Oil INFINITI M35 2006 Factory Service Manual
[x] Cancel search | Manufacturer: INFINITI, Model Year: 2006, Model line: M35, Model: INFINITI M35 2006Pages: 5621, PDF Size: 65.56 MB
Page 3172 of 5621
![INFINITI M35 2006 Factory Service Manual CYLINDER HEAD
EM-109
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Valve Guide Clearance
(Valve guide clearance) = (Valve guide inner diameter) – (Valve stem diameter)
If th INFINITI M35 2006 Factory Service Manual CYLINDER HEAD
EM-109
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Valve Guide Clearance
(Valve guide clearance) = (Valve guide inner diameter) – (Valve stem diameter)
If th](/img/42/57023/w960_57023-3171.png)
CYLINDER HEAD
EM-109
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Valve Guide Clearance
(Valve guide clearance) = (Valve guide inner diameter) – (Valve stem diameter)
If the calculated value exceeds the limit, replace valve and/or valve guide. When valve guide must be
replaced, refer to EM-109, "
VALVE GUIDE REPLACEMENT" .
VALVE GUIDE REPLACEMENT
When valve guide is removed, replace with oversized [0.2 mm (0.008 in)] valve guide.
1. To remove valve guide, heat cylinder head to 110 to 130
C (230
to 266
F) by soaking in heated oil.
2. Drive out valve guide with a press [under a 20 kN (2 ton, 2.2 US
ton, 2.0 lmp ton) pressure] or a hammer and the valve guide drift
(commercial service tool).
WAR NING :
Cylinder head contains heat. When working, wear protec-
tive equipment to avoid getting burned.
3. Using the valve guide reamer (commercial service tool), ream
cylinder head valve guide hole.Standard
Intake and Exhaust : 6.000 - 6.018 mm (0.2362 - 0.2369 in)
Valve guide clearance:
Standard
Intake : 0.020 - 0.053 mm (0.0008 - 0.0021 in)
Exhaust : 0.030 - 0.063 mm (0.0012 - 0.0025 in)
Limit
Intake : 0.08 mm (0.003 in)
Exhaust : 0.10 mm (0.004 in)
SEM008A
SEM931C
Valve guide hole diameter (for service parts):
Intake and exhaust
: 10.175 - 10.196 mm (0.4006 - 0.4014 in)
SEM932C
Page 3173 of 5621
![INFINITI M35 2006 Factory Service Manual EM-110
[VQ35DE]
CYLINDER HEAD
Revision: 2006 January2006 M35/M45
4. Heat cylinder head to 110 to 130C (230 to 266F) by soaking in
heated oil.
5. Using the valve guide drift (commercial service tool), INFINITI M35 2006 Factory Service Manual EM-110
[VQ35DE]
CYLINDER HEAD
Revision: 2006 January2006 M35/M45
4. Heat cylinder head to 110 to 130C (230 to 266F) by soaking in
heated oil.
5. Using the valve guide drift (commercial service tool),](/img/42/57023/w960_57023-3172.png)
EM-110
[VQ35DE]
CYLINDER HEAD
Revision: 2006 January2006 M35/M45
4. Heat cylinder head to 110 to 130C (230 to 266F) by soaking in
heated oil.
5. Using the valve guide drift (commercial service tool), press valve
guide from camshaft side to the dimensions as in the figure.
WA R N I N G :
Cylinder head contains heat. When working, wear protec-
tive equipment to avoid getting burned.
6. Using the valve guide reamer (commercial service tool), apply
reamer finish to valve guide.
VALVE SEAT CONTACT
After confirming that the dimensions of valve guides and valves
are within the specifications, perform this procedure.
Apply prussian blue (or white lead) onto contacting surface of
valve seat to check the condition of the valve contact on the sur-
face.
Check if the contact area band is continuous all around the cir-
cumference.
If not, grind to adjust valve fitting and check again. If the contact-
ing surface still has “NG” conditions even after the re-check,
replace valve seat. Refer to EM-110, "
VALVE SEAT REPLACE-
MENT" .
VALVE SEAT REPLACEMENT
When valve seat is removed, replace with oversized [0.5 mm (0.020 in)] valve seat.
1. Bore out old seat until it collapses. Boring should not continue beyond the bottom face of the seat recess
in cylinder head. Set the machine depth stop to ensure this. Refer to EM-156, "
Va l v e S e a t" .
CAUTION:
Prevent to scratch cylinder head by excessive boring.
SEM008A
Projection “L”
Intake and exhaust
: 12.6 - 12.8 mm (0.496 - 0.504 in)
SEM950E
Standard:
Intake and exhaust
: 6.000 - 6.018 mm (0.2362 - 0.2369 in)
SEM932C
SBIA0322E
Page 3174 of 5621
![INFINITI M35 2006 Factory Service Manual CYLINDER HEAD
EM-111
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
2. Ream cylinder head recess diameter for service valve seat.
Be sure to ream in circles concentric to valve INFINITI M35 2006 Factory Service Manual CYLINDER HEAD
EM-111
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
2. Ream cylinder head recess diameter for service valve seat.
Be sure to ream in circles concentric to valve](/img/42/57023/w960_57023-3173.png)
CYLINDER HEAD
EM-111
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
2. Ream cylinder head recess diameter for service valve seat.
Be sure to ream in circles concentric to valve guide center.
This will enable valve to fit correctly.
3. Heat cylinder head to 110 to 130
C (230 to 266F) by soaking in
heated oil.
4. Provide valve seats cooled well with dry ice. Force fit valve seat into cylinder head.
WAR NING :
Cylinder head contains heat. When working, wear protective equipment to avoid getting burned.
CAUTION:
Avoid directly touching cold valve seats.
5. Using the valve seat cutter set (commercial service tool) or valve
seat grinder, finish seat to the specified dimensions. Refer to
EM-156, "
Va l v e S e a t" .
CAUTION:
When using the valve seat cutter, firmly grip cutter handle
with both hands. Then, press on the contacting surface all
around the circumference to cut in a single drive. Improper
pressure on with cutter or cutting many different times may
result in stage valve seat.
6. Using compound, grind to adjust valve fitting.
7. Check again for normal contact. Refer to EM-110, "
VA LV E S E AT C O N TA C T" .
VALVE SPRING SQUARENESS
Set a try square along the side of valve spring and rotate spring.
Measure the maximum clearance between the top of spring and
try square.
If it exceeds the limit, replace valve spring.Oversize [0.5 mm (0.020 in)]
Intake : 38.500 - 38.516 mm (1.5157 - 1.5164 in)
Exhaust : 32.700 - 32.716 mm (1.2874 - 1.2880 in)
SEM795A
SEM008A
SEM934C
Limit : 2.1 mm (0.083 in)
PBIC0080E
Page 3177 of 5621
![INFINITI M35 2006 Factory Service Manual EM-114
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
REMOVAL
Outline
At first, remove the engine and the transmission assembly with front suspension member from vehicle down-
ward. Then INFINITI M35 2006 Factory Service Manual EM-114
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
REMOVAL
Outline
At first, remove the engine and the transmission assembly with front suspension member from vehicle down-
ward. Then](/img/42/57023/w960_57023-3176.png)
EM-114
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
REMOVAL
Outline
At first, remove the engine and the transmission assembly with front suspension member from vehicle down-
ward. Then separate the engine from transmission.
Preparation
1. Release fuel pressure. Refer to EC-98, "FUEL PRESSURE RELEASE" .
2. Drain engine coolant from radiator. Refer to CO-11, "
Changing Engine Coolant" .
CAUTION:
Perform this step when engine is cold.
Do not spill engine coolant on drive belts.
3. Disconnect both battery cables. Refer to SC-4, "
BATTERY" .
4. Remove the following parts:
Engine room cover (RH and LH); Refer toEM-14, "ENGINE ROOM COVER" .
Engine cover; Refer to EM-19, "INTAKE MANIFOLD COLLECTOR" .
Front road wheel and tires (power tool)
Front and rear engine undercover (power tool)
Cowl top cover (RH); Refer to EI-18, "COWL TOP" .
Air duct and air cleaner case assembly; EM-17, "AIR CLEANER AND AIR DUCT" .
5. Discharge refrigerant from A/C circuit. Refer to ATC-151, "
REFRIGERANT LINES" .
6. Remove radiator hoses (upper and lower). Refer to CO-14, "
RADIATOR" .
Engine Room LH
1. Disconnect heater hose from vehicle-side, and fit a plug onto hose end to prevent engine coolant leak.
2. Disconnect wire bonding (between vehicle to left bank cylinder head).
3. Disconnect A/C piping from A/C compressor, and temporarily fasten it on vehicle with a rope. Refer to
AT C - 1 5 1 , "
REFRIGERANT LINES" .
4. Disconnect brake booster vacuum hose.
Engine Room RH
1. Disconnect battery positive cable at vehicle side and temporarily fasten it on engine.
2. Disconnect grounding cable.
3. Disconnect fuel feed hose (with damper) and EVAP hose. Refer to EM-45, "
FUEL INJECTOR AND FUEL
TUBE" .
CAUTION:
Fit plugs onto disconnected hoses to prevent fuel leak.
4. Remove reservoir tank of power steering oil pump and piping from vehicle, and temporarily secure them
on engine. Refer to PS-29, "
POWER STEERING OIL PUMP" .
CAUTION:
When temporarily securing, keep the reservoir tank upright to avoid a fluid leak.
Vehicle inside
Follow procedure below to disconnect engine room harness connectors at passenger room side, and tempo-
rarily secure them on engine.
1. Remove passenger-side kicking plate, dash side finisher, and glove box. Refer to EI-37, "
BODY SIDE
TRIM" and IP-10, "INSTRUMENT PANEL ASSEMBLY" .
2. Disconnect engine room harness connectors at unit sides TCM, ECM and other.
3. Disengage intermediate fixing point. Pull out engine room harnesses to engine room side, and temporarily
secure them on engine.
CAUTION:
When pulling out harnesses, take care not to damage harnesses and connectors.
After temporarily securing, cover connectors with vinyl or similar material to protect against for-
eign material adhesion.
Page 3178 of 5621
![INFINITI M35 2006 Factory Service Manual ENGINE ASSEMBLY
EM-115
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Vehicle Underbody
1. Remove A/T fluid cooler hoses and power steering oil pump oil cooler hoses.
Install pl INFINITI M35 2006 Factory Service Manual ENGINE ASSEMBLY
EM-115
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Vehicle Underbody
1. Remove A/T fluid cooler hoses and power steering oil pump oil cooler hoses.
Install pl](/img/42/57023/w960_57023-3177.png)
ENGINE ASSEMBLY
EM-115
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Vehicle Underbody
1. Remove A/T fluid cooler hoses and power steering oil pump oil cooler hoses.
Install plug to avoid leakage of A/T fluid and power steering fluid.
2. Disconnect heated oxygen sensor 2 harness.
3. Remove three way catalyst and exhaust front tube. Refer to EX-3, "
EXHAUST SYSTEM" .
4. Disconnect steering lower joint at power steering gear assembly side, and release steering lower shaft.
Refer to PS-13, "
STEERING COLUMN" .
5. Remove rear propeller shaft. Refer to PR-6, "
REAR PROPELLER SHAFT" .
6. Disengage A/T control rod at control device assembly side. Then, temporarily secure it on the transmis-
sion assembly, so that it does not sag. Refer to AT- 2 2 2 , "
SHIFT CONTROL SYSTEM" .
7. Remove rear plate cover from oil pan (upper). Then remove bolts fixing drive plate to torque converter.
Refer to EM-29, "
OIL PAN AND OIL STRAINER" and AT- 2 7 1 , "TRANSMISSION ASSEMBLY" .
8. Remove transmission joint bolts which pierce at oil pan (upper) lower rear side. Refer to AT- 2 7 1 , "
TRANS-
MISSION ASSEMBLY" .
9. Remove front stabilizer at transverse link side. Refer to FSU-18, "
STABILIZER BAR" .
10. Remove lower ends of left and right strut from transverse link. Refer to FSU-6, "
FRONT SUSPENSION
ASSEMBLY" .
11. Separate steering outer sockets from steering knuckle. Refer to PS-18, "
POWER STEERING GEAR" .
12. Remove transverse links mounting bolts at knuckle side. Refer to FSU-14, "
TRANSVERSE LINK" .
Removal Work
1. Use a manual lift table caddy (commercial service tool) or equiv-
alently rigid tool such as a transmission jack. Securely support
bottom of suspension member and the transmission assembly.
CAUTION:
Put a piece of wood or something similar as the supporting
surface, secure a completely stable condition.
2. Remove rear engine mounting member bolts.
3. Remove front suspension member mounting bolts and nuts. Refer to FSU-6, "
FRONT SUSPENSION
ASSEMBLY" .
4. Carefully lower jack, or raise lift to remove the engine, the transmission assembly and front suspension
member. When performing work, observe the following caution:
CAUTION:
Confirm there is no interference with the vehicle.
Make sure that all connection points have been disconnected.
Keep in mind the center of vehicle gravity changes. If necessary, use jack(s) to support the vehi-
cle at rear jacking point(s) to prevent it from falling it off the lift.
Separation Work
1. Install engine slingers into front of cylinder head (right bank) and
rear of cylinder head (left bank).
PBIC0804E
Slinger bolts:
: 28.0 Nꞏm (2.9 kg-m, 21 ft-lb)
PBIC2061E
Page 3179 of 5621
![INFINITI M35 2006 Factory Service Manual EM-116
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
To protect rocker cover against damage caused by tilting of
engine slinger, insert spacer between cylinder head and
e INFINITI M35 2006 Factory Service Manual EM-116
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
To protect rocker cover against damage caused by tilting of
engine slinger, insert spacer between cylinder head and
e](/img/42/57023/w960_57023-3178.png)
EM-116
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
To protect rocker cover against damage caused by tilting of
engine slinger, insert spacer between cylinder head and
engine rear lower slinger, in direction shown in the figure.
NOTE:
Spacer is a component part of engine rear upper slinger
assembly.
2. Remove power steering oil pump from engine side. Refer to PS-29, "
POWER STEERING OIL PUMP" .
3. Remove engine mounting insulators (RH and LH) under side nuts with power tool.
4. Lift with hoist and separate the engine and the transmission assembly from front suspension member.
CAUTION:
Before and during this lifting, always make sure that any harnesses are left connected.
Avoid damage to and oil/grease smearing or spills onto engine mounting insulator.
5. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
6. Remove starter motor. Refer to SC-10, "
STARTING SYSTEM" .
7. Separate the engine from the transmission assembly. Refer to AT- 2 7 1 , "
TRANSMISSION ASSEMBLY" .
8. Remove each engine mounting insulator and each engine mounting bracket from the engine with power
tool.
INSTALLATION
Note the following, and install in the reverse order of removal.
Do not allow engine mounting insulator to be damage and careful no oil gets on it.
For a location with a positioning pin, insert it securely into hole of mating part.
For a part with a specified installation orientation, refer to component figure in EM-29, "Components (2WD
Models)" .
When installing engine mounting bracket (RH and LH) on cylin-
der block, tighten two upper bolts (shown as “A” in the figure)
first. Then tighten two lower bolts (shown as “B” in the figure).
Make sure all engine mounting insulators are seated properly, then tighten mounting nuts.
Tighten rear engine mounting member bolts in numerical order
as shown in the figure.
KBIA1017E
PBIC2062E
Vehicle front
KBIA3557J
Page 3180 of 5621
![INFINITI M35 2006 Factory Service Manual ENGINE ASSEMBLY
EM-117
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, l INFINITI M35 2006 Factory Service Manual ENGINE ASSEMBLY
EM-117
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, l](/img/42/57023/w960_57023-3179.png)
ENGINE ASSEMBLY
EM-117
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc. Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
Page 3182 of 5621
![INFINITI M35 2006 Factory Service Manual ENGINE ASSEMBLY
EM-119
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
If items or work required are not covered by the engine section, refer to the applicable sections.
Always u INFINITI M35 2006 Factory Service Manual ENGINE ASSEMBLY
EM-119
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
If items or work required are not covered by the engine section, refer to the applicable sections.
Always u](/img/42/57023/w960_57023-3181.png)
ENGINE ASSEMBLY
EM-119
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
If items or work required are not covered by the engine section, refer to the applicable sections.
Always use the support point specified for lifting.
Use either 2-pole lift type or separate type lift as best you can. If board-on type is used for
unavoidable reasons, support at rear axle jacking point with transmission jack or similar tool
before starting work, in preparation for the backward shift of center of gravity.
For supporting points for lifting and jacking point at rear axle, refer to GI-42, "Garage Jack and
Safety Stand and 2-Pole Lift" .
REMOVAL
Outline
At first, remove the engine, the transmission assembly, the transfer assembly and the front final drive assem-
bly with front suspension member from vehicle downward. Then separate the engine, the transmission assem-
bly, the transfer and the front final drive assembly.
Preparation
1. Release fuel pressure. Refer to EC-98, "FUEL PRESSURE RELEASE" .
2. Drain engine coolant from radiator. Refer to CO-11, "
Changing Engine Coolant" .
CAUTION:
Perform this step when engine is cold.
Do not spill engine coolant on drive belts.
3. Disconnect both battery terminals. Refer to SC-4, "
BATTERY" .
4. Remove the following parts:
Engine room cover (RH and LH); Refer to EM-14, "ENGINE ROOM COVER" .
Engine cover; Refer to EM-19, "INTAKE MANIFOLD COLLECTOR" .
Front road wheel and tires (power tool)
Front and rear engine undercover (power tool)
Front cross bar; Refer to FSU-23, "FRONT SUSPENSION ASSEMBLY" .
Cowl top cover (RH); Refer to EI-18, "COWL TOP" .
Air duct and air cleaner case assembly; EM-17, "AIR CLEANER AND AIR DUCT" .
5. Discharge refrigerant from A/C circuit. Refer to ATC-151, "
REFRIGERANT LINES" .
6. Remove radiator hoses (upper and lower). Refer to CO-14, "
RADIATOR" .
Engine Room LH
1. Disconnect heater hose from vehicle-side, and fit a plug onto hose end to prevent engine coolant leak.
2. Disconnect wire bonding (between vehicle to left bank cylinder head).
3. Disconnect A/C piping from A/C compressor, and temporarily fasten it on vehicle with a rope. Refer to
AT C - 1 5 1 , "
REFRIGERANT LINES" .
4. Disconnect brake booster vacuum hose.
Engine Room RH
1. Disconnect battery positive cable vehicle side and temporarily fasten it on engine.
2. Disconnect grounding cables.
3. Disconnect fuel feed hose (with damper) and EVAP hose. Refer to EM-45, "
FUEL INJECTOR AND FUEL
TUBE" .
CAUTION:
Fit plugs onto disconnected hoses to prevent fuel leak.
4. Remove reservoir tank of power steering oil pump and piping from vehicle, and temporarily secure them
on engine. Refer to PS-29, "
POWER STEERING OIL PUMP" .
CAUTION:
When temporarily securing, keep the reservoir tank upright to avoid a fluid leak.
Vehicle inSide
Follow procedure below to disconnect engine room harness connectors at passenger room side, and tempo-
rarily secure them on engine.
Page 3183 of 5621
![INFINITI M35 2006 Factory Service Manual EM-120
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
1. Remove passenger-side kicking plate, dash side finisher, and glove box. Refer to EI-37, "BODY SIDE
TRIM" and INFINITI M35 2006 Factory Service Manual EM-120
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
1. Remove passenger-side kicking plate, dash side finisher, and glove box. Refer to EI-37, "BODY SIDE
TRIM" and](/img/42/57023/w960_57023-3182.png)
EM-120
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2006 January2006 M35/M45
1. Remove passenger-side kicking plate, dash side finisher, and glove box. Refer to EI-37, "BODY SIDE
TRIM" and IP-10, "INSTRUMENT PANEL ASSEMBLY" .
2. Disconnect engine room harness connectors at unit sides TCM, ECM and other.
3. Disengage intermediate fixing point. Pull out engine room harnesses to engine room side, and temporarily
secure them on engine.
CAUTION:
When pulling out harnesses, take care not to damage harnesses and connectors.
After temporarily securing, cover connectors with vinyl or similar material to protect against for-
eign material adhesion.
Vehicle Underbody
1. Remove A/T fluid cooler hoses and power steering oil pump oil cooler hoses.
Install plug to avoid leakage of A/T fluid and power steering fluid.
2. Disconnect heated oxygen sensor 2 harness. Refer to EX-3, "
EXHAUST SYSTEM" .
3. Remove three way catalyst and exhaust front tube. Refer to EX-3, "
EXHAUST SYSTEM" .
4. Disconnect steering lower joint at power steering gear assembly side, and release steering lower shaft.
Refer to PS-13, "
STEERING COLUMN" .
5. Remove rear propeller shaft. Refer to PR-6, "
REAR PROPELLER SHAFT" .
6. Remove front drive shaft (both side). Refer to FAX-8, "
FRONT DRIVE SHAFT" .
7. Disconnect harness connector from transmission assembly and transfer assembly.
8. Disengage A/T control rod at control device assembly side. Then, temporarily secure it on the transmis-
sion assembly, so that it does not sag. Refer to AT-222, "
SHIFT CONTROL SYSTEM" .
9. Remove rear plate cover from oil pan (upper). Then remove bolts fixing drive plate to torque converter.
Refer to EM-29, "
OIL PAN AND OIL STRAINER" and AT-271, "TRANSMISSION ASSEMBLY" .
10. Remove bolts fixing the transmission assembly to lower rear side of oil pan (upper). Refer to AT- 2 7 1 ,
"TRANSMISSION ASSEMBLY" .
11. Remove front stabilizer at transverse link side. Refer to FSU-18, "
STABILIZER BAR" .
12. Remove lower ends of left and right strut from transverse link. Refer to FSU-23, "
FRONT SUSPENSION
ASSEMBLY" .
13. Separate steering outer sockets from steering knuckle. Refer to PS-18, "
POWER STEERING GEAR" .
14. Remove transverse links mounting bolts at knuckle side. Refer to FSU-31, "
TRANSVERSE LINK" .
Removal Work
1. Use a manual lift table caddy (commercial service tool) or equiv-
alently rigid tool such as a transmission jack. Securely support
bottom of suspension member and transmission.
CAUTION:
Put a piece of wood or something similar as the supporting
surface, secure a completely stable condition.
2. Remove rear engine mounting member bolts.
3. Remove front suspension member mounting bolts and nuts. Refer to FSU-23, "
FRONT SUSPENSION
ASSEMBLY" .
4. Carefully lower jack, or raise lift to remove the engine, transmission assembly, transfer, front final drive
assembly and front suspension member. When performing work, observe the following caution:
CAUTION:
Confirm there is no interference with the vehicle.
Make sure that all connection points have been disconnected.
Keep in mind the center of the vehicle gravity changes. If necessary, use jack(s) to support the
vehicle at rear jacking point(s) to prevent it from falling it off the lift.
PBIC0804E
Page 3184 of 5621
![INFINITI M35 2006 Factory Service Manual ENGINE ASSEMBLY
EM-121
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Separation Work
1. Install engine slingers into front of cylinder head (right bank) and
rear of cylinder he INFINITI M35 2006 Factory Service Manual ENGINE ASSEMBLY
EM-121
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Separation Work
1. Install engine slingers into front of cylinder head (right bank) and
rear of cylinder he](/img/42/57023/w960_57023-3183.png)
ENGINE ASSEMBLY
EM-121
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Separation Work
1. Install engine slingers into front of cylinder head (right bank) and
rear of cylinder head (left bank).
To protect rocker cover against damage caused by tilting of
engine slinger, insert spacer between cylinder head and
engine rear lower slinger, in direction shown in the figure.
NOTE:
Spacer is a component part of engine rear upper slinger
assembly.
2. Remove power steering oil pump from engine side. Refer to PS-29, "
POWER STEERING OIL PUMP" .
3. Remove engine mounting insulators (RH and LH) under side nuts with power tool.
4. Lift with hoist and separate the engine, the transmission assembly, the transfer assembly and the front
final drive assembly from front suspension member.
CAUTION:
Before and during this lifting, always check if any harnesses are left connected.
Avoid damage to and oil/grease smearing or spills onto engine mounting insulator.
5. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
6. Remove starter motor. Refer to SC-10, "
STARTING SYSTEM" .
7. Remove front propeller shaft from the front final drive assembly side. Refer to PR-4, "
FRONT PROPEL-
LER SHAFT" .
8. Separate the engine from the transmission assembly. Refer to AT-271, "
TRANSMISSION ASSEMBLY" .
9. Remove the front final drive assembly from oil pan (upper). Refer to FFD-13, "
FRONT FINAL DRIVE
ASSEMBLY" .
10. Remove each engine mounting insulator and each engine mounting bracket from the engine with power
tool.
INSTALLATION
Note the following, and install in the reverse order of removal.
Do not allow engine mounting insulator to be damage and careful no engine oil gets on it.
For a location with a positioning pin, insert it securely into hole of mating part.
For a part with a specified installation orientation, refer to component figure in EM-35, "Components (AWD
Models)" . Slinger bolts:
: 28.0 Nꞏm (2.9 kg-m, 21 ft-lb)
PBIC2061E
KBIA1017E