check engine INFINITI QX56 2004 Factory Service Manual

Page 1900 of 3371

INTAKE MANIFOLD
EM-17
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: August 20072004 QX56
INSTALLATION
Installation is in the reverse order of removal.
Tighten the intake manifold bolts in numerical order as shown.
Install the EVAP canister purge control solenoid valve connector with it facing front of engine.
Tighten the electronic throttle control actuator bolts of the electric throttle control actuator equally and
diagonally in several steps.
After installation perform procedure in EM-18, "INSPECTION AFTER INSTALLATION" .
Install the water hose so that its overlap width for connection is between 27 mm (1.06 in) and 32 mm (1.26
in) (target: 27 mm 1.06 in).
Connecting Quick Connector of Fuel Tube
Install quick connector as follows (the steps are the same for quick connectors on both engine side and vehi-
cle side except for the quick connector cap).
1. Make sure no foreign substances are deposited in and around tube and quick connector, and they are not
damaged.
2. Thinly apply new engine oil around the fuel tube from tip end to the spool end.
3. Align center to insert quick connector straight into fuel tube.
Insert until the paint mark for engagement identification
(white) goes completely inside quick connector so that you
cannot see it from the straight side of the connected part. Use
a mirror to check this where it is not possible to view directly
from the straight side, such as quick connector on vehicle
side.
Insert fuel tube into quick connector until top spool is com-
pletely inside quick connector, and 2nd level spool exposes
right below quick connector on engine side.
CAUTION:
Hold A position in illustration when inserting fuel tube
into quick connector.
Carefully align center to avoid inclined insertion to pre-
vent damage to O-ring inside quick connector.
Insert until you hear a “click” sound and actually feel
the engagement.
To avoid misidentification of engagement with a similar
sound, be sure to perform the next step.
4. Pull quick connector by hand holding A position. Make sure it is completely engaged (connected) so that it
does not come out from fuel tube.
NOTE:
Recommended pulling force is 50 N (5.1 kg, 11.2 lb).
KBIA2462E
PBIC0017E
KBIA0272E

Page 1901 of 3371

EM-18Revision: August 2007
INTAKE MANIFOLD
2004 QX56
5. Install the quick connector cap on the quick connector joint (on
engine side only).
6. Install the fuel hose and tube to hose clamps.
7. Refill the engine coolant. Refer to MA-13, "
REFILLING ENGINE
COOLANT" .
INSPECTION AFTER INSTALLATION
After installing fuel tubes, make sure there is no fuel leakage at connections in the following steps.
–Apply fuel pressure to fuel lines with turning ignition switch ON (with engine stopped). Then check for
fuel leaks at connections.
–Start the engine and rev it up and check for fuel leaks at connections.
Perform procedures for “Throttle Valve Closed Position Learning” after finishing repairs. Refer to EC-44,
"Throttle Valve Closed Position Learning" .
If electric throttle control actuator is replaced, perform procedures for “Idle Air Volume Learning” after fin-
ishing repairs. Refer to EC-44, "
Idle Air Volume Learning" .
SBIA0354E

Page 1908 of 3371

OIL PAN AND OIL STRAINER
EM-25
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: August 20072004 QX56
b. Tighten the oil pan (lower) bolts in numerical order as shown.
4. Install the oil pan drain plug.
5. Installation of the remaining components is in the reverse order of removal.
Do not fill the engine oil for at least 30 minutes after oil pan is installed.
INSPECTION AFTER INSTALLATION
1. Check engine oil level and add engine oil if necessary. Refer to LU-7, "OIL LEVEL" .
2. Start the engine, and check there is no leak of engine oil.
3. Stop engine and wait for 10 minutes.
4. Check engine oil level again.
PBIC2595E

Page 1914 of 3371

FUEL INJECTOR AND FUEL TUBE
EM-31
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: August 20072004 QX56
Handle O-ring with bare hands. Never wear gloves.
Lubricate O-ring with new engine oil.
Do not clean O-ring with solvent.
Make sure that O-ring and its mating part are free of foreign material.
When installing O-ring, be careful not to scratch it with tool or fingernails. Also be careful not to
twist or stretch O-ring. If O-ring was stretched while it was being attached, do not insert it
quickly into fuel tube.
Insert O-ring straight into fuel tube. Do not angle or twist it.
3. Install the fuel injector to the fuel tube using the following steps.
a. Insert new clip into clip mounting groove on the fuel injector.
Insert clip so that lug “A” of fuel injector matches notch “A” of
the clip.
CAUTION:
Do not reuse clip. Replace it with a new one.
Do not allow the clip to interfere with the O-ring. If
interference occurs, replace the O-ring.
b. Insert the fuel injector into the fuel tube with the clip attached.
Insert it while matching it to the axial center.
Insert fuel injector so that lug “B” of fuel tube matches notch
“B” of the clip.
Make sure that the fuel tube flange is securely fixed in the
flange fixing groove on the clip.
c. Make sure that installation is complete by checking that fuel
injector does not rotate or come off.
Make sure that the protrusions of the fuel injectors are aligned
with the cutouts of the clips after installation.
4. Install the fuel tube and fuel injector assembly to the intake manifold.
CAUTION:
Do not let the tip of the injector nozzle come in contact with other parts.
Tighten fuel tube assembly bolts “a” to “b” in illustration in two
steps.
5. Install the fuel hose assembly.
Insert connectors straight, making sure that the axis is lined up with fuel tube side to prevent O-ring
from being damaged.
Tighten the bolts evenly in several steps.
Make sure that there is no gap between the flange and fuel tube after tightening the bolts.
CAUTION:
Handle O-ring with bare hands. Do not wear gloves.Fuel tube side : Blue
Nozzle side : Brown
KBIA2507E
1st step : 12.8 N·m (1.3 kg-m, 9 ft-lb)
2nd step : 24.5 N·m (2.5 kg-m, 18 ft-lb)
KBIA2474E

Page 1915 of 3371

EM-32Revision: August 2007
FUEL INJECTOR AND FUEL TUBE
2004 QX56
Lubricate O-ring with new engine oil.
Do not clean O-ring with solvent.
Make sure that O-ring and its mating part are free of foreign material.
When installing O-ring, be careful not to scratch it with tool or fingernails. Also be careful not to
twist or stretch O-ring. If O-ring was stretched while it was being attached, do not insert it
quickly into fuel tube.
Insert new O-ring straight into fuel tube. Do not twist it.
6. Installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
After installing the fuel tubes, make sure there are no fuel leaks at the connections using the following steps.
1. Apply fuel pressure to the fuel lines by turning the ignition switch ON (with engine stopped). Then check
for fuel leaks at the connections.
NOTE:
Use mirrors for checking on hidden points.
2. Start the engine and rev it up and check for fuel leaks at connections.
CAUTION:
Do not touch the engine immediately after stopping, as engine becomes extremely hot.

Page 1923 of 3371

EM-40Revision: August 2007
TIMING CHAIN
2004 QX56
2. Install camshaft sprockets.
Install intake and exhaust camshaft sprocket by selectively
using the groove of dowel pin according to the bank (common
part used for both banks).
Lock the hexagonal part of camshaft in the same way as for
removal, and tighten bolts.
3. Install crankshaft sprockets for both banks.
Install each crankshaft sprocket so that its flange side (the
larger diameter side without teeth) faces in the direction as
shown.
NOTE:
The same parts are used but facing directions are different.
4. Install timing chains and associated parts.
Align the mating mark on each sprocket and the timing chain for installation.
CAUTION:
Before installing chain tensioner, it is possible to change the position of mating mark on tim-
ing chain and each sprocket. After the mating marks are aligned, keep them aligned by hold-
ing them by hand.
Install slack guides and tension guides onto correct side by checking with identification mark on sur-
face.
Install chain tensioner with plunger locked in with stopper pin.
CAUTION:
Before and after the installation of chain tensioner, make sure that the mating mark on timing
chain is not out of alignment.
After installing chain tensioner, remove the stopper pin to release tensioner. Make sure ten-
sioner is released.
To avoid chain-link skipping of timing chain, never move crankshaft or camshafts until front
cover is installed.
5. In the same way as for right bank, install the timing chain and associated parts on the left side.
6. Install the oil pump.
7. Install the oil pump drive spacer as follows:
Install so that the front mark on the front edge of oil pump
drive spacer faces the front of the engine.
Insert oil pump drive spacer according to the directions of the
crankshaft key and the two flat surfaces of oil pump inner
rotor.
If the positional relationship does not allow the insertion,
rotate oil pump inner rotor to allow the oil pump drive spacer
to be inserted.
KBIA2480E
KBIA2515E
KBIA2490E

Page 1925 of 3371

EM-42Revision: August 2007
TIMING CHAIN
2004 QX56
d. Install bolts in the numerical order shown.
e. Tighten to the specified torque.
CAUTION:
Be sure to wipe off any excessive liquid gasket leaking onto
surface mating with oil pan.
11. Install chain case cover (right bank) and (left bank) as follows:
a. Apply liquid gasket as shown.
Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-45, "
Recommended Chemical Products and Sealants".
CAUTION:
Both the start and end of application of liquid gasket should
be crossed at an invisible position after attaching the chain
case cover.
b. Install bolts in the numerical order shown.
12. Install the crankshaft pulley.
Install the key of the crankshaft.
Insert the pulley by lightly tapping it.
CAUTION:
Do not tap pulley on the side surface where belt is installed (outer circumference).
13. Tighten the crankshaft pulley bolt.
Lock crankshaft using suitable tool, then tighten the bolt.
Perform the following steps for angular tightening:
a. Apply engine oil onto threaded parts of bolt and seating area.
b. Select one most visible notch of the four on bolt flange. Corre-
sponding to the selected notch, put a mating mark (such as
paint) on crankshaft pulley.
14. Rotate crankshaft pulley in normal direction (clockwise when
viewed from engine front) to check for parts interference.
15. Installation of the remaining components is in the reverse order
of removal.M6 × 50 mm (1.97 in) : No. 1, 20, 25, 26, 27
M6 × 80 mm (3.15 in) : No. 4, 5, 7
M6 × 20 mm (0.79 in) : Except the above
KBIA2478E
KBIA2481E
WBIA0468E
Crankshaft pulley bolt torque
Step 1 : 93.1 N·m (9.5 kg-m, 69 ft-lb)
Step 2 : additional 90° (angle tightening)
KBIA2519E

Page 1935 of 3371

EM-52Revision: August 2007
CAMSHAFT
2004 QX56
Install intake and exhaust side camshaft sprocket by selec-
tively using the groove of dowel pin according to the bank.
(Common part used for both banks.)
b. Lock the hexagonal part of camshaft in the same way as for
removal, and tighten bolts.
c. Check again that the timing mating mark on timing chain and on
each sprocket are aligned.
6. Install chain tensioner with the following procedure:
NOTE:
Left bank is shown.
a. Install chain tensioner.
Compress plunger and hold it with a stopper pin when install-
ing.
Loosen the slack guide side timing chain by rotating camshaft
hexagonal part if mounting space is small.
b. Remove stopper pin and release plunger, and then apply ten-
sion to timing chain.
c. Install chain tensioner cover onto front cover. (RH bank)
Apply liquid gasket as shown.
Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-45, "
Recommended Chemical Products and Seal-
ants" .
7. Check and adjust valve clearances. Refer to EM-52, "
Va l v e
Clearance" .
8. Installation of the remaining components is in the reverse order
of removal.
Va lv e C le a ra n c eEBS00ILO
INSPECTION
NOTE:
Perform inspection as follows after removal, installation or replacement of camshaft or valve-related parts, or if
there are unusual engine conditions due to changes in valve clearance over time (starting, idling, and/or
noise).
1. Warm up engine. Then stop engine.
2. Remove engine cover, battery cover and air duct. Refer to EM-11, "
Removal and Installation" , SC-9,
"REMOVAL" and EM-14, "Removal and Installation" .
3. Remove right bank and left bank rocker covers using power tool. Refer to EM-33, "
Removal and Installa-
tion" .
KBIA2480E
Chain tensioner bolts : 6.9 N·m (0.70 kg-m, 61 in-lb)
Tensioner cover bolts : 9.0 N·m (0.92 kg-m, 80 in-lb)KBIA2479E
KBIA2547E

Page 1938 of 3371

CAMSHAFT
EM-55
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: August 20072004 QX56
3. Measure the center thickness of the removed valve lifters using
suitable tool.
4. Use the equation below to calculate valve lifter thickness for replacement.
Valve lifter thickness calculation:
Thickness of replacement valve lifter = t1+ (C1 - C2)
t1 = Thickness of removed valve lifter
C1 = Measured valve clearance
C2= Standard valve clearance:
Thickness of a new valve lifter can be identified by stamp
marks on the reverse side (inside the cylinder).
Stamp mark N788 indicates 7.88 mm (0.3102 in) in thickness.
Available thickness of valve lifter: 25 sizes with range 7.88 to
8.36 mm (0.3102 to 0.3291 in) in steps of 0.02 mm (0.0008 in)
(when manufactured at factory). Refer to EM-101, "
Available
Valve Lifter" .
5. Install the selected valve lifter.
6. Install camshaft.
7. Manually turn crankshaft pulley a few turns.
8. Make sure valve clearances for cold engine are within specifications by referring to the specified values.
9. After completing the repair, check valve clearances again with the specifications for warmed engine. Make
sure the values are within specifications.
KBIA0057E
Intake : 0.36 mm (0.0142 in)*
Exhaust : 0.37 mm (0.0146 in)*
*: Approximately 80°C (176°F)
KBIA0 119 E
Valve clearance standard:
Hot*
Intake : 0.304 - 0.416 mm (0.012 - 0.016 in)
Exhaust : 0.308 - 0.432 mm (0.012 - 0.017 in)
Cold
Intake : 0.26 - 0.34 mm (0.010 - 0.013 in)
Exhaust : 0.29 - 0.37 mm (0.011 - 0.015 in)
* : Approximately 80°C (176°F)

Page 1942 of 3371

CYLINDER HEAD
EM-59
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: August 20072004 QX56
CYLINDER HEADPFP:11041
On-Vehicle ServiceEBS00ILS
CHECKING COMPRESSION PRESSURE
1. Warm up engine thoroughly. Then stop engine.
2. Release fuel pressure. Refer to EC-46, "
FUEL PRESSURE RELEASE" .
a. Remove fuel pump fuse, and start engine.
Refer to PG-78, "
FUSE AND RELAY BOX" or fuel pump fuse location.
Let fuel pump fuse removed until the end of step 7.
b. After engine stalls, crank it two or three times to release all fuel pressure.
3. Remove ignition coil and spark plug from each cylinder.
Refer to EM-27, "
REMOVAL" .
4. Connect engine tachometer (not required in use of CONSULT-II).
5. Install compression tester with Tool into spark plug hole.
6. With accelerator pedal fully depressed, turn ignition switch to “START” for cranking. When the gauge
pointer stabilizes, read the compression pressure and engine rpm. Perform these steps to check each cyl-
inder.
Unit: kPa (kg/cm2 , psi) /rpm
CAUTION:
Always use a fully charged battery to obtain specified engine speed.
If the engine speed is out of specified range, check battery liquid for proper gravity. Check engine
speed again with normal battery gravity.
If compression pressure is below minimum value, check valve clearances and parts associated with
combustion chamber (valve, valve seat, piston, piston ring, cylinder bore, cylinder head, cylinder head
gasket). After the checking, measure compression pressure again.
If some cylinders have low compression pressure, pour small amount of engine oil into the spark plug
hole of the cylinder to re-check it for compression.
–If the added engine oil improves the compression, the piston rings may be worn out or damaged. Check
the piston rings and replace if necessary.
–If the compression pressure remains at low level despite the addition of engine oil, the valves may be
malfunctioning. Check the valves for damage. Replace the valve or valve seat accordingly.
If two adjacent cylinders have respectively low compression pressure and their compression remains
low even after the addition of engine oil, the gaskets may be leaking, or valve in adjacent cylinders may
be damaged. Inspect and repair as required.
7. After inspection is complete, install removed parts. Installation is in the reverse order of removal.
8. Start engine, and confirm that engine runs smoothly.
9. Perform trouble diagnosis. If DTC appears, erase it. Refer to EC-71, "
TROUBLE DIAGNOSIS" . Tool number : EG15050500 (J-45402)
WBIA0605E
Standard MinimumDeference limit
between cylinders
1,520 (15.5, 220) / 200 1,324 (13.5, 192) / 200 98 (1.0, 14) / 300

Page:   < prev 1-10 ... 291-300 301-310 311-320 321-330 331-340 341-350 351-360 361-370 371-380 ... 450 next >