM -
OPERATION.........................8N-21
POWER STEERING BELT TENSION -
STANDARD PROCEDURE, CHECKING.......7-8
POWER STEERING FASTENER TORQUE,
SPECIFICATIONS......................19-9
POWER STEERING FLUID LEVEL
CHECKING - STANDARD PROCEDURE....19-44
POWER STEERING GEAR, SPECIAL
TOOLS.............................19-34
POWER STEERING PUMP INITIAL
OPERATION - STANDARD PROCEDURE . . . 19-37
POWER STEERING PUMP, SPECIAL
TOOLS.............................19-43
POWER STEERING, SPECIAL TOOLS......19-9
POWER STEERING SYSTEM -
DESCRIPTION........................19-1
POWER STEERING SYSTEM -
OPERATION
..........................19-1
POWER STEERING SYSTEM FLOW AND
PRESSURE TEST - DIAGNOSIS AND
TESTING
............................19-1
POWER TRANSFER UNIT - DESCRIPTION
. . 21-1
POWER TRANSFER UNIT - OPERATION
....21-3
POWER TRANSFER UNIT FLUID -
DESCRIPTION, AWD
....................0-6
RSINDEX25
Description Group-Page Description Group-Page Description Group-Page
Page 2569 of 2585
POWER TRANSFER UNIT, SPECIAL
TOOLS - SDP........................21-8
POWER WINDOWS - DESCRIPTION......8N-62
POWER WINDOWS - DIAGNOSIS AND
TESTING...........................8N-62
POWER WINDOWS - OPERATION........8N-62
POWERING SEVERAL LOADS -
STANDARD PROCEDURE, TESTING
FOR A SHORT TO GROUND ON FUSES . 8W-01-10
PRECAUTIONS AND WARNINGS,
WARNING - SAFETY...................23-1
PRECAUTIONS, WARNING -
WINDSHIELD SAFETY................23-108
PREFERENCE - STANDARD PROCEDURE,
HORN CHIRP...................8N-42,8N-5
PRELOAD - ADJUSTMENT,
DIFFERENTIAL BEARING..............21-199
PRELOAD MEASUREMENT AND
ADJUSTMENT, ADJUSTMENTS -
DIFFERENTIAL BEARING.............21s-100
PREPARATION - STANDARD
PROCEDURE, ENGINE GASKET
SURFACE........................9-11,9-85
PRESSURE - DIAGNOSIS AND TESTING,
CHECKING ENGINE OIL.................9-52
PRESSURE - DIAGNOSIS AND TESTING,
ENGINE OIL.........................9-136
PRESSURE CAP - DESCRIPTION,
RADIATOR...........................7-26
PRESSURE CAP - OPERATION,
RADIATOR...........................7-27
PRESSURE CAP TESTING - DIAGNOSIS
AND TESTING, COOLING SYSTEM........7-27
PRESSURE FOR HIGH SPEED
OPERATION - STANDARD PROCEDURE,
TIRE..........................22-17,22s-9
PRESSURE LEAKAGE TEST - DIAGNOSIS
AND TESTING, CYLINDER
COMBUSTION.....................9-83,9-9
PRESSURE MONITORING -
DESCRIPTION, TIRE..............22-9,22s-1
PRESSURE MONITORING - OPERATION,
TIRE...........................22-9,22s-1
PRESSURE PLATE - 2.5L TD -
INSTALLATION, CLUTCH DISC...........6-12
PRESSURE PLATE - 2.5L TD - REMOVAL,
CLUTCH DISC........................6-11
PRESSURE REGULATOR -
INSTALLATION, FUEL..................14-7
PRESSURE REGULATOR - OPERATION,
FUEL...............................14-7
PRESSURE REGULATOR - REMOVAL,
FUEL...............................14-7
PRESSURE RELEASE PROCEDURE -
STANDARD PROCEDURE, FUEL
SYSTEM............................14-2
PRESSURE RELIEF VALVE -
DESCRIPTION, HIGH..................24-73
PRESSURE RELIEF VALVE -
INSTALLATION, OIL...................9-141
PRESSURE RELIEF VALVE - OPERATION,
HIGH..............................24-73
PRESSURE RELIEF VALVE - REMOVAL,
OIL
................................9-141
PRESSURE SENSOR - DIAGNOSIS AND
TESTING, TIRE
..................22-10,22s-2
PRESSURE SENSOR RETRAIN -
STANDARD PROCEDURE, TIRE
.....22-10,22s-2
PRESSURE, SPECIFICATIONS - FUEL
SYSTEM
............................14-3
PRESSURE SWITCH - DESCRIPTION, OIL
. 9-141
PRESSURE SWITCH - INSTALLATION,
OIL
...........................9-141,9-54
PRESSURE SWITCH - OPERATION, OIL
. . . 9-141
PRESSURE SWITCH - REMOVAL, OIL
....9-141,
9-54
PRESSURE TEST - DIAGNOSIS AND
TESTING, CYLINDER COMPRESSION
. . . 9-83,9-9
PRESSURE TEST - DIAGNOSIS AND
TESTING, POWER STEERING SYSTEM
FLOW
...............................19-1
PRESSURE TESTS - DIAGNOSIS AND
TESTING, CLUTCH AIR
.........21-122,21s-30
PRESSURE TESTS - DIAGNOSIS AND
TESTING, HYDRAULIC
..........21-120,21s-28
PRESSURE TRANSDUCER -
DESCRIPTION, A/C
...................24-21PRESSURE TRANSDUCER - DIAGNOSIS
AND TESTING, A/C...................24-22
PRESSURE TRANSDUCER -
INSTALLATION, A/C...................24-22
PRESSURE TRANSDUCER - OPERATION,
A/C................................24-21
PRESSURE TRANSDUCER - REMOVAL,
A/C................................24-22
PRESSURES - STANDARD PROCEDURE,
TIRE INFLATION.................22-16,22s-8
PROBLEM CAUSES - DIAGNOSIS AND
TESTING, COMMON..................21-30
PROGRAMING - STANDARD
PROCEDURE, RKE TRANSMITTER.......8N-43
PROGRAMMABLE COMMUNICATIONS
INTERFACE (PCI) BUS, OPERATION......14-21
PROGRAMMING - STANDARD
PROCEDURE, ELECTRONIC VEHICLE
INFORMATION CENTER................8M-7
PROGRAMMING - STANDARD
PROCEDURE, PCM/SKIM................8E-2
PROGRAMMING - STANDARD
PROCEDURE, REMOTE KEYLESS
ENTRY TRANSMITTER.................8N-5
PROGRAMMING - STANDARD
PROCEDURE, TRANSPONDER...........8Q-6
PROPELLER SHAFT - DESCRIPTION.......3-21
PROPELLER SHAFT - INSTALLATION......3-22
PROPELLER SHAFT - OPERATION........3-21
PROPELLER SHAFT - REMOVAL..........3-21
PROPELLER SHAFT - SPECIFICATIONS.....3-22
PROPORTIONING - DESCRIPTION,
ELECTRONIC VARIABLE BRAKE............5-75
PROPORTIONING - OPERATION,
ELECTRONIC VARIABLE BRAKE..........5-77
PROPORTIONING VALVE (HEIGHT
SENSING) - DESCRIPTION.........5-48,5s-51
PROPORTIONING VALVE (HEIGHT
SENSING) - DIAGNOSIS AND TESTING....5-49,
5s-52
PROPORTIONING VALVE (HEIGHT
SENSING) - INSTALLATION.........5-51,5s-53
PROPORTIONING VALVE (HEIGHT
SENSING) - OPERATION...........5-48,5s-51
PROPORTIONING VALVE (HEIGHT
SENSING) - REMOVAL............5-50,5s-53
PTU FLUID CHANGE - STANDARD
PROCEDURE.........................21-5
PULLEY - DESCRIPTION, GENERATOR
DECOUPLER....................8F-25,8F-27
PULLEY - DIAGNOSIS AND TESTING,
GENERATOR DECOUPLER.........8F-25,8F-27
PULLEY - INSTALLATION, GENERATOR
DECOUPLER....................8F-26,8F-28
PULLEY - INSTALLATION, TIMING BELT
TENSIONER..........................9-69
PULLEY - OPERATION, GENERATOR
DECOUPLER....................8F-25,8F-27
PULLEY - REMOVAL, GENERATOR
DECOUPLER....................8F-26,8F-28
PULLEY - REMOVAL, TIMING BELT
TENSIONER..........................9-68
PUMP - 2.4L - CLEANING, WATER........7-32
PUMP - 2.4L - DESCRIPTION, WATER.....7-31
PUMP - 2.4L - INSPECTION, WATER......7-32
PUMP - 2.4L - INSTALLATION, WATER.....7-32
PUMP - 2.4L - REMOVAL, WATER........7-31
PUMP - 3.3/3.8L - CLEANING, WATER.....7-34
PUMP - 3.3/3.8L - DESCRIPTION,
WATER .............................7-33
PUMP - 3.3/3.8L - INSPECTION, WATER . . . 7-34
PUMP - 3.3/3.8L - INSTALLATION,
WATER .............................7-34
PUMP - 3.3/3.8L - REMOVAL, WATER.....7-33
PUMP - ASSEMBLY, OIL...........9-143,9-56
PUMP - ASSEMBLY, OIL.......21-232,21s-132
PUMP - CLEANING, OIL...........9-142,9-56
PUMP - DESCRIPTION, FUEL............14-8
PUMP - DESCRIPTION, FUEL DOSING . . . 24-115
PUMP - DESCRIPTION, OIL.............9-142
PUMP - DESCRIPTION, OIL.....21-230,21s-131
PUMP - DISASSEMBLY, OIL........9-142,9-55
PUMP - DISASSEMBLY, OIL
....21-230,21s-131
PUMP - INSPECTION, OIL
..........9-142,9-56
PUMP - INSTALLATION, FUEL DOSING
. . . 24-116
PUMP - INSTALLATION, LEAK
DETECTION
.........................25-13
PUMP - INSTALLATION, OIL
........9-144,9-57PUMP - INSTALLATION, SEAL - OIL....21-233,
21s-133
PUMP - OPERATION, FUEL..............14-8
PUMP - OPERATION, FUEL DOSING.....24-115
PUMP - OPERATION, OIL......21-230,21s-131
PUMP - REMOVAL, FUEL DOSING......24-115
PUMP - REMOVAL, LEAK DETECTION....25-13
PUMP - REMOVAL, OIL............9-142,9-55
PUMP - REMOVAL, SEAL - OIL . . 21-232,21s-133
PUMP (2.4L ENGINE) - INSTALLATION....19-42
PUMP (2.4L ENGINE) - REMOVAL.......19-38
PUMP (2.4L/3.3L/3.8L ENGINE) -
DESCRIPTION.......................19-36
PUMP (2.5L DIESEL) - DESCRIPTION.....19-36
PUMP (2.5L DIESEL) - INSTALLATION....19-43
PUMP (2.5L DIESEL) - REMOVAL........19-40
PUMP (3.3L/3.8L ENGINE) -
INSTALLATION.......................19-43
PUMP (3.3L/3.8L ENGINE) - REMOVAL . . . 19-40
PUMP INITIAL OPERATION - STANDARD
PROCEDURE, POWER STEERING........19-37
PUMP INLET TUBE - 2.4L -
DESCRIPTION, WATER.................7-35
PUMP INLET TUBE - 2.4L -
INSTALLATION, WATER.................7-35
PUMP INLET TUBE - 2.4L - REMOVAL,
WATER .............................7-35
PUMP INLET TUBE - 3.3/3.8L -
INSTALLATION, WATER.................7-36
PUMP INLET TUBE - 3.3/3.8L -
REMOVAL, WATER....................7-36
PUMP MODULE - DESCRIPTION, FUEL....14-8
PUMP MODULE - INSTALLATION, FUEL....14-9
PUMP MODULE - OPERATION, FUEL......14-8
PUMP MODULE - REMOVAL, FUEL........14-8
PUMP MOTOR - INSTALLATION, FRONT
WASHER............................8R-8
PUMP MOTOR - INSTALLATION, REAR
WASHER...........................8R-10
PUMP MOTOR - REMOVAL, FRONT
WASHER............................8R-8
PUMP MOTOR - REMOVAL, REAR
WASHER...........................8R-10
PUMP (PULLEY) - ASSEMBLY..........19-41
PUMP (PULLEY) - DISASSEMBLY........19-41
PUMP RELAY - DESCRIPTION, FUEL.....14-28
PUMP RELAY - OPERATION, FUEL.......14-28
PUMP, SPECIAL TOOLS - POWER
STEERING..........................19-43
PUSH-PIN GROMMET REPLACEMENT -
STANDARD PROCEDURE..............8N-28
PUSHRODS - DESCRIPTION.......9-109,9s-26
PUSHRODS - OPERATION.........9-109,9s-26
QUAD BUCKET - INSTALLATION, BUCKET
SEAT BACK.........................23-99
QUAD BUCKET - INSTALLATION, SEAT
BELT BUCKLE - FIRST ROW INBOARD....8O-12
QUAD BUCKET - REMOVAL, BUCKET
SEAT BACK.........................23-98
QUAD BUCKET - REMOVAL, SEAT BELT
BUCKLE - FIRST ROW INBOARD........8O-12
QUAD BUCKET, 50/50 SPLIT, BENCH -
INSTALLATION, SEAT BACK HINGE
COVERS...........................23-101
QUAD BUCKET, 50/50 SPLIT, BENCH -
INSTALLATION, SEAT CUSHION COVER . . 23-100
QUAD BUCKET, 50/50 SPLIT, BENCH -
REMOVAL, SEAT BACK HINGE COVERS . . 23-101
QUAD BUCKET, 50/50 SPLIT, BENCH -
REMOVAL, SEAT CUSHION COVER......23-100
QUAD BUCKET SEAT RISER -
INSTALLATION.......................23-98
QUAD BUCKET SEAT RISER - REMOVAL . . 23-98
QUAD BUCKET SEAT SIDE SHIELD - NO
CUPHOLDER - INSTALLATION...........23-97
QUAD BUCKET SEAT SIDE SHIELD - NO
CUPHOLDER - REMOVAL..............23-97
QUAD BUCKET SEAT SIDE SHIELD/
CUPHOLDER - FLAP AND SPRING
ASSEMBLY - INSTALLATION
...........23-107
QUAD BUCKET SEAT SIDE SHIELD/
CUPHOLDER - FLAP AND SPRING
ASSEMBLY - REMOVAL
...............23-107
QUAD BUCKET SEAT SIDE SHIELD/
CUPHOLDER - INSTALLATION
...........23-96
QUAD BUCKET SEAT SIDE SHIELD/
CUPHOLDER - REMOVAL
..............23-96
QUAD CHILD SEAT - INSTALLATION
......23-89
26 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2572 of 2585
RETRAIN - STANDARD PROCEDURE,
TIRE PRESSURE SENSOR.........22-10,22s-2
RETURN - PCM INPUT - OPERATION,
SENSOR............................8E-15
RETURN HOSE - INSTALLATION, HEATER . 24-87
RETURN HOSE - REMOVAL, HEATER.....24-86
RHD - DESCRIPTION..............5-35,5s-34
RHD - INSTALLATION.....5-39,5-47,5-95,5s-38,
5s-50
RHD - INSTALLATION, MASTER
CYLINDER............................6-9
RHD - INSTALLATION, PEDAL TORQUE
SHAFT.........................5-39,5s-43
RHD - REMOVAL....5-37,5-43,5-91,5s-36,5s-47
RHD - REMOVAL, MASTER CYLINDER......6-8
RHD - REMOVAL, PEDAL TORQUE
SHAFT.........................5-39,5s-42
RHD GEAR - INSTALLATION............19-33
RHD GEAR - REMOVAL................19-31
RIGHT - CLEANING, EXHAUST
MANIFOLD..........................9-151
RIGHT - INSPECTION, EXHAUST
MANIFOLD..........................9-151
RIGHT - INSTALLATION, CYLINDER
HEAD COVER........................9-103
RIGHT - INSTALLATION, EXHAUST
MANIFOLD..........................9-151
RIGHT - REMOVAL, CYLINDER HEAD
COVER.............................9-102
RIGHT - REMOVAL, EXHAUST MANIFOLD . 9-150
RIGHT B-PILLAR SWITCH -
DESCRIPTION.......................8N-32
RIGHT B-PILLAR SWITCH -
INSTALLATION......................8N-32
RIGHT B-PILLAR SWITCH - OPERATION . . 8N-32
RIGHT B-PILLAR SWITCH - REMOVAL....8N-32
RIGHT D-PILLAR TRIM PANEL -
INSTALLATION.......................23-82
RIGHT D-PILLAR TRIM PANEL -
REMOVAL..........................23-81
RIGHT MOUNT - INSTALLATION.....9-135,9-51
RIGHT MOUNT - REMOVAL........9-135,9-51
RIGHT OUTBOARD - INSTALLATION,
SEAT BELT & RETRACTOR - SECOND
ROW ..............................8O-15
RIGHT OUTBOARD - REMOVAL, SEAT
BELT & RETRACTOR - SECOND ROW....8O-15
RIGHT OUTBOARD WITH REAR HVAC -
LWB - INSTALLATION, SEAT BELT &
RETRACTOR - SECOND ROW...........8O-16
RIGHT OUTBOARD WITH REAR HVAC -
LWB - REMOVAL, SEAT BELT &
RETRACTOR - SECOND ROW...........8O-16
RIGHT QUARTER TRIM PANEL -
INSTALLATION.......................23-79
RIGHT QUARTER TRIM PANEL -
REMOVAL..........................23-79
RING, FITTING - PISTON................9-45
RING FITTING - STANDARD
PROCEDURE, PISTON.................9-121
RINGS - INSTALLATION, PISTON........9-121
RINGS - REMOVAL, PISTON............9-121
RISER - 50/50 SPLIT - INSTALLATION,
BENCH SEAT.......................23-100
RISER - 50/50 SPLIT - REMOVAL,
BENCH SEAT
.......................23-100
RISER - INSTALLATION, LUGGAGE RACK
. . 23-56
RISER - INSTALLATION, QUAD BUCKET
SEAT
..............................23-98
RISER - MANUAL TRACK -
INSTALLATION, FRONT SEAT
...........23-95
RISER - MANUAL TRACK - REMOVAL,
FRONT SEAT
........................23-94
RISER - REMOVAL, LUGGAGE RACK
.....23-55
RISER - REMOVAL, QUAD BUCKET SEAT
. . 23-98
RISER - SECOND ROW - INSTALLATION,
BENCH SEAT
.......................23-101
RISER - SECOND ROW - REMOVAL,
BENCH SEAT
.......................23-101
RISER - THIRD ROW - INSTALLATION,
BENCH SEAT
.......................23-101
RISER - THIRD ROW - REMOVAL,
BENCH SEAT
.......................23-101
RISER LATCH LOCKING LINK -
INSTALLATION, SEAT
.................23-106
RISER LATCH LOCKING LINK -
REMOVAL, SEAT
....................23-106RKE TRANSMITTER PROGRAMING -
STANDARD PROCEDURE..............8N-43
ROAD TEST - DIAGNOSIS AND TESTING . . . 8P-3
ROAD TEST - DIAGNOSIS AND TESTING . 21-119,
21s-27
ROCKER ARMS - DESCRIPTION....9-109,9s-26
ROCKER ARMS - INSPECTION...........9-35
ROCKER ARMS - INSTALLATION.........9-35
ROCKER ARMS - OPERATION......9-109,9s-26
ROCKER ARMS - REMOVAL.............9-34
ROCKER ARMS AND SHAFT - ASSEMBLY . 9-109,
9s-27
ROCKER ARMS AND SHAFT -
DISASSEMBLY..................9-109,9s-27
ROCKER ARMS AND SHAFT -
INSTALLATION..................9-110,9s-28
ROCKER ARMS AND SHAFT - REMOVAL . . 9-109,
9s-27
ROD - DESCRIPTION, LIFT GEAR & LINK . 8N-16
ROD - DESCRIPTION, PISTON &
CONNECTING....................9-116,9-42
ROD - INSTALLATION, LIFT GEAR &
LINK..............................8N-16
ROD - INSTALLATION, OUTER TIE.......19-34
ROD - INSTALLATION, PISTON &
CONNECTING.........................9-44
ROD - OPERATION, LIFT GEAR & LINK . . . 8N-16
ROD - REMOVAL, LIFT GEAR & LINK.....8N-16
ROD - REMOVAL, OUTER TIE...........19-34
ROD - REMOVAL, PISTON &
CONNECTING.........................9-43
ROD BEARING CLEARANCE - STANDARD
PROCEDURE, MEASURING
CONNECTING........................9-120
ROD, FITTING - CONNECTING............9-45
RODS - STANDARD PROCEDURE,
FITTING CONNECTING.................9-116
ROOF JOINT MOLDING - INSTALLATION . . 23-58
ROOF JOINT MOLDING - REMOVAL......23-58
ROTATION - STANDARD PROCEDURE,
TIRE AND WHEEL.....................22-7
ROTOR - DIAGNOSIS AND TESTING,
BRAKE.........................5-51,5s-54
ROTOR - INSTALLATION, FRONT BRAKE . . . 5-54,
5s-57
ROTOR - REMOVAL, FRONT BRAKE . . 5-54,5s-57
ROTOR, EXPORT - BRAKE..........5-55,5s-58
ROTOR MACHINING - STANDARD
PROCEDURE, BRAKE..............5-53,5s-56
ROTOR, SPECIFICATIONS - BRAKE . . . 5-55,5s-57
ROW - BENCH - INSTALLATION, SEAT
BELT BUCKLE - FIRST................8O-13
ROW - BENCH - REMOVAL, SEAT BELT
BUCKLE - FIRST.....................8O-13
ROW - INSTALLATION, BENCH SEAT
RISER - SECOND....................23-101
ROW - INSTALLATION, BENCH SEAT
RISER - THIRD.....................23-101
ROW - LEFT OUTBOARD -
INSTALLATION, SEAT BELT &
RETRACTOR - SECOND...............8O-17
ROW - LEFT OUTBOARD - REMOVAL,
SEAT BELT & RETRACTOR - SECOND....8O-17
ROW - OUTBOARD - INSTALLATION,
SEAT BELT & RETRACTOR - FIRST......8O-14
ROW - OUTBOARD - REMOVAL, SEAT
BELT & RETRACTOR - FIRST...........8O-14
ROW - REMOVAL, BENCH SEAT RISER -
SECOND...........................23-101
ROW - REMOVAL, BENCH SEAT RISER -
THIRD............................23-101
ROW - RIGHT OUTBOARD -
INSTALLATION, SEAT BELT &
RETRACTOR - SECOND...............8O-15
ROW - RIGHT OUTBOARD - REMOVAL,
SEAT BELT & RETRACTOR - SECOND
....8O-15
ROW - RIGHT OUTBOARD WITH REAR
HVAC - LWB - INSTALLATION, SEAT
BELT & RETRACTOR - SECOND
.........8O-16
ROW - RIGHT OUTBOARD WITH REAR
HVAC - LWB - REMOVAL, SEAT BELT &
RETRACTOR - SECOND
...............8O-16
ROW - THREE PASSENGER BENCH -
INSTALLATION, SEAT BELT BUCKLE -
SECOND
...........................8O-15
ROW - THREE PASSENGER BENCH -
REMOVAL, SEAT BELT BUCKLE -
SECOND
...........................8O-15ROW INBOARD - 50/50 BENCH -
INSTALLATION, SEAT BELT BUCKLE -
SECOND...........................8O-13
ROW INBOARD - 50/50 BENCH -
REMOVAL, SEAT BELT BUCKLE -
SECOND...........................8O-13
ROW INBOARD - QUAD BUCKET -
INSTALLATION, SEAT BELT BUCKLE -
FIRST.............................8O-12
ROW INBOARD - QUAD BUCKET -
REMOVAL, SEAT BELT BUCKLE - FIRST . . . 8O-12
RUN WEATHERSTRIP - INSTALLATION,
FRONT DOOR GLASS................23-113
RUN WEATHERSTRIP - REMOVAL,
FRONT DOOR GLASS................23-113
RUNOUT - DIAGNOSIS AND TESTING,
CLUTCH COVER AND DISC...............6-6
RUNOUT, SPECIFICATIONS - TONE
WHEEL.............................5-79
SAFETY PRECAUTIONS AND WARNINGS,
WARNING...........................23-1
SAFETY PRECAUTIONS, WARNING -
WINDSHIELD.......................23-108
SANDING/BUFFING & POLISHING -
DESCRIPTION, FINESSE...............23-85
SBEC CONTROLLER - INSTALLATION.....8E-17
SBEC CONTROLLER - OPERATION,
8-VOLT SUPPLY - PCM OUTPUT.........8E-15
SBEC CONTROLLER - REMOVAL.........8E-16
SCHEMATICS AND DIAGRAMS - 41TE
TRANSAXLE HYDRAULIC SCHEMATICS . . 21-169
SCHEMATICS AND DIAGRAMS - 4XTE
TRANSAXLE HYDRAULIC SCHEMATICS . . 21s-75
SCHEMATICS AND DIAGRAMS - SPECIAL
TOOLS............................21s-89
SCHEMATICS, SCHEMATICS AND
DIAGRAMS - 41TE TRANSAXLE
HYDRAULIC........................21-169
SCHEMATICS, SCHEMATICS AND
DIAGRAMS - 4XTE TRANSAXLE
HYDRAULIC........................21s-75
SCREEN - DESCRIPTION, VIDEO........8A-16
SCREEN - INSTALLATION, VIDEO........8A-16
SCREEN - OPERATION, VIDEO..........8A-16
SCREEN - REMOVAL, VIDEO............8A-16
SCUFF PAD - INSTALLATION, REAR
FASCIA..............................13-4
SCUFF PAD - REMOVAL, REAR FASCIA....13-3
SDP POWER TRANSFER UNIT, SPECIAL
TOOLS..............................21-8
SEAL - ASSEMBLY, CALIPER PISTON . 5-26,5-29,
5s-25,5s-28
SEAL - DIAGNOSIS AND TESTING,
RADIATOR CAP TO FILLER NECK.........7-27
SEAL - DISASSEMBLY, CALIPER PISTON . . . 5-24,
5-28,5s-23,5s-27
SEAL - FRONT - INSTALLATION,
CRANKSHAFT OIL................9-127,9-40
SEAL - FRONT - REMOVAL,
CRANKSHAFT OIL................9-127,9-40
SEAL - INSTALLATION, DIFFERENTIAL
CARRIER............................21-9
SEAL - INSTALLATION, END COVER......21-11
SEAL - INSTALLATION, HALF SHAFT
INNER.............................21-12
SEAL - INSTALLATION, INPUT FLANGE....3-45
SEAL - INSTALLATION, INPUT SHAFT.....21-18
SEAL - INSTALLATION, INPUT SHAFT
COVER.............................21-14
SEAL - INSTALLATION, INPUT SHAFT
END ...............................21-16
SEAL - INSTALLATION, OUTER HALF
SHAFT.............................21-19
SEAL - INSTALLATION, OUTPUT FLANGE . . . 3-46
SEAL - OIL PUMP - INSTALLATION.....21-233,
21s-133
SEAL - OIL PUMP - REMOVAL . . 21-232,21s-133
SEAL - REAR - INSTALLATION,
CRANKSHAFT OIL................9-129,9-42
SEAL - REAR - REMOVAL, CRANKSHAFT
OIL ...........................9-128,9-41
SEAL - REMOVAL, DIFFERENTIAL
CARRIER............................21-9
SEAL - REMOVAL, END COVER
..........21-11
SEAL - REMOVAL, HALF SHAFT INNER
. . . 21-12
SEAL - REMOVAL, INPUT FLANGE
........3-44
SEAL - REMOVAL, INPUT SHAFT
........21-17
SEAL - REMOVAL, INPUT SHAFT COVER
. . 21-13
RSINDEX29
Description Group-Page Description Group-Page Description Group-Page