drain bolt LEXUS LS430 2003 Factory Repair Manual

Page 819 of 4500

Clean both sealing surfaces with a non-residue solvent.
Parts must be reassembled within 10 minutes of application. Otherwise, the packing (FIPG) material must
be removed and reapplied.
ADJUSTMENT
1.BEFORE TRANSMISSION FILL
This transmission requires Toyota Genuine ATF WS transmission fluid.
After servicing the transmission, you must refill the transmission with the correct amount of fluid.
Fig. 1: Identifying Transmission Case Cover Bolts

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
Maintain the vehicle in a horizontal position while adjusting fluid level.
Proceed to step 2 if you replaced the transmission pan, drain plug, valve body and/or torque
converter.
Proceed to step 3 after removing the two bolts, transmission case cover and refill plug if you
replaced the transmission hose, output shaft oil seal and/or radiator.

Page 845 of 4500

3.REMOVE ENGINE UNDER COVER NO.2
4.REMOVE INSTRUMENT PANEL UNDER COVER SUB-ASSY NO.2 (SEE REPLACEMENT
)
5.REMOVE INSTRUMENT PANEL GARNISH SUB-ASSY LH (SEE REPLACEMENT
)
6.REMOVE INSTRUMENT PANEL FINISH PANEL (SEE REPLACEMENT
)
7.REMOVE INSTRUMENT PANEL UNDER COVER SUB-ASSY NO.1 (SEE REPLACEMENT
)
8.REMOVE SWITCH BRACE HOLE COVER (SEE REPLACEMENT
)
9.REMOVE INSTRUMENT PANEL SAFETY PAD SUB-ASSY NO.1 (SEE REPLACEMENT
)
10.REMOVE INSTRUMENT PANEL CUP HOLDER ASSY (SEE REPLACEMENT
)
11.REMOVE CONSOLE UPPER REAR PANEL SUB-ASSY (SEE REPLACEMENT
)
12.REMOVE CONSOLE BOX CARPET (SEE REPLACEMENT
)
13.REMOVE REAR CONSOLE ARMREST ASSY (SEE REPLACEMENT
)
14.REMOVE INSTRUMENT PANEL FINISH PANEL LOWER CENTER (SEE REPLACEMENT
)
15.REMOVE INSTRUMENT CLUSTER FINISH PANEL SUB-ASSY CENTER (SEE
REPLACEMENT
)
16.REMOVE CONSOLE PANEL SUB-ASSY UPPER (SEE REPLACEMENT
)
17.REMOVE CONSOLE BOX (SEE REPLACEMENT
)
18.SEPARATE OXYGEN SENSOR (SEE REPLACEMENT
)
a. Separate the 2 heated oxygen sensors.
19.REMOVE FRONT FLOOR BRACE CENTER (SEE REPLACEMENT
)
20.REMOVE EXHAUST PIPE ASSY (SEE REPLACEMENT
)
21.REMOVE FRONT FLOOR HEAT INSULATOR NO.1 (SEE OVERHAUL
)
22.REMOVE PROPELLER W/CENTER BEARING SHAFT ASSY (SEE OVERHAUL
)
SST 09922-10010
23.DRAIN AUTOMATIC TRANSMISSION FLUID
a. Remove the drain plug, gasket and drain the ATF.
b.Install a new gasket and the drain plug.
Torque: 20 N.m (205 kgf.cm, 15 ft.lbf)
24.REMOVE EXHAUST PIPE NO.1 SUPPORT BRACKET SUB-ASSY
a. Remove the 2 bolts and exhaust pipe No.1 support bracket sub-ass
y.

Page 880 of 4500

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
REPLACEMENT
<00380056004c0051004a00030044000300550044005d0052005500030045004f00440047004800030044005100470003004a00440056004e0048005700030056004600550044005300480055000f000300550048005000520059004800030044004f004f00
030057004b004800030052004f004700030029002c0033002a[ material from the gasket surfaces.
Thoroughly clean all components to remove any loose material.
Clean both sealing surfaces with a non-residue solvent.
Apply FIPG in a continuous line width approximately 1 mm (0.04 in.) along the sealing surface.
Parts must be assembled within 10 minutes of application. Otherwise, the FIPG material must be
removed and reapplied.
1.DISCONNECT BATTERY NEGATIVE TERMINAL
2.DRAIN AUTOMATIC TRANSMISSION FLUID
a. Remove the drain plug, gasket and drain the ATF.
b. Install a new gasket and the drain plug.
Torque: 20 N.m (205 kgf.cm, 15 ft.lbf)
3.REMOVE AUTOMATIC TRANSMISSION OIL PAN SUB-ASSY
a. Remove the 20 bolts, oil pan and
gasket.

Page 894 of 4500

Clean both sealing surfaces with a non-residue solvent.
Apply FIPG in a continuous line width approximately 1 mm (0.04 in.) along the sealing surface.
Parts must be assembled within 10 minutes of application. Otherwise, the FIPG material must be
removed and reapplied.
1.DISCONNECT BATTERY NEGATIVE TERMINAL
2.DRAIN AUTOMATIC TRANSMISSION FLUID
a. Remove the drain plug, gasket and drain the ATF.
b. Install a new gasket and the drain plug.
Torque: 20 N.m (205 kgf.cm, 15 ft.lbf)
3.REMOVE AUTOMATIC TRANSMISSION OIL PAN SUB-ASSY
a. Remove the 20 bolts, oil pan and gasket.
Fig. 73: Removing 20 Bolts, Oil Pan And Gasket

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
b. Remove the 3 magnets from the oil pan.

Page 1005 of 4500

34.CHECK AND ADJUST BRAKE PEDAL HEIGHT (SEE ON-VEHICLE INSPECTION )
35.CHECK PEDAL FREE PLAY (SEE ON
-VEHICLE INSPECTION )
36.CHECK PEDAL RESERVE DISTANCE (SEE ON
-VEHICLE INSPECTION )
37.INSTALL COMBINATION METER ASSY (SEE OVERHAUL
)
38.INSTALL INSTRUMENT CLUSTER FINISH PANEL (SEE REPLACEMENT
)
39.INSTALL INSTRUMENT PANEL UNDER COVER SUB-ASSY NO.2 (SEE REPLACEMENT
)
40.INSTALL INSTRUMENT PANEL AIR BAG ASSY LOWER NO.1 (SEE REPLACEMENT
)
41.INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSY NO.1 (SEE REPLACEMENT
)
42.INSTALL OUTER MIRROR SWITCH ASSY
43.INSTALL COIN BOX ASSY
44.INSTALL INSTRUMENT PANEL UNDER COVER SUB-ASSY NO.1 (SEE REPLACEMENT
)
45.INSTALL INSTRUMENT CLUSTER FINISH PANEL CENTER LOWER
46.INSTALL INSTRUMENT CLUSTER FINISH PANEL END
47.INSTALL TURN SIGNAL SWITCH ASSY (SEE REPLACEMENT
)
48.INSTALL SPIRAL CABLE SUB-ASSY (SEE REPLACEMENT
)
49.INSTALL STEERING COLUMN COVER (SEE OVERHAUL
)
50.INSTALL STEERING WHEEL ASSY (SEE OVERHAUL
)
<00360036003700030013001c001c001800130010001800130013001400160003000b0013001c001c00180014001000130018001300140013000f00030013001c001c00180015001000130018001300140013000f00030013001c001c001800160010001300
18001300150013000f00030013001c001c0018001700100013[5021)
51.INSTALL HORN BUTTON ASSY (SEE OVERHAUL
)
52.INSTALL STEERING WHEEL COVER LOWER NO.2
53.INSTALL SWITCH & VOLUME CASE
54.CONNECT BATTERY NEGATIVE TERMINAL
55.INSPECT SRS WARNING LIGHT (SEE DIAGNOSIS SYSTEM
)
56.PERFORM INITIALIZATION (SEE PRECAUTION
)
OVERHAUL
1.REMOVE ENGINE ROOM SIDE COVER
2.SEPARATE ENGINE ROOM NO.3 R/B
a. Remove the bolt and separate the engine room No.3 R/B.
3.DRAIN BRAKE FLUID
a. Draw out fluid with syringe.
4.REMOVE BRAKE MASTER CYLINDER SUB-ASSY
a. Remove the clamp from the 2 brake tubes.

Page 1024 of 4500

Fig. 57: Inspecting Vacuum Check Valve
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
REPLACEMENT
1.REMOVE ENGINE ROOM SIDE COVER
2.SEPARATE ENGINE ROOM NO.3 R/B
a. Remove the bolt and separate the engine room No.3 R/B.
3.DRAIN BRAKE FLUID
a. Draw out fluid with syringe.
4.REMOVE BRAKE MASTER CYLINDER SUB-ASSY
a. Remove the clamp from the 2 brake tubes.

Page 1079 of 4500

REPLACEMENT
1.REMOVE ENGINE ROOM SIDE COVER
2.SEPARATE ENGINE ROOM NO.3 R/B
a. Remove the bolt and separate the engine room No.3 R/B.
3.REMOVE FRONT WHEEL
4.REMOVE FRONT FENDER LINER
Remove the front fender outside moulding, front fender splash shield and front fender liner LH.
5.DRAIN BRAKE FLUID
a. Draw out fluid with syringe.
6.REMOVE ABS & TRACTION ACTUATOR ASSY WITH BRACKET
a. Using SST, disconnect the 6 brake tubes from the ABS & TRACTION actuator assy with bracket.
SST 09751-36011
Fig. 110: Disconnecting Brake Tubes From ABS & TRACTION ACTUATOR ASSY WITH

Page 1869 of 4500

1.DISCONNECT BATTERY NEGATIVE TERMINAL
2.DRAIN ENGINE COOLANT (See REPLACEMENT
)
3.REMOVE ENGINE UNDER COVER NO.1
4.REMOVE RADIATOR ASSY
5.REMOVE TIMING BELT (See REPLACEMENT
)
6.REMOVE WATER INLET HOUSING
a. Disconnect the water hose and remove the 2 bolts, inlet housing and O-ring.
Fig. 18: Disconnecting Water Hose

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
7.REMOVE TIMING BELT IDLER SUB-ASSY NO.2 (See OVERHAUL
)
8.REMOVE WATER PUMP ASSY
a. Remove the 5 bolts, water pump and
gasket.

Page 1881 of 4500

13.REMOVE FAN ASSY
a. Disconnect the radiator reservoir hose from the radiator.
b. Remove the 6 bolts and fan.
14.INSTALL FAN ASSY
a. Install the fan with the 6 bolts.
Torque: 5.0 Nm (51 kgfcm, 44 in.lbf)
b. Connect the radiator reservoir hose to the radiator.
15.INSTALL RADIATOR AND FAN ASSEMBLY
a. Install the 2 radiator lower supports to the radiator.
b. Attach the 2 radiator lower supports on the radiator to the body bracket.
c. Install the radiator and fan assembly with the 2 radiator upper supports and 2 nuts.
Torque: 13.5 N m (138 kgf cm, 10 ft lbf)
d. Connect the cooling fan ECU connector.
16.INSTALL AIR CLEANER ASSY
17.INSTALL AIR CLEANER INLET NO.1
18.REFILL ENGINE COOLANT (See REPLACEMENT
)
19.CHECK FOR ENGINE COOLANT LEAKS
20.INSTALL ENGINE UNDER COVER NO.1
21.CONNECT BATTERY NEGATIVE TERMINAL
OVERHAUL
1.REMOVE PACKING
2.REMOVE RADIATOR CAP SUB-ASSY
3.REMOVE DRAIN PLUG
a. Remove the drain plug.
b. Remove the O-ring.
4.ASSEMBLE SST
SST 09230-01010
a. Install the claw to the overhaul handle, inserting it in the hole in part A as shown in the illustration
b. While gripping the handle, adjust the stopper bolt so that dimension B is as shown in the
illustration.

Page 1898 of 4500

HINT:
The installation procedures are the removal procedures in reverse order. However, only installation procedures
requiring additional information are included.
1.DRAIN ENGINE COOLANT FROM RADIATOR (See REPLACEMENT
)
2.REMOVE AIR CLEANER INLET NO.1
3.REMOVE AIR CLEANER ASSY (See REPLACEMENT
)
4.DISCONNECT RADIATOR HOSE NO.1
5.REMOVE FAN ASSY
a. Disconnect the connector.
b. Remove the 6 bolts and fan.
6.REMOVE COOLING FAN ECU
a. Disconnect the 2 connectors.
b. Remove the 2 screws and ECU.
7.REMOVE FAN
a. Remove the 2 nuts and 2 fans.
8.REMOVE COOLING FAN MOTOR
a. Disconnect the 2 wires from the fan shroud.
b. Remove the 6 screws and 2 cooling fan motors.

Page:   1-10 11-20 next >