RENAULT TWINGO 2009 2.G Electrical Equipment - Petrol Injection Workshop Manual

Page 211 of 348

17B-211V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET094UPSTREAM SENSOR FAULT FINDING
STATUS
DEFINITIONIN PROGRESS: This status indicates that the computer fault finding program is being
run on the upstream sensor.
INACTIVE: This status indicates that the computer fault finding program is not running
on the upstream sensor.
COMPLETED: This status indicates that the computer program has completed fault
finding on the upstream sensor.
NOTESSpecial notes:
Only perform these tests if the parameters do not correspond with the system operation
programming.
There must be no present or stored faults.
Conformity check with engine stopped and ignition on, or engine running, and engine coolant
temperature > 80˚C
IN PROGRESS
or
"INACTIVE"
or
COMPLETEDThis status varies when the ignition is on or the engine is running, depending on the
fault finding program run on the upstream sensor by the computer.
In the event of a fault, apply the interpretation of DF092 Upstream oxygen sensor
circuit.
SIM32_V44_ET094/SIM32_V4C_ET094/SIM32_V50_ET094/SIM32_V54_ET094
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 212 of 348

17B-212V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET095COMBUSTION MISFIRE FAULT FINDING
STATUS
DEFINITIONIN PROGRESS: This status indicates that combustion misfire fault finding is in progress
via a computer program.
INACTIVE: This status indicates that the computer program is not running misfiring fault
finding.
COMPLETED: This status indicates that the computer program has completed
combustion misfire fault finding.
NOTESSpecial notes:
Only perform these tests if the parameters do not correspond with the system operation
programming.
There must be no present or stored faults.
Conformity check with engine stopped and ignition on, or engine running, and engine coolant
temperature > 80˚C
IN PROGRESS
or
"INACTIVE"
or
COMPLETEDThis status varies when the ignition is on or the engine is running, depending on the
combustion misfire fault finding program run by the computer.
SIM32_V44_ET095/SIM32_V4C_ET095/SIM32_V50_ET095/SIM32_V54_ET095
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 213 of 348

17B-213V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET111SET NUMBER OF PASSENGER COMPARTMENT HEATING RESISTORS
STATUS
DEFINITIONYES: This status indicates that the number of activated passenger compartment
heating resistors is set by the injection computer.
NO: This status indicates that the number of passenger compartment heating
resistors can be freely controlled by the UCH.
NOTESSpecial notes:
Only perform these tests if the parameters do not correspond with the system operation
programming.
Conformity check with engine stopped and ignition on, or engine running, and engine coolant
temperature > 80˚C
"YES"Depending on the requirements of the injection system (e.g. torque reduction, power
requirements), the injection computer sets the number of activated passenger
compartment heating resistors (no more or no fewer than required)
Status ET111 becomes YES when the number of activated passenger compartment
heating resistors is set by the injection computer.
"NO"Depending on the requirements of the injection system (e.g. torque reduction, power
requirements), the injection computer sets the number of activated passenger
compartment heating resistors (no more or no fewer than required)
Status ET111 becomes NO if the number of passenger compartment heating
resistors engaged can be freely controlled by the UCH.
SIM32_V44_ET111/SIM32_V4C_ET111/SIM32_V50_ET111/SIM32_V54_ET111
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 214 of 348

17B-214V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET112PASSENGER COMPARTMENT HEATING RESISTORS CUT OFF
STATUS
DEFINITIONYES: This status indicates that the passenger compartment heating resistors are
switched off at the request of the injection computer.
NO: This status indicates that the passenger compartment heating resistors can be
freely controlled by the UCH.
NOTESSpecial notes:
Only perform these tests if the parameters do not correspond with the system operation
programming.
Conformity check with engine stopped and ignition on, or engine running, and engine coolant
temperature > 80˚C
"YES"Depending on the requirements of the injection system (e.g. torque reduction, power
requirements), the injection computer cuts off the passenger compartment heating
resistors.
Status ET112 becomes YES if the number of passenger compartment heating
resistors are cut-off by request of the injection computer.
"NO"Depending on the requirements of the injection system (e.g. torque reduction, power
requirements), the injection computer cuts off the passenger compartment heating
resistors.
Status ET112 becomes NO when the passenger compartment heating resistors
can be freely controlled by the UCH.
SIM32_V44_ET112/SIM32_V4C_ET112/SIM32_V50_ET112/SIM32_V54_ET112
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 215 of 348

17B-215V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET143LOW-SPEED FAN ASSEMBLY RELAY CONTROL
STATUS
DEFINITIONThis status indicates that the low-speed fan assembly relay is being actuated (ACTIVE)
or not (INACTIVE).
NOTESSpecial notes:
–Perform these checks if the parameters correspond with the system operation
programming.
–If the vehicle is equipped with air conditioning, the engine cooling fan will run at 1
st
speed as soon as the air conditioning compressor is activated.
There should be no fault detected on the coolant temperature sensor circuit when this
fault finding procedure is being carried out.
Conformity check with engine stopped and ignition on.
INACTIVEEngine cold and air conditioning switched off
In the event of a fault, consult the interpretation of fault DF559 Low-speed fan
assembly control.
Conformity check with the engine running and engine coolant temperature > 80˚C
ACTIVE
INACTIVEINACTIVE or ACTIVE, according to the engine temperature and the air conditioning
switched off
If there is a fault, refer to the interpretation of fault DF559.
SIM32_V44_ET143/SIM32_V4C_ET143/SIM32_V50_ET143/SIM32_V54_ET143
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 216 of 348

17B-216V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET143
CONTINUED
Sensor electrical conformity
Check:
–the condition of the low-speed fan unit,
–that the low-speed fan resistance is correct,
–the cleanliness of the low-speed fan earth,
–the low-speed fan feed,
–the feed line between the low-speed fan and the low-speed fan relay.
Check the connection and condition of the connector of the low-speed fan assembly relay (component code 700)
and of the engine management computer (component code 120).
If the connector or connectors are faulty and if there is a repair procedure (see Technical Note 6015A, Electrical
wiring repair, Wiring: Precautions for repair), repair the connector, otherwise change the wiring.
Disconnect the low-speed fan relay. Check, with the ignition on, for 12 V on the connection 3FB of the relay.
If the connection is faulty and if there is a repair procedure (see Technical Note 6015A, Electrical wiring repair,
Wiring: Precautions for repair), repair the wiring, otherwise replace it.
Check the continuity of the relay coil.
Replace the low-speed fan relay if necessary.
Use the universal bornier to check the insulation and continuity of the following connection:
●3JN between components 120 and 700.
If the connection is faulty and if there is a repair procedure (see Technical Note 6015A, Electrical wiring repair,
Wiring: Precautions for repair), repair the wiring, otherwise replace it.
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 217 of 348

17B-217V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET144HIGH-SPEED FAN ASSEMBLY RELAY CONTROL
STATUS
DEFINITIONThis status indicates that the high-speed fan assembly relay is being actuated (ACTIVE)
or not (INACTIVE).
NOTESSpecial notes:
Perform these checks if the parameters correspond with the system operation
programming.
There should be no fault detected on the coolant temperature sensor circuit when this
fault finding procedure is being carried out.
Conformity check with engine stopped and ignition on.
INACTIVEEngine cold and air conditioning switched off
In the event of a fault, consult the interpretation of fault DF561 High-speed fan
assembly relay control.
Conformity check with the engine running and engine coolant temperature > 80˚C
ACTIVE
INACTIVEINACTIVE or ACTIVE, according to the engine temperature and the air conditioning
switched off.
If there is a fault, refer to the interpretation of fault DF561.
SIM32_V44_ET144/SIM32_V4C_ET144/SIM32_V50_ET144/SIM32_V54_ET144
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 218 of 348

17B-218V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET144
CONTINUED
Check:
–the condition of the high-speed fan unit,
–that the high-speed fan resistance is correct,
–the cleanliness of the high-speed fan earth,
–the high-speed fan feed,
–the feed line between the high-speed fan and the high-speed fan relay.
Check the connection and condition of the high-speed fan assembly relay connector (component code 234) and
the engine management computer connector (component code 120).
If the connector or connectors are faulty and if there is a repair procedure (see Technical Note 6015A, Electrical
wiring repair, Wiring: Precautions for repair), repair the connector, otherwise change the wiring.
Disconnect the high-speed fan relay. Check, with the ignition on, for 12 V on the connection 3FB of the relay.
If the connection is faulty and if there is a repair procedure (see Technical Note 6015A, Electrical wiring repair,
Wiring: Precautions for repair), repair the wiring, otherwise replace it.
Check the continuity of the relay coil.
Replace the high-speed fan relay if necessary.
Use the universal bornier to check the insulation and continuity of the following connection:
3JP between components 120 and 234.
If the connection is faulty and if there is a repair procedure (see Technical Note 6015A, Electrical wiring repair,
Wiring: Precautions for repair), repair the wiring, otherwise replace it.
Repair if necessary.
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 219 of 348

17B-219V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET223CLUTCH PEDAL
STATUS
DEFINITIONDEPRESSED: This status indicates that the clutch pedal is depressed.
INACTIVE: This status indicates that the clutch pedal is released.
NOTESSpecial notes:
Only perform these tests if the parameters do not correspond with the system operation
programming.
Conformity check with engine stopped and ignition on, or engine running, and engine coolant
temperature > 80˚C
DEPRESSEDClutch pedal depressed.
Non-conformity of the brake signals and/or the clutch switch signals can cause the
engine to race during gear changes.
In the event of a fault, apply the interpretation of DF150 Clutch switch circuit.
RELEASEDClutch pedal released.
Non-conformity of the brake signals and/or the clutch switch signals can cause the
engine to race during gear changes.
In the event of a fault, apply the interpretation of DF150 Clutch switch circuit.
SIM32_V44_ET223/SIM32_V4C_ET223/SIM32_V50_ET223/SIM32_V54_ET223
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page 220 of 348

17B-220V7 MR-413-X44-17B000$152.mif
PETROL INJECTION
Fault finding – Interpretation of statuses17B
SIM 32 Injection
Program no.: D3
Vdiag No.: 44, 4C, 50
and 54
ET289INSTRUMENT PANEL INJECTION CONNECTION
STATUS
DEFINITIONCONNECTED: This status indicates that the connection between the injection
computer and the instrument panel is not defective.
DISCONNECTED: This status indicates that the connection between the injection
computer and the instrument panel is defective.
NOTESSpecial notes:
Only perform these tests if the parameters do not correspond with the system operation
programming.
Conformity check with engine stopped and ignition on, or engine running, and engine coolant
temperature > 80˚C
NOT CONNECTEDThe connection between the injection computer and the instrument panel is defective,
test the instrument panel (see 83A, Instrument panel) and the multiplex network
(see 88B, Multiplexing).
SIM32_V44_ET289/SIM32_V4C_ET289/SIM32_V50_ET289/SIM32_V54_ET289
AFTER REPAIRCarry out a road test followed by a check with the diagnostic tool.

Page:   < prev 1-10 ... 171-180 181-190 191-200 201-210 211-220 221-230 231-240 241-250 251-260 ... 350 next >