ignition switch LEXUS SC400 1991 Service Manual PDF

LEXUS SC400 1991 Service Manual PDF SC400 1991 LEXUS LEXUS https://www.carmanualsonline.info/img/36/57051/w960_57051-0.png LEXUS SC400 1991 Service Manual PDF

Page 280 of 4087

LEXUS SC400 1991  Service Manual PDF 
CHECK TERMINAL TT OUTPUT
VOLTAGE
AT00R±01
When a voltmeter is connected to the DLC1, the following
items can be checked.
1.  Throttle position sensor signal
2. Brake signal
3. Shift position signal

Page 321 of 4087

LEXUS SC400 1991  Service Manual PDF 
OKNG
OKNG
INSPECTION PROCEDURE
1Check operation of speedometer.
Drive the vehicle and check if the operation of the speedometer in the c\
ombination meter is normal.
The No. 1 vehicle speed sensor is

Page 343 of 4087

LEXUS SC400 1991  Service Manual PDF 
OKNG
OKNG
OKNG
INSPECTION PROCEDURE
1Main throttle position signal check.
C
OK
Hint
PTurn ignition switch ON (Do not start the engine).
Check voltage at the terminal T
T of the DLC2 while grad-
ually

Page 345 of 4087

LEXUS SC400 1991  Service Manual PDF 
OKNG
OKNG
OKNG
INSPECTION PROCEDURE
1Check voltage between terminal KD of ECM connector and body ground.
C
OK
P1. Connect  the check harness A to the ECM (See EGsection).
2. Turn ignition switch ON (

Page 347 of 4087

LEXUS SC400 1991  Service Manual PDF 
OKNG
OKNG
OKNG
INSPECTION PROCEDURE
1Check voltage between terminal R, PNP, 2, L of ECM connector and body ground.
C
OK
P1. Connect  the check harness A to the ECM (See EGsection).
2. Turn ignition s

Page 349 of 4087

LEXUS SC400 1991  Service Manual PDF 
OKNG
OKNG
OKNG
INSPECTION PROCEDURE
1Check operation of stop light.
Check if the stop lights go on and off normally when the brake pedal is operated and released.C
Check and repair stop light circuit

Page 351 of 4087

LEXUS SC400 1991  Service Manual PDF 
OKNG
OKNG
OKNG
INSPECTION PROCEDURE
1Check voltage between terminal P of ECM connector and body ground.
C
OK
Hint
P1. Connect  the check harness A to the ECM (See EGsection).
2. Turn ignition switch

Page 354 of 4087

LEXUS SC400 1991  Service Manual PDF 
OKNG
OKNG
OKNG
INSPECTION PROCEDURE
1Check operation of O/D Main Switch
C
OK
Hint
C
OK
1. Turn ignition switch ON.
2. Check ªO/D OFFº light when O/D main switch ispushed  in to ON.
ªO/D OFFº ligh

Page 357 of 4087

LEXUS SC400 1991  Service Manual PDF 
NGOK
NGOK
OKNG
INSPECTION PROCEDURE
1Check voltage between terminal OD1of ECM connector and body ground.
C
OK
P1. Connect  the check harness A to the ECM (See EGsection).
2. Turn ignition switch ON.

Page 377 of 4087

LEXUS SC400 1991  Service Manual PDF 
ON±VEHICLE REPAIR
AT06Y±04
CAUTION: Work must be started after 90 seconds from
the time the ignition switch is turned to the ªLOCKº posi-
tion and the negative (±) terminal cable is disconnected