engine coolant MAZDA 232 1990 Workshop Manual Suplement

MAZDA 232 1990 Workshop Manual Suplement 232 1990 MAZDA MAZDA https://www.carmanualsonline.info/img/28/57056/w960_57056-0.png MAZDA 232 1990 Workshop Manual Suplement

Page 21 of 677

MAZDA 232 1990  Workshop Manual Suplement A PRE-DELIVERY INSPECTION 
PRE-DELIVERY INSPECTION TABLE 
pieziG- 
INSPECT and ADJUST, if necessary, the following Items to 
specification: 
D Glass, exterior bright metal and paint for damage 
Cl Whe

Page 23 of 677

MAZDA 232 1990  Workshop Manual Suplement A SCHEDULED MAINTENANCE SERVICES (Australia) 
lumber of months or km, whichever cumes first 
P 
_ 48 54 60 1 66 72 
5 
60 67.5 75 90  .--- .-- - 
.-m-w --v-w _ _ -_-- - - _ _ - - 
_ -- - - --- __- 
_-

Page 25 of 677

MAZDA 232 1990  Workshop Manual Suplement SCHEDULED MAlNTENANCE SERVICES (Europe) 
Maintenance Number of months or km (miles), whichever comes first 
Months” - 6 1 12 18 24 1 30 
36 1 42 48 
Maintenance Wometers 1,000 10,000 20,000 30,000 4

Page 28 of 677

MAZDA 232 1990  Workshop Manual Suplement SCHEDULED MAtNTENANCE SERVICES (Europe) A 
Maintenance Number of months or km (miles), whichever comes first 
Months” - 6 1 12 18 ‘24 30136 42 48 
Maintenance Kilometers 1,000 10,000 20,000 30,000

Page 35 of 677

MAZDA 232 1990  Workshop Manual Suplement Bl SUPPLEMENTAL SERVICE tNFORMAT1ON, REMOVAL 
SUPPLEMENTAL SERVICE INFORMATION 
The following points in this section are changed in comparison with Workshop Manual [Europe (I 203-I U-89F), 
Australia

Page 52 of 677

MAZDA 232 1990  Workshop Manual Suplement INSTALLATION Bl 
Air cleaner assembly 
1. Install the air cleaner assembly. 
Tightening torque 
@: 19-25 Nm (I-9-2.6 m-kg, 14-19 Mb) 
@: 7.8-11 Nm (80~-110 cm-kg, 69-95 in-lb) 
2. Connect the airflow

Page 65 of 677

MAZDA 232 1990  Workshop Manual Suplement B2 REMOVAL 
REMOVAL 
Warning 
l Release the fuel pressure. (Refer to Section FZ.) 
PROCEDURE 
i. Disconnect the negative battery cable. 
2. Drain the engine coolant and transaxle oil. 
3. Remove in th

Page 75 of 677

MAZDA 232 1990  Workshop Manual Suplement B2 ENGINE STAND DISMOUNTING 
93GOB2-7% 
93AOB2-077 
05WOBX-25 
82-22 Water Bypass Pipe 
1. Apply a small amount of engine coolant to the new O-ring. 
2. install the O-ring on the pipe. 
3. InstaIi the

Page 87 of 677

MAZDA 232 1990  Workshop Manual Suplement 82 INSTALLATION 
Steps after installation 
1. If the engine oil was drained, refill with the specified amount and type of engine oil. 
2. Fill the radiator with the specified amount and type of engine

Page 91 of 677

MAZDA 232 1990  Workshop Manual Suplement E tNDEX 
INDEX 
- 
- &ANT RESERVOlR 
ENGiNE COOLANT 
TOTAL CAPACITY 
MTX: 5.0 liters (5.3 US qt, 4.4 Imp qt) 
ATX: 6.0 liters (6.3 US qt. 5.3 
tmp qt) 
1. Fan motor 
Inspection .._.....,._............
Page:   1-10 11-20 next >