bonnet RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide TWINGO 2009 2.G RENAULT RENAULT https://www.carmanualsonline.info/img/7/1710/w960_1710-0.png RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide

Page 134 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-17
TOP AND FRONT OF ENGINE
Accessories belt: Removal - Refitting
K4M
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A,

Page 135 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-18
TOP AND FRONT OF ENGINE
Accessories belt: Removal - Refitting
K4M
11A
II -  REMOVAL OPERATION
aTurn the accessories belt tensioning roller clockwise
using a 16 mm spanner (5) .
aRemove the acce

Page 142 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-25
TOP AND FRONT OF ENGINE
Crankshaft accessories pulley: Removal - Refitting
K4M
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and li

Page 143 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-26
TOP AND FRONT OF ENGINE
Crankshaft accessories pulley: Removal - Refitting
K4M
11A
aUse a brush to remove any deposits from the crank-
shaft accessories pulley V grooves.
II -  REFITTING OPERAT

Page 170 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-53
TOP AND FRONT OF ENGINE
Timing belt: Removal - Refitting
K4M
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifti

Page 182 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-65
TOP AND FRONT OF ENGINE
Timing belt: Removal - Refitting
K4M
11A
-the bonnet catch (see Bonnet lock: Removal -
Refitting) (52A, Non-side opening element mecha-
nisms),
-the headlights (see Halo

Page 193 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-76
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
K4M
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lift

Page 198 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-81
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
K4M
11A
-the front upper cross member (see Front upper
cross member: Removal - Refitting) (42A, Upper
front structure),
-the bonnet cat

Page 227 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-110
TOP AND FRONT OF ENGINE
Camshaft: Removal - Refitting
K4M
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting

Page 230 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals User Guide 11A-113
TOP AND FRONT OF ENGINE
Camshaft: Removal - Refitting
K4M
11A
-the camshaft seals on the timing end (see 11A,
Top and front of engine, Camshaft seal, timing
end: Removal - Refitting, page 11A-
Page:   < prev 1-10 11-20 21-30 31-40 next >