torque specification DODGE DURANGO 1999 1.G Workshop Manual

DODGE DURANGO 1999 1.G Workshop Manual DURANGO 1999 1.G DODGE DODGE https://www.carmanualsonline.info/img/12/5703/w960_5703-0.png DODGE DURANGO 1999 1.G Workshop Manual

Page 2 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine OIL PUMP..............................69
ENGINE OIL PRESSURE SENDING UNIT......70
CRANKSHAFT OIL SEALÐFRONT............70
CRANKSHAFT OIL SEAL�

Page 22 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine TIMING CHAINÐMEASURING WEAR
NOTE: This procedure must be performed with the
timing chain cover removed.
(1) Remove the timing chain cover. Ref

Page 28 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine nal diameter specification (Main Bearing Fitting
Chart). Select inserts required to obtain the specified
bearing-to-journal clearance.
Install

Page 34 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine (20) Install both breathers. Connect tube to both
crankcase breathers (Fig. 44).
(21) Connect throttle and speed control cables.
(22) Install t

Page 54 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine (13) Remove Special Tool 8515, then attach both
sprockets to camshafts. Remove excess oil from bolts,
then Install sprocket bolts, but do not t

Page 61 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine INSTALLATION
(1) Lubricate camshaft journals with clean engine
oil.
NOTE: Position the right side camshaft so that the
camshaft sprocket dowel

Page 76 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine PISTON AND CONNECTING ROD
CLEANING
CAUTION: DO NOT use a wire wheel or other abra-
sive cleaning devise to clean the pistons or con-
necting ro

Page 78 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine (2) Measure the inside diameter of the cylinder
bore at three levels below top of bore. Start perpen-
dicular (across or at 90 degrees) to the

Page 81 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine DESCRIPTION SPECIFICATION
OIL PUMP
Clearance Over Rotors
(MAX).035 -.095 mm
(0.0014 - 0.0038 in.)
Cover Out - of -Flat
(MAX).025 mm (0.001 in.)

Page 86 of 193

DODGE DURANGO 1999 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 5.2L ENGINE
TABLE OF CONTENTS
page page
DESCRIPTION AND OPERATION
ENGINE................................86
ENGINE LUBRICATION SYSTEM...........
Page:   1-10 11-20 21-30 next >