ignition switch LEXUS SC400 1991 Service Repair Manual
[x] Cancel search | Manufacturer: LEXUS, Model Year: 1991, Model line: SC400, Model: LEXUS SC400 1991Pages: 4087, PDF Size: 75.75 MB
Page 3724 of 4087

WIRING DIAGRAM
Check for the test mode.
Check for open in harness and connector
between ECU and relay.Repair or replace harness or
connector.
Proceed to next circuit inspection shown
on matrix chart (See page
TR±39).
Check and replace ECU.
Diag. Code 43Starter Signal Circuit
CIRCUIT DESCRIPTION
When the engine is cranked, the intake air flow is slow, so fuel vaporization is poor. A rich mixture is therefore
necessary in order to achieve good startability. While the engine is being cranked, the battery voltage is applied
to terminal STA of the ECU. The starter signal is mainly used to increase the fuel inj\
ection volume for the starting
injection control and after±start injection control.
DTC No.DTC Detecting ConditionTrouble Area
43No starter signal to ECU.
Open or short in starter signal circuit.
Open or short in ignition switch or starter
relay circuit.
ECU
DIAGNOSTIC CHARTDIAGNOSTIC CHART
HINT: This diagnostic chart is based on the premise that the engine is cranke\
d normally. If the engine is not
cranked, proceed to the matrix chart of problem symptoms on page TR±39.
TR±96
±
ENGINE TROUBLESHOOTING Circuit Inspection
WhereEverybodyKnowsYourName
Page 3725 of 4087

INSPECTION PROCEDURE
Check output condition of diag. code 43
Setting the test mode.
6. Turn ignition switch OFF.
7. Connect terminals TE2 and E1 of TDCL.
8. Turn ignition switch ON.(Don't start the engine)
9. Connect terminals TE1 and E1 of TDCL.
Check if code ª43º is output by the ªCHECKº en-
gine warning light.
Code ª43º is output.
Start the engine.
Check if the code ª43º disappear.
Code ª43º is not output.
Proceed to next circuit inspection shown on
matrix chart (See page
TR±39).
Check for open in harness and connector between engine (& ECT) ECU
and starter relay (See page IN±27)
Repair or replace harness or connector.
Check and replace engine (& ECT) ECU.
±
ENGINE TROUBLESHOOTING Circuit InspectionTR±97
WhereEverybodyKnowsYourName
Page 3727 of 4087

OKNG
OKNG
1Check operation of speedometer.
Drive the vehicle and check if the operation of the speedometer in the c\
ombination meter is normal.
The No. 1 speed sensor is operating normally if the speedometer display is \
normal.C
Hint
Check speedometer circuit. See combination meter trou-
bleshooting on page BE±131.
2Check voltage between terminal SPD of engine & ECT ECU connector and bod\
y ground.
C
OK
P(2) Shift the shift level to N range.
(2) Jack up a read wheel on one side.
(2) Connect the Check Harness A.
(See page TR±30)
(2) Turn ignition switch on.
Measure voltage between terminal SPD of engine &
ECT ECU connector and body ground when the wheel
is turned slowly.
Voltage is generated intermittently.
Check speedometer circuit. See combination meter trou-
bleshooting on page BE±131.
Check and replace engine & ECT ECU.
±
ENGINE TROUBLESHOOTING Circuit InspectionTR±99
WhereEverybodyKnowsYourName
Page 3728 of 4087

Diag. Code 43Starter Signal Circuit
CIRCUIT DESCRIPTION
When the engine is cranked, the intake air flow is slow, so fuel vaporization is poor. A rich mixture is therefore
necessary in order to achieve good startability. While the engine is being cranked, the battery voltage is applied
to terminal STA of the ECU. The starter signal is mainly used to increase the fuel inj\
ection volume for the starting
injection control and after±start injection control.
Code No.Diagnostic Code Detecting ConditionTrouble Area
43No starter signal to ECU
Open or short in starter signal circuit.
Open or short in ignition switch or main relay
circuit.
ECU
DIAGNOSTIC CHARTDIAGNOSTIC CHART
HINT: This diagnostic chart is based on the premise that the engine is cranked nor\
mally. If the engine is not
cranked, proceed to the matrix chart of problem symptoms on page TR±35.
Check for the test mode.
Check for open in harness and connectors
between ECU and relay.
Check and replace ECU. Proceed to next circuit inspection shown
on matrix chart (See page
TR±35).
Repair or replace harness or
connector.
WIRING DIAGRAM
TR±100±
ENGINE TROUBLESHOOTING Circuit Inspection
WhereEverybodyKnowsYourName
Page 3729 of 4087

NGOK
OKNG
v
INSPECTION PROCEDURE
1Check output condition of diag. code 43.
C
OK
P
OK
C
Setting the test mode.
(2) Turn ignition switch OFF.
(2) Connect terminals TE2 and E1 of TDCL.
(2) Turn ignition switch ON.(Don't start the engine)
(2) Connect terminals TE1 and E1 of TDCL.
Check if code ª43º is output by the ªCHECKº engine
warning light.
Code ª43º is output.
Start the engine.
Check if the code ª43º disapears.
Code ª43º is not output.
Proceed to next circuit inspection shown on maxtric
chart (See page TR±35).
2Check for open in harness and connectors between engine & ECT ECU and st\
arter relay
(See page IN±27).
Repair or replace harness or connector.
Check and replace engine & ECT ECU.
±
ENGINE TROUBLESHOOTING Circuit InspectionTR±101
WhereEverybodyKnowsYourName
Page 3745 of 4087

NGOK
OKNG
INSPECTION PROCEDURE
1Check voltage between terminals EGR 1 ~ 4 of engine & ECT ECU connector and b\
ody ground.
C
OK
P(2) Connect the Check Harness A.(See page TR±30).
(2) Turn ignition switch on.
Measure voltage between terminals EGR 1 ~ 4 of en-
gine & ECT ECU connector and body ground.
Voltage: 10 ± 14 V
Go to step 5.
2Check voltage between terminals B1 and B2 of EGR step motor connector an\
d body ground.
C
OK
P(2) Disconnect EGR step motor connector.
(2) Turn ignition switch on.
Measure voltage between terminals B1 and B2 of EGR
step motor connector and body ground.
Voltage: 10 ± 14 V
Check for ECU power source circuit
(See page TR±124).
±
ENGINE TROUBLESHOOTING Circuit InspectionTR±111
WhereEverybodyKnowsYourName
Page 3750 of 4087

OKNG
NGOK
OKNG
INSPECTION PROCEDURE
1Check fuel pump operation.
C
OK
P1. Turn ignition switch ON.
2. Using SST, connect terminals +B and FP of checkconnector.
SST 09843±18020
Check that there is pressure in the hose from the fuel
filter.
Fuel pressure can be felt.
Go to step .
2Check for open and short in harness and connector between terminals +B e +B, FP FP of
the check connector and fuel pump ECU (See page IN±27).
Go to step .
Repair or replace harness or connector.
3Check voltage of terminal +B of check connector.
C
OK
PTurn ignition switch ON.
Measure voltage between terminal +B of check connec-
tor and body ground.
Voltage: 10 ± 14 V
Check for ECU power source circuit (See page TR±120),
and check for open in harness and connector between
terminal +B of check connector and main relay.
TR±112
±
ENGINE TROUBLESHOOTING Circuit Inspection
WhereEverybodyKnowsYourName
Page 3751 of 4087

NGOK
NGOK
OKNG
OKNG
4Check for open and short in harness and connector between terminal FP of chec\
k connector,
fuel pump and body ground (See page IN±27).
Repair or replace fuel pump.
Repair or replace harness or connector.
5Check voltage between terminals FPC and E of fuel pump ECU connector.
C
OK
P1. Remove the LH quarter trim panel. (See page FI±81 )
2. Disconnect fuel pump ECU connector.
Measure voltage between terminals FPC and E of fuel
pump ECU connector when ignition switch is turned to
start.
Voltage: 4 ± 6 V
Replace fuel pump ECU.
6Check for open in harness and connector between terminal FPC of engine (& ECT) ECU and ter-
minal FPC of fuel pump ECU, terminal E of fuel pump ECU and body ground (See\
page IN±27).
Repair or replace harness or connector.
7Check for open and short in harness and connector between terminal DI of engin\
e (& ECT) ECU
and terminal DI of fuel pump ECU (See page IN±27).
Repair or replace harness or connector.
Check and replace engine (& ECT) ECU.
±
ENGINE TROUBLESHOOTING Circuit InspectionTR±113
WhereEverybodyKnowsYourName
Page 3754 of 4087

OKNG
NGOK
OKNG
INSPECTION PROCEDURE
1Check fuel pump operation.
C
OK
P(2) Turn ignition switch ON.
(2) Using SST. connect terminals + B and FP of checkconnector.
SST 09843±18020
Check that there is projection of the head of the pulsa-
tion damper screw.
Projection of the head of the pulsation damper
screw.
Go to step 3.
2Check for open and short in harness and connector between terminals + B e + B FP e FP of
the check connector and fuel pump ECU (See page IN±27).
Go to step 5.
Repair or replace harness or connector.
3Check voltage or terminal + B of check connector.
C
OK
PTurn ignition switch ON.
Measure voltage between terminal + B of check connec-
tor and body ground.
Voltage: 10 ± 14 V
Check for ECU power source circuit
(See page TR±124), and check for open in harness and
connector between terminal + B of check connector and
main relay.
TR±116
±
ENGINE TROUBLESHOOTING Circuit Inspection
WhereEverybodyKnowsYourName
Page 3755 of 4087

NGOK
NGOK
OKNG
OKNG
4Check for open and short in harness and connector between terminal FP of chec\
k connector,
fuel pump and body ground (See page IN±27).
Repair or replace fuel pump.
Repair or replace harness or connector.
5check voltage between terminals FPC and E of fuel pump ECU connector.
C
OK
P(2) Remove the LH quarter trim panel. (See page BO±123)
(2) Disconnect fuel pump ECU connector.
Measure voltage between terminals FPC and E of fuel
pump ECU connector when ignition switch is turned to
start.
Voltage: 4 ± 6 V
Replace fuel pump ECU.
6Check for open in harness and connector between terminal FPC of engine & ECT ECU a\
nd termi-
nal FPC of fuel pump ECU, terminal E of fuel pump ECU and body ground (See\
page IN±27).
Repair or replace harness or connector.
7Check for open in harness and connector between terminal DI of engine & ECT E\
CU and termi-
nal DI of fuel pump ECU (See page IN±27).
Repair or replace harness or connector.
Check and replace engine & ECT ECU.
±
ENGINE TROUBLESHOOTING Circuit InspectionTR±117
WhereEverybodyKnowsYourName