engine oil CHRYSLER CARAVAN 2002 Workshop Manual

CHRYSLER CARAVAN 2002 Workshop Manual CARAVAN 2002 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56864/w960_56864-0.png CHRYSLER CARAVAN 2002 Workshop Manual

Page 400 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual INSTALLATION
INSTALLATION - 2.4L
(1) Install the generator.
(2) Install the accessory drive belt, refer to the
Cooling System section for proper procedures.
(3) Connect B+ terminal to generator.
(4) I

Page 407 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual Remove the starter relay from the PDC as
described in this group to perform the following tests:
(1) A relay in the de-energized position should
have continuity between terminals 87A and 30, and
no co

Page 409 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (3) To disable the ignition and fuel systems, dis-
connect the Automatic Shutdown Relay (ASD). The
ASD relay is located in the Power Distribution Cen-
ter (PDC). Refer to the PDC cover for proper rela

Page 418 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual BATTERY CLASSIFICATIONS & RATINGS
Part NumberBCI Group Size
ClassificationCold Cranking
AmperageReserve
CapacityAmpere -
HoursLoad Test
Amperage
4686158AB 34 500 110 Minutes 60 250
4727159AB 34 600 12

Page 432 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual ULES/POWERTRAIN CONTROL MODULE -
DESCRIPTION) section for more DTC information.
The Check Gauges Lamp (if equipped) or Battery
Lamp monitors:charging system voltage,engine
coolant temperature and engi

Page 434 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual BATTERY TEMPERATURE
SENSOR
DESCRIPTION
The PCM incorporates a Battery Temperature Sen-
sor (BTS) on its circuit board.
OPERATION
The PCM uses the temperature of the battery area
to control the charge

Page 439 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (5) Connect the push-in field wire connector to
back of generator.
(6) Install the EVAP Purge solenoid to its bracket.
(7) Install the Air Box, refer to the Engine/Air
Cleaner for more information.
(8

Page 446 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual Remove the starter relay from the PDC as
described in this group to perform the following tests:
(1) A relay in the de-energized position should
have continuity between terminals 87A and 30, and
no co

Page 448 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual (3) To disable the ignition and fuel systems, dis-
connect the Automatic Shutdown Relay (ASD). The
ASD relay is located in the Power Distribution Cen-
ter (PDC). Refer to the PDC cover for proper rela

Page 476 of 2399

CHRYSLER CARAVAN 2002 Workshop Manual IGNITION CONTROL
TABLE OF CONTENTS
page page
IGNITION CONTROL
DESCRIPTION - IGNITION SYSTEM..........1
OPERATION - IGNITION SYSTEM...........1
SPECIFICATIONS
TORQUE.............................2
SPARK