width MITSUBISHI SPYDER 1990 Service Owner's Guide
[x] Cancel search | Manufacturer: MITSUBISHI, Model Year: 1990, Model line: SPYDER, Model: MITSUBISHI SPYDER 1990Pages: 2103, PDF Size: 68.98 MB
Page 1520 of 2103

F R O N T Drive Shaft
561
Stopper
Adjusting bolt
0 0 0 0 3 4 2 0
protruding portion
0 0 0 0 3 4 2 1
0 0 0 0 3 4 2 2(3)
the ajustingbolt of the special tool to adjust the
opening dimension (W) to the standard value.
Standard
2.9 mm in.)
more than 2.9 mm in.)>
Screw in the adjusting bolt.
Loosen the adjusting bolt.
NOTE
(1) The dimension (W) is adjusted by approx. 0.7 mm
in.) per one turn.
(2) Do not turn the adjusting bolt more
one turn.
(4) Place the boot band (small) along the protrudin g
and install it so that there is some (A)
the other side. . .
(5) ‘Use the special tool to crimp the B.J. boot
Caution
(1) Hold the drive shaft perpendicularly, and use t he
special tool to crimp the securely.
, (2) Crimp the B.J. boot band until the special to ol
t o u c h e s t h e s t o p p e r .
(6) Check that the crimped width (B) ‘is the
value.
Standard value (B): 2.4 2.8 mm in.)
more than 2.8 mm
Readjust the dimension to the
value calculated by the
and repeat step (5).
5.5 mm in.)
Example: If (B) mm in.), (W) is 2.8
mm
in.).
less than 2.4
Remove the ‘boot band,readjust
dimension (W) of step (3)
calculated by the following equation,
a new B.J. band to
5.5 mm in.)
Example: If is 2.3 is
3.2 m m
TSB Revision
Page 1521 of 2103

B.J.
FRONT AXLE Drive Shaft
(7) Check that the B.J. boot band is secured correc tly.
the band is secured incorrectly, repeat steps (4) to (6)
to replace it.
(8) Apply the specified amount of grease to the -bo ot.
Specified grease: Repair kit grease
Engine 110 oz.)
Engine (Turbo) and’ 130
(4.59 oz.)
(9) Install the B.J. boot to adjust the clearance ( C) between
the B.J. boot end and the stepped
of the B.J.
housing is within the standard
Standard value (C): 0.1 1.55 mm
(lO)Adjust the opening dimension the standard
as mentioned at the step (3).
Standard value (W): 3.2 mm
the B.J. boot band (large) along the protruding
portion, and install it so that there is
clearance
(D) along the other side.
the special tool to crimp the B.J. boot band (larg e)
in the same way as the step (5). , ,
that the crimped width (E) is within the standard
value.
Standard value (E): 2.4 2.8 mm in.)
Readjust the dimension
of step to
the value calculated by the equation,
and repeat step (12).
5.8 mm in.)
Example: If (E) is 2.9 mm in.), is 2.9
mm
in.).
less than 2.4 mm in.)>
Remove the B.J. boot band, readjust the
dimension (W) of step (10) to the value
calculated by the following equation, and use
a new B.J. boot band to repeat steps (11) to
5.8 mm in.)
Example: If (E) is 2.3 mm in.), is 3.5
mm
in.).
that the boot band is secured correctly. If the ba nd
is secured incorrectly, repeat steps (11) to (13) t o replace
it.
TSB Revision
Page 1530 of 2103

FRONT AXLE Drive Shaft
0 0 0 0 3 4 2 1
0 0 0 0 3 4 2 2
0 0 0 0 3 4 2 3 (5) Use the special tool
crimp the B.J. boot band
Caution
(1) Hold the drive and use the
special tool to crimp the B.J.
(2) Crimp the B.J. boot special tool
‘touches the stopper.
(6) Check that the crimped width (B) within the stand&d
value.
Standard value (B): 2.4 2.8 in.)
than 2.8 mm
Readjust the dimension of the
value calculated by the
and repeat step (5).
5.5 mm in.)
Example: If (B) is 2.9 mm in.), is 2.6
mm
in.).
R e m o v e t h e B . J . b o o t
d i m e n s i o n ( W ) o f s t e p
calculated by the following
a new B.J. boot band to to
(5). 5.5 mm in.)
Example: If is 2.3 is
3.2 mm
in.).
(7) Check that the B.J. boot is secured If,
the band is secured incorrectly, repeat steps (4) t o (6)
to replace it.
(8) Apply the specified amount ‘of
the
Specified grease: Repair 95 ‘oz.) ,
(9) Install the B.J. boot to adjust the clearance ( C)
the B.J. boot end and the stepped of B.J.
housing is within the standard
value (C): 0.1 1.55 mm in.)
(lO)Adjust the opening dimension to the standard value
as mentioned at the step (3).
Standard value (W): 3.2 mm
TSB Revision
Page 1531 of 2103

F R O N T A X L E __ ,
Protrudingportion
B.J. boot band
the B.J. boot band (large) along, the
portion, and install it so that,, there is
the other side.
the special tool to crimp the B.J.
in the same way as the step
I
section
Bearing
that the crimped width (E) is within the
value.
Standard value (E): 2.4 2.8
the value calculated equation,’
and repeat step (12).
5.8 mm in.)
Example: If (E) is 2.9 mm in.), is 2.9
mm
in.):
Remove the B.J. boot band, readjust the
dimension (W) of step (10) to the value
calculated by equation, and use
a new B.J. boot band to repeat steps (11) to.
5.8 mm in.)
Example: If (E) is 2.3 is 3.5
mm
in.).
that the boot band is correctly.
is secured incorrectly, repeat steps (13) to replace
it.
SPIDER ASSEMBLY’ INSTALLATION
Install the spider assembly to the shaft from the d irection
of the
s e c t i o n .
CENTER BEARING INSTALLATION