Exhaust Citroen C4 2005 2.G Owner's Guide
[x] Cancel search | Manufacturer: CITROEN, Model Year: 2005, Model line: C4, Model: Citroen C4 2005 2.GPages: 462, PDF Size: 10.48 MB
Page 235 of 462

Downloaded from www.Manualslib.com manuals search engine 229
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Checking and setting the timing (continued).
Refitting.
Turn the tensioner roller (9), using tool [5a]to go past the notch «b».
Position the tool [5b]to lock the index «a»and remove the tool [5a].
Reposition the timing belt (8)on the crankshaft pinion (3).
Hold the timing belt (8)in place, using tool [3].
Put the timing belt (8)in place, in the following sequence:
- Guide roller (12).
- Inlet camshaft pulley (7).
- Exhaust camshaft pulley (6).
- Coolant pump (11).
- Tensioner roller (9).
NOTE:Make sure that the timing belt (8)is as flush as possible with the outer faces of the various
pinions and rollers.
Remove tools [3], [1]and [5b].
Refit the lower timing cover (5), the pulley (3)and the screw (4)of the crankshaft pulley.
Tighten the screw (4)to 4 ± 0,4 m.daN.
Angular tighten 80° ± 5°, using tool [4].
B1EP1GXD
B1EP1GAC
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 229
Page 240 of 462

Downloaded from www.Manualslib.com manuals search engine 234
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1EP18GC
Setting the timing.
Remove the upper timing cover (1).
Rotate the engine by means of the crankshaft screw (2).
NOTE:The pegging hole is located under the crankshaft bearing cap cover.
Peg the engine flywheel, using tool [3].
Remove the lower timing cover (3).
Uncouple the exhaust line from the manifold.
IMPERATIVE: Uncouple the exhaust line in order to avoid damaging the front flexible pipe. Twisting,
pulling and bending the front flexible pipe reduces its life.
Remove:
- The engine speed sensor (6).
- The belt retaining stop (5).
- The screw (2).
- The crankshaft pinion (4)
(with its magnetic track «a»).
IMPERATIVE: The magnetic track should show no signs of damage and should not be approached
by any other source of magnetism. Should this not be adhered to, it is essential to replace the
crankshaft pinion.
Refit the screw (2).
B1BP2LXC
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 234
Page 245 of 462

Downloaded from www.Manualslib.com manuals search engine 239
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1EP18LCB1BP2LZC
Setting the timing (continued).
Refit:
- The intermediate RH engine support, tighten the screws (16)to 5,5 ± 0,5 m.daN.
- The RH engine support, tighten the screws (17)to 4,5 ± 0,4 m.daN.
- The bottom timing cover (3).
Immobilise the engine flywheel, using tool [3].
Remove the screw (2).
Refit the accessories drive pulley and tighten to:
- Pre-tighten to : 3 ± 0,3 m.daN.
- Angular tighten to: 180° ± 1,8°.
Remove tool [3].
Refit:
- The top cover (1).
- The accessories belt
(see corresponding operation).
- The exhaust line
(see corresponding operation).
- The front RH splash-shield.
- The front RH wheel.
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 239
Page 246 of 462
![Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3 Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3](/img/9/4138/w960_4138-245.png)
Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the catalytic converter flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 240
Page 249 of 462
![Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg:](/img/9/4138/w960_4138-248.png)
Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 243
Page 255 of 462
![Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting pe Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting pe](/img/9/4138/w960_4138-254.png)
Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports (4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 249
Page 258 of 462
![Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The uppe Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The uppe](/img/9/4138/w960_4138-257.png)
Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
Screw (10)Pre-tighten to : 3 ± 0,3 m.daN.
Angular tighten : 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
- Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 252
Page 259 of 462
![Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 253
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1]Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 253
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1]Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg](/img/9/4138/w960_4138-258.png)
Downloaded from www.Manualslib.com manuals search engine 253
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1]Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports(4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 253
Page 264 of 462
![Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit: Citroen C4 2005 2.G Owners Guide Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:](/img/9/4138/w960_4138-263.png)
Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
- Screw (10)Pre-tighten to: 3 ± 0,3 m.daN.
Angular tighten: 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 258
Page 288 of 462

Downloaded from www.Manualslib.com manuals search engine 282
ENGINEVALVE CLEARANCE SETTINGS
The valve clearances must be checked with the engine cold.
●Inlet
TU1JP - TU3JP
(except TU5JP4)
WJY
TU5JP4
DV4/DV6/EW10
All typesExhaust
Hydraulic adjustment 0,15 mm ± 0,08
0,30mm ± 0,08
Rocking
Adjust
1 ●1
3 ●3
4 ●4
2 ●24 ●4
2 ●2
1 ●1
3 ●3
Exhaust
●
Inlet Rocking
Valves
fully
openAdjust
1
3
4
23 ●4
4 ●2
2 ●1
1 ●3
Fully open (exhaust) POSSIBLE PROCEDURES
For engines with 4 cylinders in a line (1-3-4-2 )
Engines without hydraulic
adjustment: the clearance (J)
should be checked opposite
the cam.
B1DP13QC
0,20 mm ± 0,05
0,40 mm ± 0,05
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 282