service DODGE RAM 1500 1998 2.G Workshop Manual

DODGE RAM 1500 1998 2.G Workshop Manual RAM 1500 1998 2.G DODGE DODGE https://www.carmanualsonline.info/img/12/5702/w960_5702-0.png DODGE RAM 1500 1998 2.G Workshop Manual

Page 1444 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual Air Leak Detection Test Method
(1) Remove the PCV valve from the IAFM. Cap or
plug the PCV valve grommet.
(2) Attach an air hose with pressure gauge and
regulator to the dipstick tube.
CAUTION: Do not

Page 1445 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual If the leakage occurs at the crankshaft rear oil seal
area:
(1) Disconnect the battery.
(2) Raise the vehicle.
(3) Remove torque converter or clutch housing
cover and inspect rear of block for evidenc

Page 1454 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual CRANKSHAFT OIL SEAL - FRONT
REMOVAL............................275
INSTALLATION........................275
CRANKSHAFT OIL SEAL - REAR
REMOVAL............................276
INSTALLATION...............

Page 1455 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual ENGINE 5.9L DIESEL
DESCRIPTION
The cylinder block is constructed of cast iron. The
casting is a skirted design which incorporates longi-
tudal ribs for superior strength and noise reduction.
The block

Page 1461 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual EXCESSIVE BLUE SMOKE
POSSIBLE CAUSE CORRECTION
Dirty air cleaner or restricted turbocharger intake duct. Check Filter MinderTat air filter housing. (Refer to 9 -
ENGINE/AIR INTAKE SYSTEM/AIR CLEANER
E

Page 1483 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (7) With the engine in this position, valve lash can
be measured at the remaining rocker arms:INTAKE
3±5±6 / EXHAUST 2±4±6. Use the same method as
above for determining whether adjustment is neces

Page 1484 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (g) Release the spring tension and remove the
compressor. Verify that the collets are seated by
tapping on the valve stem with a plastic hammer.
(12) Using the crankshaft barring tool, rotate the
engi

Page 1491 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual Inspect the cylinder bores for damage or excessive
wear.
Measure the cylinder bores (Fig. 54). If the cylin-
der bores exceed the limit, (Refer to 9 - ENGINE/EN-
GINE BLOCK - STANDARD PROCEDURE).
BORE

Page 1500 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (7) Install the flywheel or converter drive plate.
Tighten the bolts to 137 N´m (101 ft. lbs.) torque.
(8) Install the clutch cover and disc (if equipped)
(Refer to 6 - CLUTCH/CLUTCH DISC - INSTALLA-

Page 1515 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual OIL
STANDARD PROCEDURE
STANDARD PROCEDURE - ENGINE OIL LEVEL
CAUTION: Do not overfill crankcase with engine oil,
oil foaming and oil pressure loss can result.
To ensure proper lubrication of an engine