engine DODGE NEON 2000 Service Manual PDF

DODGE NEON 2000 Service Manual PDF NEON 2000 DODGE DODGE https://www.carmanualsonline.info/img/12/56910/w960_56910-0.png DODGE NEON 2000 Service Manual PDF

Page 207 of 1285

DODGE NEON 2000  Service Manual PDF SHROUD
REMOVAL
(1) Remove cooling fan module. Refer to procedure
in this section.
(2) Remove fan and fan motor as previously
described.
INSTALLATION
(1) Install fan motor and fan as previously
describ

Page 208 of 1285

DODGE NEON 2000  Service Manual PDF (3) Remove engine thermostat and reinstall ther-
mostat housing. A gasket may be needed to seal thehousing to cylinder head because the seal is part of
thermostat.
(4) Install suitable flushing gun to

Page 209 of 1285

DODGE NEON 2000  Service Manual PDF SPECIFICATIONS
COOLING SYSTEM CAPACITY
TORQUE SPECIFICATIONSSPECIAL TOOLS
COOLING
6.2 Liters (6.5 qts.)
CAPACITY, Includes Heater and Coolant Reserve
System
DESCRIPTION N´m Ft.
Lbs.In.
Lbs.
A/C Conde

Page 212 of 1285

DODGE NEON 2000  Service Manual PDF DIAGNOSIS AND TESTING
BATTERY BUILT-IN TEST INDICATOR
USING TEST INDICATOR
The Test Indicator (Fig. 2), (Fig. 3) and (Fig. 4)
measures the specific gravity of the electrolyte. Spe-
cific Gravity (SG)

Page 214 of 1285

DODGE NEON 2000  Service Manual PDF be checked. To determine if a high current draw con-
dition exists first check the vehicle with a test lamp.
(1) Verify that all electrical accessories are OFF.
²Remove key from ignition switch
²Tur

Page 215 of 1285

DODGE NEON 2000  Service Manual PDF Refer to Group 8W, Wiring Diagrams. If OK go to
Step 7.
(7) Install interior lamp fuse. After installing fuse,
the current can reach 250 milliamperes. After time-
out the reading should not exceed 8 m

Page 222 of 1285

DODGE NEON 2000  Service Manual PDF STARTING SYSTEMS
TABLE OF CONTENTS
page page
GENERAL INFORMATION
INTRODUCTION..........................1
SUPPLY CIRCUIT AND CONTROL CIRCUIT.....1
DESCRIPTION AND OPERATION
STARTER MOTOR...............

Page 223 of 1285

DODGE NEON 2000  Service Manual PDF DIAGNOSIS AND TESTING
CONTROL CIRCUIT
The starter control circuit has:
²Starter solenoid
²Starter relay
²Park/Neutral Starting and Back-Up Lamp
Switch with automatic transmissions
²Clutch Interloc

Page 224 of 1285

DODGE NEON 2000  Service Manual PDF STARTER RELAY PIN CALL-OUT
PIN CIRCUIT COLOR DESCRIPTION
1 (86) A041 YL IGNITION SWITCH OUTPUT (START)
2 (85) K090 TN PCM
3 (30) A001 RD FUSED B+
4 (87A) NOT USED
5 (87) T040 BR STARTER SOLENOID
RELAY

Page 225 of 1285

DODGE NEON 2000  Service Manual PDF (a) Connect the negative lead of the voltmeter to
the battery negative post, and positive lead to the
battery negative cable clamp (Fig. 4). Rotate and
hold the ignition switch in the START position.