FUEL INJECTOR AND FUEL TUBE
EM-49
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
5. Install fuel tube and fuel injector assembly to intake manifold.
CAUTION:
Be careful not to let tip of injector nozzle come in contact
with other parts.
Tighten mounting bolts in two steps in numerical order shown
in figure.
6. Connect injector sub-harness.
7. Install intake manifold collector (upper and lower). Refer to EM-
19, "INTAKE MANIFOLD COLLECTOR" .
8. Install fuel sub-tube on rear end of intake manifold collector (lower).
9. Connect fuel feed hose (with damper).
Handling procedure of O-ring is the same as that of fuel damper and fuel sub-tube.
Insert fuel damper straight into fuel sub-tube.
Tighten mounting bolts evenly in turn.
After tightening mounting bolts, make sure that there is no gap between flange and fuel sub-tube.
10. Connect quick connector between fuel feed hose and centralized under-floor piping connection with the
following procedure:
a. Check the connection for damage and foreign materials.
b. Align connector with tube, then insert connector straight into tube until a click is heard.
c. After connecting quick connector, use the following method to
make sure it is full connected.
Visually confirm that the two retainer tabs are connected to
connector.
Pull tube and connector to make sure they are securely con-
nected.
d. Install quick connector cap to quick connector connection.
Install quick connector cap with arrow on surface facing in
direction of quick connector (fuel feed hose side).
CAUTION:
If cap cannot be installed smoothly, quick connector may
have not been installed correctly. Check connection
again.
e. Secure fuel feed hose to clamp.
11. Install in the reverse order of removal after this step.
INSPECTION AFTER INSTALLATION
Check on Fuel Leakage
After installing fuel tubes, make sure there is no fuel leakage at connections in the following steps.
–a) Apply fuel pressure to fuel lines with turning ignition switch “ON” (with engine stopped). Then check for
fuel leaks at connections.
–b) Start engine and rev it up and check for fuel leaks at connections.
NOTE:
Use mirrors for checking on invisible points. 1st step: 10.1 N·m (1.0 kg-m, 7 ft-lb)
2nd step: 23.6 N·m (2.4 kg-m, 17 ft-lb)
KBIA1296E
KBIA1297E
KBIA1298E

Page 2776 of 4449

ROCKER COVER
EM-51
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
ROCKER COVERPFP:13264
Removal and InstallationABS004U9
REMOVAL
1. Remove intake manifold collectors (upper and lower). Refer to EM-19, "INTAKE MANIFOLD COLLEC-
TOR" .
2. Remove ignition coil. Refer to EM-42, "
IGNITION COIL" .
3. Remove PCV hoses from rocker covers.
4. Remove PCV valve and O-ring from rocker cover (right bank), if necessary.
5. Remove oil filler cap from rocker cover (left bank), if necessary.
1. PCV hose 2. Oil filler cap 3. Oil catcher
4. Rocker cover (right bank) 5. PCV control valve 6. O-ring
7. Rocker cover gasket 8. Rocker cover (left bank)
PBIC2303E

Page 2823 of 4449

EM-98
[VQ35DE]
CYLINDER HEAD
Revision: 2004 November 2004 FX35/FX45
CYLINDER HEADPFP:11041
On-Vehicle ServiceABS004X7
CHECKING COMPRESSION PRESSURE
1. Warm up engine thoroughly. Then, stop it.
2. Release fuel pressure. Refer to EC-51, "
FUEL PRESSURE RELEASE" .
3. Disconnect fuel pump fuse to avoid fuel injection during mea-
surement.
4. Remove engine cover with power tool. Refer to EM-19, "
INTAKE MANIFOLD COLLECTOR" .
5. Remove ignition coil and spark plug from each cylinder. Refer to EM-42, "
IGNITION COIL" and EM-43,
"SPARK PLUG (PLATINUM-TIPPED TYPE)" .
6. Connect engine tachometer (not required in use of CONSULT-ll).
7. Install compression gauge with compression gauge adapter
(commercial service tool) onto spark plug hole.
Use compression gauge adapter whose picking up end
inserted to spark plug hole is smaller than 20 mm (0.79 in) in
diameter. Otherwise, it may be caught by cylinder head during
removal.
8. With accelerator pedal fully depressed, turn ignition switch to
“START” for cranking. When gauge pointer stabilizes, read the
compression pressure and engine rpm. Perform these steps to
check each cylinder.
Compression pressure:
Unit: kPa (kg/cm2 , psi) /rpm
CAUTION:
Always use a fully changed battery to obtain specified engine speed.
If engine speed is out of specified range, check battery liquid for proper gravity. Check engine speed
again with normal battery gravity.
SBIA0466E
PBIC0900E
SBIA0533E
Standard Minimum Deference limit between cylinders
1,275 (13.0, 185) / 300 981 (10.0, 142) / 300 98 (1.0, 14) / 300

Page 2838 of 4449

ENGINE ASSEMBLY
EM-113
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
Separation Work
1. Install engine slingers into front of right bank cylinder head and
rear of left bank cylinder head.
2. Remove power steering oil pump from engine side. Refer to PS-
31, "POWER STEERING OIL PUMP" .
3. Remove engine mounting insulator under side nut with power
tool.
4. Lift with hoist and separate engine and transmission assembly
from suspension member.
CAUTION:
Before and during this lifting, always check if any harnesses are left connected.
Avoid damage to and oil/grease smearing or spills onto engine mounting insulator.
5. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
6. Remove starter motor. Refer to SC-10, "
STARTING SYSTEM" .
7. Separate engine from transmission assembly. Refer to AT- 2 6 6 , "
TRANSMISSION ASSEMBLY" .
8. Remove engine mounting insulator and bracket with power tool.
INSTALLATION
Note to the following, and install in the reverse order of removal.
For a location with a positioning pin, insert it securely into hole of
mating part.
For a part with a specified installation orientation, refer to com-
ponent figure in EM-110, "
2WD MODEL" .
When installing engine mounting bracket on cylinder block,
tighten two upper bolts (shown as A in figure) first. Then tighten
two lower bolts (shown as B in figure). (LH and RH sides)
Tighten rear member mounting bolts in numerical order shown
in figure.
INSPECTION AFTER INSTALLATION
Before starting engine, check the levels of engine coolant, engine oil and working fluid. If less than
required quantity, fill to the specified level.
Use procedure below to check for fuel leakage.
–Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of engine coolant, engine oil, working fluid,
fuel and exhaust gas.Slinger bolts:
: 28.0 N·m (2.9 kg-m, 21 ft-lb)
SBIA0474E
PBIC1134E
KBIA1019E

Page 2843 of 4449

EM-118
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2004 November 2004 FX35/FX45
5. Remove front drive shaft LH and RH sides. Refer to FAX-12, "FRONT DRIVE SHAFT" .
6. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
7. Remove starter motor. Refer to SC-10, "
STARTING SYSTEM" .
8. Remove front propeller shaft from front final drive assembly side. Refer to PR-4, "
FRONT PROPELLER
SHAFT" .
9. Separate engine from transmission assembly. Refer to AT- 2 6 6 , "
TRANSMISSION ASSEMBLY" .
10. Remove engine mounting insulator FR and engine mounting bracket with power tool.
11. Remove front final drive assembly from oil pan (upper). Refer to FFD-10, "
FRONT FINAL DRIVE ASSEM-
BLY" .
INSTALLATION
Note to the following, and install in the reverse order of removal.
For a location with a positioning pin, insert it securely into hole of
mating part.
For a part with a specified installation orientation, refer to com-
ponent figure in EM-115, "
AWD MODEL" .
When installing engine mounting bracket on cylinder block,
tighten two upper bolts (shown as A in figure) first. Then tighten
two lower bolts (shown as B in figure). (LH and RH sides)
Install engine mounting bracket (lower) paying attention to the
following.
–a. Temporarily tighten mounting bolts (shown as C, D and E in
figure).
–b. Tighten mounting bolts to the specified torque with following
mounting surfaces touched.
 Engine mounting bracket to engine mounting bracket (lower)
(shown as C and D in figure).
 Front final drive to engine mounting bracket (lower) (shown as E
in figure).
INSPECTION AFTER INSTALLATION
Before starting engine, check the levels of engine coolant, engine oil and working fluid. If less than
required quantity, fill to the specified level.
Use procedure below to check for fuel leakage.
–Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of engine coolant, engine oil, working fluid,
fuel and exhaust gas.
Bleed air from passages in pipes and tubes of applicable lines, such as in cooling system.
After cooling down engine, again check amounts of engine coolant, engine oil and working fluid. Refill to
specified level, if necessary.
Summary of the inspection items:
SBIA0477E
SBIA0478E
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Working fluid Level Leakage Level

Page 2884 of 4449

PRECAUTIONS
EM-159
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
[VK45DE]PRECAUTIONSPFP:00001
Precautions Necessary for Steering Wheel Rotation After Battery DisconnectABS00DAO
NOTE:
This Procedure is applied only to models with Intelligent Key system and NVIS/IVIS (NISSAN/INFINITI
VEHICLE IMMOBILIZER SYSTEM - NATS).
Remove and install all control units after disconnecting both battery cables with the ignition knob in the
″LOCK″ position.
Always use CONSULT-II to perform self-diagnosis as a part of each function inspection after finishing
work. If DTC is detected, perform trouble diagnosis according to self-diagnostic results.
For models equipped with the Intelligent Key system and NVIS/IVIS, an electrically controlled steering lock
mechanism is adopted on the key cylinder.
For this reason, if the battery is disconnected or if the battery is discharged, the steering wheel will lock and
steering wheel rotation will become impossible.
If steering wheel rotation is required when battery power is interrupted, follow the procedure below before
starting the repair operation.
OPERATION PROCEDURE
1. Connect both battery cables.
NOTE:
Supply power using jumper cables if battery is discharged.
2. Use the Intelligent Key or mechanical key to turn the ignition switch to the ″ACC″ position. At this time, the
steering lock will be released.
3. Disconnect both battery cables. The steering lock will remain released and the steering wheel can be
rotated.
4. Perform the necessary repair operation.
5. When the repair work is completed, return the ignition switch to the ″LOCK″ position before connecting
the battery cables. (At this time, the steering lock mechanism will engage.)
6. Perform a self-diagnosis check of all control units using CONSULT-II.
Precautions for Drain Engine CoolantABS006HV
Drain engine coolant when engine is cooled.
Precautions for Disconnecting Fuel PipingABS006HW
Before starting work, make sure no fire or spark producing items are in the work area.
Release fuel pressure before disconnecting and disassembly.
After disconnecting pipes, plug openings to stop fuel leakage.
Precautions for Removal and DisassemblyABS006HX
When instructed to use special service tools, use specified tools. Always be careful to work safely, avoid
forceful or uninstructed operations.
Exercise maximum care to avoid damage to mating or sliding surfaces.
Cover openings of engine system with tape or the equivalent, if necessary, to seal out foreign materials.
Mark and arrange disassembly parts in an organized way for easy troubleshooting and assembly.
When loosening nuts and bolts, as a basic rule, start with the one furthest outside, then the one diagonally
opposite, and so on. If the order of loosening is specified, do exactly as specified. Power tools may be
used where noted in the step.
Precautions for Inspection, Repair and ReplacementABS006HY
Before repairing or replacing, thoroughly inspect parts. Inspect new replacement parts in the same way, and
replace if necessary.
Precautions for Assembly and InstallationABS006HZ
Use torque wrench to tighten bolts or nuts to specification.

Page 2910 of 4449

IGNITION COIL
EM-185
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
IGNITION COILPFP:22448
Removal and InstallationABS006IF
REMOVAL
1. Remove engine cover with power tool. Refer to EM-168, "ENGINE ROOM COVER" .
2. Remove air duct (inlet), air cleaner case and mass air flow sensor assembly, air duct and resonator
assembly. Refer to EM-172, "
AIR CLEANER AND AIR DUCT" .
3. Disconnect harness connector from ignition coil.
4. Remove ignition coil.
CAUTION:
Do not shock it.
INSTALLATION
Install in the reverse order of removal.
1. Ignition coil 2. Spark plug
PBIC1589E

Page 2911 of 4449

EM-186
[VK45DE]
SPARK PLUG (PLATINUM-TIPPED TYPE)
Revision: 2004 November 2004 FX35/FX45
SPARK PLUG (PLATINUM-TIPPED TYPE)PFP:22401
Removal and InstallationABS006IG
REMOVAL
1. Remove engine cover with power tool. Refer to EM-168, "ENGINE ROOM COVER" .
2. Remove ignition coil. Refer to EM-185, "
IGNITION COIL" .
3. Remove spark plug with spark plug wrench (commercial service
tool).
INSPECTION AFTER REMOVAL
Use standard type spark plug for normal condition.
Hot type spark plug is suitable when fouling occurs with standard type spark plug under conditions such as:
Frequent engine starts
Low ambient temperatures
Cold type spark plug is suitable when spark plug knock occurs with standard type spark plug under conditions
such as:
Extended highway driving
Frequent high engine revolution
1. Ignition coil 2. Spark plug
PBIC1589E
SEM294A
MakeNGK
Standard typePLFR5A-11
Hot typePLFR4A-11
Cold typePLFR6A-11
Gap (Nominal) : 1.1 mm (0.043 in)

Page 2917 of 4449

EM-192
[VK45DE]
FUEL INJECTOR AND FUEL TUBE
Revision: 2004 November 2004 FX35/FX45
Insert fuel tube into quick connector until top spool is com-
pletely inside quick connector, and 2nd level spool exposes
right below quick connector.
Hold “A” position as shown in the figure when inserting fuel
tube into quick connector.
CAUTION:
Carefully align center to avoid inclined insertion to pre-
vent damage to O-ring inside quick connector.
Insert until you hear a “click” sound and actually feel the
engagement.
To avoid misidentification of engagement with a similar
sound, be sure to perform the next step.
d. Pull quick connector by hand holding “A” position. Make sure it is completely engaged (connected) so that
it does not come out from fuel tube.
e. Install quick connector cap on quick connector connection. (on
engine side only).
f. Install fuel feed hose to hose clamps.
7. Install in the reverse order of removal after this step.
INSPECTION AFTER INSTALLATION
Check on Fuel Leakage
1. Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
NOTE:
Use mirrors for checking at points out of clear sight.
2. Start engine. With engine speed increased, check again for fuel leakage at connection points.
CAUTION:
Do not touch engine immediately after stopped, as engine becomes extremely hot.
KBIA0272E
SBIA0354E

Page 2918 of 4449

ROCKER COVER
EM-193
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
ROCKER COVERPFP:13264
Removal and InstallationABS006II
REMOVAL
1. Remove engine cover with power tool. Refer to EM-168, "ENGINE ROOM COVER" .
2. Refer to the following for incidental works related to left bank.
a. Remove air duct (inlet), air cleaner case and mass air flow sensor assembly, air duct and resonator
assembly. Refer to EM-172, "
AIR CLEANER AND AIR DUCT" .
b. Move harness on upper rocker cover and its peripheral aside.
c. Remove harness brackets from camshaft bracket (No. 6). Refer to EM-208, "
CAMSHAFT" .
d. Remove electric throttle control actuator. Refer to EM-174, "
INTAKE MANIFOLD" .
e. Remove ignition coil. Refer to EM-185, "
IGNITION COIL" .
f. Remove PCV hose from PCV valve.
3. Refer to the following for incidental works related to right bank.
a. Move harness on upper rocker cover and its peripheral aside.
b. Remove ignition coil EM-185, "
IGNITION COIL" .
c. Remove PCV hose from PCV valve.
1. Rocker cover (left bank) 2. PCV valve 3. O-ring
4. Rocker cover gasket (left bank) 5. Rocker cover (right bank) 6. PCV valve
7. O-ring 8. Oil filler cap 9. Oil catcher
10. Rocker cover gasket (right bank)
PBIC2353E