check engine GEELY FC 2008 User Guide

Page 37 of 419

Engine mechanismEngine assemblyInspection1. Check coolant.
2. Check engine oil.
3. Check battery.
4. Check air filter assembly.
5. Check spark plug [4G18-3705113].
6. Check drive belt [4G18-1307107].Hint: do not check belt tension, because automatic tensioner is applied.7. Check ignition timing.(a) Warm up engine.
(b) Connect timing lamp to engine.
(c) Check ignition timing at idle speed.
Ignition timing: before top dead center Note: when checking ignition timing, place
transmission at neutral position.
Hint: After run the engine for 5 seconds with rotating
speed of 1000-1300rpm, check the engine could
recover to idle running.8. Check engine idle speed.(a) Warm up engine and run it at idle speed.
(b) Read engine rotating number in data flow with diagnostic instrument.
(c) Check idle speed.
Idle speed: about 750-850rpm
Notes:When checking idle speed, place cooling fan at OFF position.Turn off all auxiliary devices and air conditioner.Engine mechanism - Engine assemblyK-line 26

Page 38 of 419

9. Check compression pressure.(a) Warm up engine.
(b) Remove ignition coil.
(c) Remove spark plug.
(d) Check cylinder compression pressure.
(1) Install cylinder compression pressure gauge on spark plug hole.
(2) Wide open throttle.
(3) Measure the pressure during crankshaft rotating.
Notes:Ensure to use fully charged battery to make the rotating speed of engine reach or exceed 250rpm.When measuring other items, please repeat steps (1) to (3). Finish the measurement as soon as possible.
Compression pressure: 1080kPa
Min pressure: 1000kPa
Difference among cylinders: 100kPa
(4) If the compression pressure of one or more cylinders is too low, inject a small amount of engine oil
from spark plug hole into the cylinder with low pressure, and repeat steps (1) to (3) to check
pressure.If the pressure increases after engine oil is injected, the piston ring of this cylinder or the
cylinder has been worn or scratched.If the pressure is still too low, the valve may be stuck or not fully closed, or the cylinder head
gasket leaks.10. Check CO/HC.(a) Start engine.
(b) Keep the rotating speed of engine at 2500rpm for about 180 seconds.
(c) When the engine is idle running, insert the test bar of CO/HC gauge into exhaust pipe at least 40cm.
(d) Immediately check idle speed and CO/HC concentration at 2500rpm.
Hints:Finish test within 3 minutes.Perform the test under 2 analog states (idle speed and 2500rpm) according to measuring meth-
ods and sequences specified by Emission Regulations.
(e) If CO/HC concentration is not within specified value, perform trouble shooting according to the
following sequences.
(1) Check the function of oxygen sensor.
(2) See possible failure causes listed in the table below, and repair and correct if necessary.Engine mechanism - Engine assembly27

Page 41 of 419

Engine mechanism - Valve clearanceValve clearanceAdjustment1. Remove engine plastic hood components.
2. Remove ignition coil components [4G18-3705110].
3. Remove cylinder head cover components [4G18-
1003130].
4. Remove engine right bottom shield.
5. Turn crankshaft to cylinder 1 compression top dead
center position.(a) Turn crankshaft pulley to align its groove with “o” mark on
timing chain hood.
(b) Check dot marks on camshaft timing sprocket and VVT
timing sprocket, and they should be in a line on timing chain
hood surface as shown in the diagram.
Hint: if not, turn crankshaft for one circle again
and align the above marks.6. Check valve clearance.(a) Only check the valves shown in the diagram.
(1) Measure the clearance between valve tappet and cam-
shaft with plug gauge.
(2) Record valve clearance measuring value exceeding
specification, and this value will be used to determine
valve tappet thickness that needs change.
Valve clearance (cold vehicle)Intake airExhaust(b) Turn crankshaft for one circle ), and cylinder 4 is
turned to compression top dead center position.
(c) Only check the valves shown in the diagram. Measure valve
clearance (see step (a)).7. Remove drive beltSlowly turn drive belt tensioner clockwise to loosen it.
Then remove drive belt and put back drive belt tensioner slowly
and gently. 30 Mark
Mark
Mark
Timing chain
hood surface
Groove

Page 44 of 419

Engine mechanism - Valve clearance(n) Check intake side camshaft bearing cover forward re-
mark and figure, and tighten the bolts as sequences
shown in the diagram.
Torque: (o) Align alignment mark on the chain with timing mark on
camshaft timing sprocket, and place exhaust camshaft
in cylinder head.
(p) Temporarily lock fixed bolts.
(q) Check exhaust side camshaft bearing cover forward
remark and figure, and tighten the bolts as sequences
shown in the diagram.
Torque: (r) Install camshaft front bearing cover.
Torque: (s) Fix camshaft with adjustable wrench and then tighten
the fixed bolts of camshaft timing sprocket.
Torque: Note: be careful not to damage valve lifter.33Timing remark chain linkTiming markTighteningFixing

Page 45 of 419

Engine mechanism - Valve clearance(t) Check the matching marks on timing chain and cam-
shaft timing sprocket, and then align the groove of crank-
shaft pulley with the timing mark on timing chain hood
as shown in the diagram.
(u) Install chain tensioner.
(1) Check o-ring is clean, and buckle on the hook as
shown in the diagram.
(2) Coat engine oil on the chain tensioner, and then
install it.
Note: when installing the chain temsioner, buckle
on the hook again if plunger has ejected.
(3) Turn crankshaft counterclockwise to separate the
hook from lock pin on the plunger.Mark
Mark
Mark
Timing chain
hood surface
GroovePressing in 34 Lifting
HookPressing
inPinTurning Pin Separation
Hook

Page 46 of 419

Engine mechanism - Valve clearance(4) Turn crankshaft clockwise, and check the sliding
parts are blocked by plunger.
Hint: if the plunger does not eject, press the chain ten-
sion rail toward chain tensioner with screwdriver
or fingers to separate the hook from lock pin and
make the plunger eject.11.Install cylinder head cover components.(a) Install cylinder head cover gasket on cylinder head cover.
(b) Eliminate all old sealant (FIPG) materials.
(c) Coat sealant on 2 positions shown in the diagram.
Notes:Wipe off all the oil stains on junction plane.After coating sealant, finish installation of cylinder head
cover within 3 minutes.After installing, do not refill engine oil within 2 minutes.
(d) Install cylinder head cover components with 9 bolts, 2 seal washers and 2 nuts.
Evenly tighten bolts and nuts at several times.
Torque:
Short bolt: Nut, long bolt etc.: m12. Install drive belt tensioner device.Torque: nut: Bolt: 13. Install fixing bracket absorber on the left of engine.Torque: 14. Check there is oil leakage.Sealant 35 Plunger
TurningPushing

Page 52 of 419

Engine mechanism - Engine assembly64. Install temperature regulator assembly.(a) Check temperature regulator assembly o-ring.
(b) Install temperature regulator assembly as shown in the
diagram.
(c) Install engine water inlet pipe joint components.
Torque: 65. Install oil level gauge tube components.
66. Install ignition coil mounting components.Torque: m67. Install fuel rail injector assembly.(a) Install isolator on cylinder head.
(b) Install fuel rail injector assembly.
Torque: (c) Install fuel pipe retaining clip.68. Install exhaust manifold gasket and exhaust
manifold assembly.Torque: 69. Install exhaust manifold upper heat shield
components.Torque: 70. Install intake manifold assembly.Install new gasket and intake manifold assembly.
Torque: m71. Install throttle supporting plate.Torque: 72. Install flywheel components and clutch assembly.(a) Fix crankshaft with special tool.
(b) Clean bolts and bolt holes.
(c) Coat bolts with adhesive.
Adhesive: thread locking sealant 1234 (Kesaixin 1234).
(d) Install flywheel components.
As sequences shown in the diagram, tighten bolts at
several times.
Torque: 885Nm
(e) Install clutch assembly.Special
tool 41

Page 54 of 419

(k) Insert special tool into location hole on left side of sub
frame and vehicle, and then tighten bolts up to speci-
fied torque.
Torque: bolt A: Bolt B: m
(l) As shown in the diagram, tighten 2 bolts.
Torque: Note: after installing sub frame, check the sub
frame is aligned with location hole on
vehicle.78. Install compressor.Torque: 79. Install lower left control arm assembly.(a) Install drive shaft to steering knucle.
(b) Install lower left control arm.
Torque: Hint: perform the same steps at another side.80. Install front left shaft hub nut.(a) Install fixed nut with socket wrench (39mm).
Torque: (b) Drive the cutout part of hub nut into groove with chisel.
Hint: perform the same steps at another side.81. Install left end front stabilizer link assembly.Fix bolts with hex socket wrench.
Torque: Hint: perform the same steps at another side.82. Install left side transversal lever assembly.(a) Connect transversal lever assembly to steering knucle
and install new nuts.
Torque: Note:Do not coat lubricant on thread and conical surface.After tightening nuts up to specified torque, con-
tinue turning nuts for 60¡ãand insert open pin.
(b) Insert new open pin.83. Connect fuel hose assembly.
84. Install battery tray.Torque: Engine mechanism - Engine assembly 43

Page 55 of 419

Engine mechanism - Engine assembly85. Install alternator mounting components.Torque: 12mm bolt head A: 14mm bolt head B: 86. Install drive belt.
87. Install engine wire harness and all hoses
not connected.(a) Check and connect all joints of engine wire harness.
(b) Check and connect all hoses.88. Install transmission control pull cable assembly
and valve control pull cable.
89. Install air filter assembly and its hose.
90. Install steering middle shaft assembly.(a) Align alignment mark on steering middle shaft.
(b) Install 2 bolts.
Torque: m
(c) Install steering column cover.91. Install front exhaust pipe assembly.
92. Install front chassis bracket.Torque: 93. Install battery and connect wire.
94. Install engine plastic hood components.
95. Install front wheel and engine bottom shield.
96. Refill transmission lubricant.
97. Refill engine oil.
98. Refill coolant.
99. Check there is oil leakage.
100. Check there is coolant leakage.
101. Check idle speed and ignition timing.
102. Check CO/HC.Alignment
mark
Sliding in
Pulling 44

Page 59 of 419

Engine mechanism - Timing chain assembly30. Install crankshaft front oil seal assembly.(a) Coat a little MP grease on oil seal lip.
(b) Gently knock new oil seal in with special tool and ham-
mer until the seal surface is parallel and level with the
edge of timing chain cover.
Note: do not let oil seal mouth contact with foreign
matters.31. Install timing chain hood components.(a) Eliminate all old seal materials from contact surface.
(b) As shown in the diagram, coat sealant on the edge
(diameter 3.5mm-4.5mm).
Sealant: silicon rubber flange sealant 1596 (Kesaixin
1596).
(c) Install timing chain hood with 12 bolts and nuts.
Torque: Notes:Eliminate all grease on contact surface.After coating sealant, finish installation of timing chain
hood within 3 minutes.After installing, do not refill engine oil within 2 minutes.32. Install chain tensioner components.(a) Check o-ring is clean, and buckle on the hook as shown
in the diagram.Special
tool 48 SealantSealant widthChain cover
groove
Cylinder
head groove Sealant
concentrationEntering
Hook
PinLifting

Page:   < prev 1-10 11-20 21-30 31-40 41-50 51-60 ... 70 next >