Dif JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF GRAND CHEROKEE 2002 WJ / 2.G JEEP JEEP https://www.carmanualsonline.info/img/16/7175/w960_7175-0.png JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF

Page 142 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF ADJUSTMENTS
Ring and pinion gears are supplied as matched
sets only. The identifying numbers for the ring and
pinion gear are etched into the face of each gear (Fig.
6). A plus (+) number, minus (±)

Page 143 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF PINION GEAR DEPTH VARIANCE
Original Pinion
Gear Depth
VarianceReplacement Pinion Gear Depth Variance
24232221 0 +1 +2 +3 +4
+4+0.008 +0.007 +0.006 +0.005 +0.004 +0.003 +0.002 +0.001 0
+3+0.007 +0.006

Page 144 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF NOTE: Arbor Discs 6927A has different step diame-
ters to fit other axles. Choose proper step for axle
being serviced.
(5) Assemble Dial Indicator C-3339 into Scooter
Block D-115-2 and secure set scre

Page 145 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF (2) Install ring gear on differential case and
tighten bolts to specification.
(3)
Install Dummy Bearings 6929-A on differential case.
(4) Install differential case in the housing.
(5) Record the thic

Page 146 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF (8) Thread Pilot Stud C-3288-B into rear cover bolt
hole below ring gear (Fig. 17).
(9) Attach the Dial Indicator C-3339 to pilot stud
and position the indicator plunger on the flat surface
between th

Page 147 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF (14) Remove differential case and dummy bearings
from the housing.
(15) Install the pinion gear in the housing. Install
the pinion yoke and establish the correct pinion
rotating torque.
(16) Install d

Page 148 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF (32) Position the indicator plunger against a ring
gear tooth (Fig. 22).
(33) Push and hold ring gear upward while not
allowing the pinion gear to rotate.
(34) Zero dial indicator face to pointer.
(35

Page 150 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF DIFFERENTIAL BEARING PRELOAD CHECK
The final check on the differential assembly before
installing the axles is torque to rotate pinion and dif-
ferential combined. This will verify the correct differ-

Page 154 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF AXLE SHAFTS
REMOVAL
(1) Place transmission in neutral.
(2) Raise and support vehicle.
(3) Remove wheel and tire assembly.
(4) Remove brake caliper and rotor.
(5) Remove nuts holding axle retainer plat

Page 157 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Manual PDF (10) Remove pinion seal with Remover 7794-A and
a slide hammer (Fig. 33).
INSTALLATION
(1) Apply a light coating of gear lubricant on the
lip of pinion seal. Install seal with an appropriate in
instal