torque RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual TWINGO 2009 2.G RENAULT RENAULT https://www.carmanualsonline.info/img/7/1710/w960_1710-0.png RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual

Page 550 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-40
COOLING
Water chamber: Removal - Refitting
D4F, and 772 – D7F
19A
PARTS AND CONSUMABLES FOR THE 
REPAIR WORK
aPart always to be replaced:
-water chamber seal.
REMOVAL
I - REMOVAL PREPARATION

Page 552 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-42
COOLING
Water chamber: Removal - Refitting
K9K
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).

Page 555 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-45
COOLING
Water chamber: Removal - Refitting
K9K
19A
II -  REFITTING OPERATION FOR PART 
CONCERNED
aRefit the thermostat to the water chamber.
aRefit:
-a new water chamber seal,
-the water chambe

Page 556 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-46
COOLING
Water chamber: Removal - Refitting
D4F, and 780 or 782
19A
REMOVAL - REFITTING
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and liftin

Page 558 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-48
COOLING
Water chamber: Removal - Refitting
K4M
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).

Page 560 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-50
COOLING
Water chamber: Removal - Refitting
K4M
19A
II -  REFITTING OPERATION
aRefit the coolant outlet unit with a new seal.
aPretighten in order and to torque the water cham-
ber bolts (initia

Page 568 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-58
COOLING
Coolant pump inlet pipe: Removal - Refitting
K9K
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, L

Page 570 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-60
COOLING
Coolant pump inlet pipe: Removal - Refitting
K9K
19A
-the right-hand suspended engine mounting (see
19D, Engine mounting, Right-hand suspended
engine mounting: Removal - Refitting, page

Page 571 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-61
COOLING
Coolant pump inlet pipe: Removal - Refitting
D4F, and 780 or 782
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting)

Page 572 of 652

RENAULT TWINGO 2009 2.G Engine And Peripherals Workshop Manual 19A-62
COOLING
Coolant pump inlet pipe: Removal - Refitting
K4M
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting e