wiring MITSUBISHI MONTERO 1998 Service Manual
[x] Cancel search | Manufacturer: MITSUBISHI, Model Year: 1998, Model line: MONTERO, Model: MITSUBISHI MONTERO 1998Pages: 1501, PDF Size: 25.81 MB
Page 591 of 1501

SUPER CHARGERS
SWITCHES
THERMAL VACUUM VALVES
THERMOSTATIC AIR DOOR ASSEMBLIES
THERMOSTATS AND HOUSINGS
THROTTLE BODIES
THROTTLE CABLES
THROTTLE LINKAGES AND CABLES
THROTTLE POSITION SENSORS
THROTTLE POSITION SWITCHES
TIMING BELT SPROCKETS
TIMING BELTS
TORQUE STRUTS
TRANSMISSION RANGE SWITCHES
TUBE CLAMPS
TUBE CONNECTORS
TUBE COUPLERS
TUBES
TURBO CHARGERS
VACUUM CONNECTIONS
VACUUM HOSES, TUBES AND CONNECTIONS (NON-METALLIC)
VACUUM REGULATOR SOLENOIDS
VACUUM TUBES
VEHICLE SPEED SENSORS
VOLUME AIR FLOW SENSORS
WASTE GATE CONTROL SOLENOIDS
WASTE GATES AND BOOST CONTROL MECHANISMS
WATER PUMPS (ELECTRIC)
WATER PUMPS (NON-ELECTRIC)
WIRING HARNESSES AND CONNECTORS
INTRODUCTION TO MOTORIST ASSURANCE PROGRAM (MAP)
OVERVIEW OF MOTORIST ASSURANCE PROGRAM
The Motorist Assurance Program is the consumer outreach
effort of the Automotive Maintenance and Repair Association, Inc.
(AMRA). Participation in the Motorist Assurance Program is drawn from
retailers, suppliers, independent repair facilities, vehicle
manufacturers and industry associations.
Our organization's mission is to strengthen the relationship
between the consumer and the auto repair industry. We produce
materials that give motorists the information and encouragement to
take greater responsibility for their vehicles-through proper,
manufacturer-recommended, maintenance. We encourage participating
service and repair shops (including franchisees and dealers) to adopt
(1) a Pledge of Assurance to their Customers and (2) the Motorist
Assurance Program Standards of Service. All participating service
providers have agreed to subscribe to this Pledge and to adhere to the
promulgated Standards of Service demonstrating to their customers that
they are serious about customer satisfaction.
These Standards of Service require that an inspection of the
vehicle's (problem) system be made and the results communicated to the\
customer according to industry standards. Given that the industry did
not have such standards, the Motorist Assurance Program successfully
promulgated industry inspection communication standards in 1994-95 for
the following systems: Exhaust, Brakes, ABS, Steering and Suspension,
Engine Maintenance and Performance, HVAC, and Electrical Systems.
Further, revisions to all of these inspection communication standards
are continually re-published. In addition to these, standards for
Drive Train and Transmissions have recently been promulgated.
Participating shops utilize these Uniform Inspection & Communication
Page 615 of 1501

exposed ................ B .. Require repair or replacement.
Wire lead corroded ...... A .. Require repair or replacement.
Wire lead open .......... A .. Require repair or replacement.
Wire lead shorted ....... A .. Require repair or replacement.
(1) - Determine cause and correct prior to repair or
replacement of part.
( 2) - Inoperative includes intermittent operation or out of OEM
specification. Some components may be serviceable;
check for accepted cleaning procedure.
\
\
\
\
\
\
\
COLD START INJECTORS
See FUEL AND COLD START INJECTORS .
CONNECTORS
See WIRING HARNESSES AND CONNECTORS .
COOLANT
COOLANT INSPECTION \
\
\
\
\
\
\
Condition Code Procedure
Acidity (pH) incorrect .. 1 ........... Suggest correction or
replacement.
Contaminated ............ B ...... ( 1) Require replacement or
recycling. Further inspection
required.
Level low ............... B ... ( 2) Require filling to proper
level.
Maintenance intervals ... 3 ........ ( 3) Suggest replacement.
Mixture incorrect ....... B ........... Require correction or
replacement.
Type incorrect .......... B ............ Require replacement.
( 1) - Determine source of contamination and require
correction prior to coolant replacement.
( 2) - Determine source of incorrect level and suggest repair.
( 3) - The system should be drained and/or flushed and
refilled with correct coolant according to OEM
recommended service interval and procedures.
\
\
\
\
\
\
\
COOLANT RECOVERY TANKS
COOLANT RECOVERY TANK INSPECTION \
\
\
\
\
\
\
Condition Code Procedure
Attaching hardware
broken ................. A .. Require repair or replacement
of hardware.
Attaching hardware
missing ................ C ......... Require replacement of
hardware.
Attaching hardware not
functioning ............ A .. Require repair or replacement
of hardware.
Leaking ................. A . Require repair or replacement.
Page 691 of 1501

Terminal burned, affecting
performance ............ A ........... (1) Require repair or
replacement.
Terminal burned, not
affecting performance .. 2 .. Suggest repair or replacement.
Terminal corroded,
affecting performance .. A .. Require repair or replacement.
Terminal corroded, not
affecting performance .. 2 .. Suggest repair or replacement.
Terminal loose, affecting
performance ............ B .. Require repair or replacement.
Terminal loose, not
affecting performance .. 1 .. Suggest repair or replacement.
Vibration ............... 1 ............ Suggest replacement.
Wire lead conductors
exposed ................ B .. Require repair or replacement.
Wire lead corroded ...... A .. Require repair or replacement.
Wire lead open .......... A .. Require repair or replacement.
Wire lead shorted ....... A .. Require repair or replacement.
( 1) - Determine cause and correct prior to repair or
replacement of part.
( 2) - Check fan motor/controls. Inoperative includes
intermittent operation or out of OEM specification.
\
\
\
\
\
\
\
WATER PUMPS (NON-ELECTRIC)
WATER PUMP (NON-ELECTRIC) INSPECTION \
\
\
\
\
\
\
Condition Code Procedure
Attaching hardware
broken ................. A ... Require repair or replacement
of hardware.
Attaching hardware
corroded ............... A ... Require repair or replacement
of hardware.
Attaching hardware
missing ................ C .......... Require replacement of
hardware.
Attaching hardware not
functioning ............ A ... Require repair or replacement
of hardware.
Corrosion (internal) is
excessive, affecting
performance ............ A ............ Require replacement.
Corrosion (internal) is
excessive, not affecting
performance ............ 2 . Suggest cooling system service.
Inoperative ............. A ........ ( 1) Require replacement.
Leaking ................. A ............ Require replacement.
Noisy ................... A ............ Require replacement.
Rotation incorrect for
application ............ B .. Require repair or replacement.
Shaft bent .............. A ............ Require replacement.
( 1) - Inoperative includes intermittent operation or out of
OEM specification.
\
\
\
\
\
\
\
WIRING HARNESSES AND CONNECTORS