start ISUZU KB P190 2007 Workshop Repair Manual

ISUZU KB P190 2007 Workshop Repair Manual KB P190 2007 ISUZU ISUZU https://www.carmanualsonline.info/img/61/57177/w960_57177-0.png ISUZU KB P190 2007 Workshop Repair Manual

Page 2016 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A-2 ENGINE MECHANICAL (C24SE) 
PAGE 
Camshaft Housing, Check for Plance Surface .........................................................   6A-39  
Cylinder Head, Removal and Installation............

Page 2017 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-3 
PAGE 
ENGINE EXTERNAL PARTS ...........................................................................................   6A-65  Radiator ..............................

Page 2019 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-5 
General Information on Engine Service 
The following information on engine service should be noted carefully, as it is important in preventing damage and  
contributing

Page 2026 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A-12 ENGINE MECHANICAL (C24SE) 
Engine - General C24SE 
Fuel system Electronically controlled Multi Port Fuel Injection System 
Fuel pump type  Electric 
Fuel pressure kg/cm2 (psi/Pa) 3.4 (48.4/334)

Page 2032 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A-18 ENGINE MECHANICAL (C24SE) 
OPERATIONS ON ENGINE AGGREGATES 
  Engine Damping Blocks (Engine Without  
Transmission) 
  Removal 
 1.  Remove bonnet.  
 2.  Remove radiator. 
  3.  Remove air inle

Page 2061 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-47 
 
Starter Ring Gear (Manual Transmission) 
Removal 
  1.  Remove flywheel according to the corresponding operation. 
  2.  Drill starter ring gear underneath tooth gap

Page 2077 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-63 
OPERATIONS ON COOLING SYSTEM 
 Caution! 
Before working with the cooling system, be sure to confirm that  
the temperature of the engine is cooled down. 
Failure to ob

Page 2081 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-67 
 
 Coating sealing surfaces with Silicone Grease 
Installation 
  1.  Install water pump to cylinder block with new rubber O-ring. 
  2.  Apply tension to toothed belt

Page 2092 of 6020

ISUZU KB P190 2007  Workshop Repair Manual 6A-78 ENGINE MECHANICAL (C24SE) 
  Cooling System 
Radiator  
 
Type: Cross-flow 
 
Radiator core surface in cm
2: 2000 
 
Cooling system capacity (in litres):  8 
 
   
Anti-freeze Mixture 
Anti-free

Page 2101 of 6020

ISUZU KB P190 2007  Workshop Repair Manual ENGINE MECHANICAL (C24SE) 6A-87 
  
 
 
 
 
 
  Crankshaft, Cylinder Block (continued) 
Flywheel 
Starter ring gear  Before fitting, heat ring gear to 180 °C - 
230 °C 
  
Lateral run-out  Permissib