oil RENAULT TWINGO 2009 2.G Transmission Owner's Manual
[x] Cancel search | Manufacturer: RENAULT, Model Year: 2009, Model line: TWINGO, Model: RENAULT TWINGO 2009 2.GPages: 135
Page 61 of 135

21B-1
SEQUENTIAL GEARBOX
Sequential gearbox: Precautions for the repair
D4F, and JH1
21B
I - SEQUENTIAL GEARBOX
II - SEQUENTIAL GEARBOX COMPUTER
To disconnect the computer, switch off the ignition and
wait for 1 minute.
III - ELECTRO-HYDRAULIC UNIT
Discharge the pressure accumulator using the Diag-
nostic tool before any operation on the electro-hy-
draulic unit.
Be careful not to twist the high pressure pipes when re-
moving the electro-hydraulic unit.
IV - GEAR SELECTION SENSOREquipment required
Diagnostic tool
IMPORTANT
Before any operation on the sequential system, dis-
charge the accumulator using the Diagnostic tool.
WARNING
If any operation is carried out on the electro-hydrau-
lic unit, it is essential to clean the unit using a clean-
ing product and compressed air.
Never leave the circuit open and never use a high
pressure cleaner.
WARNING
After the accumulator has been fully filled (15 sec-
onds after the ignition has been switched on): the
oil level is at the MINIMUM mark.
WARNING
To remove the gear selection sensor it is essential
that you shift to first gear before removal.
Page 63 of 135

21B-3
SEQUENTIAL GEARBOX
Sequential gearbox oil: Draining - Filling
JH1
21B
Oil capacity
DRAINING
I - DRAINING PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
aRemove:
-the engine undertray bolts,
-the engine undertray.
II - DRAINING OPERATION
aFit a oil recovery tray under the gearbox.aRemove:
-the gearbox drain plug (1) using the tool (Mot.
1018),
-the drain plug seal.
aLet the oil run into the oil recovery tray.
FILLING
I - FILLING PREPARATION OPERATION
aAlways replace the manual gearbox drain plug seal. Special tooling required
Mot. 10188 mm square engine drain
plug spanner.
Equipment required
oil recovery tray
Tightening torquesm
drain plug25 N.m
Gearbox type Oil capacity (in litres)
JH1 2.8
JA32.8
JA52.5
18749
Page 64 of 135

21B-4
SEQUENTIAL GEARBOX
Sequential gearbox oil: Draining - Filling
JH1
21B
aPosition the slot (2) of the new seal towards the
drain plug.
aRefit the drain plug fitted with its new seal.
aTorque tighten the drain plug (25 N.m).
II - FILLING OPERATION
aRemove the filler plug (3) .aFill the gearbox using a syringe containing recom-
mended oil (see 21A, Manual gearbox, Manual
gearbox oil: Specifications, page 21A-1) (Techni-
cal Note 6012A, 04A, Lubricants) until the oil over-
flows out of the filler cap hole.
aRefit the filler plug.
III - FINAL OPERATION
aWipe any oil run-off with a cloth.
aRemove the oil recovery tray.
aRefit the engine undertray.
113764
18749
92081
Page 65 of 135

21B-5
SEQUENTIAL GEARBOX
Pressure accumulator: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection).
aDetach from the petrol injection computer mounting:
-the cooling hose,
-the sequential gearbox computer wiring harness,
-the petrol injection computer wiring harness,
-the battery wiring harness.aRemove:
-the petrol injection computer mounting nut (1) ,
-the engine wiring harness nut (2) from the petrol in-
jection computer mounting,
-the petrol injection computer mounting bolts (3) .
aRemove the engine wiring harness from the petrol
injection computer mounting.
aRemove the petrol injection computer mounting. Special tooling required
Mot. 445Oil filter strap wrench.
Equipment required
Diagnostic tool
IMPORTANT
Before carrying out any operation on the sequential
system, discharge the accumulator using the diag-
nostic tool.
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
Note:
To discharge the accumulator and deactivate the
pump assembly pump, (see Fault finding -
Replacement of components) (MR 413, 21B,
Sequential gearbox).
122323
122322
Page 67 of 135

21B-7
SEQUENTIAL GEARBOX
Pressure accumulator: Removal - Refitting
D4F, and JH1
21B
II - OPERATION FOR REMOVAL OF PART
CONCERNED
a
aRemove the pressure accumulator (8) from the actu-
ator module using the (Mot. 445) (9) .
REFITTING
I - REFITTING PREPARATION OPERATION
aIf replacing the pressure accumulator, affix a safety
label to the accumulator.
aIt is essential to replace the pressure accumulator
seal.
II - REFITTING OPERATION FOR PART
CONCERNED
aRefit the pressure accumulator onto the actuator
module using the (Mot. 445).
III - FINAL OPERATION
aClip the pump assembly supply connector onto the
electro-hydraulic unit connector mounting.
aConnect the pump assembly supply connector.aRefit:
-the sequential gearbox lifting eye on the sequential
gearbox,
-the sequential gearbox lifting eye nut,
-the breather pipe on the sequential gearbox.
aAttach the breather pipe:
-to the cooling hose,
-to the sequential gearbox lifting eye.
aFit:
-the petrol injection computer support,
-the engine wiring harness on the petrol injection
computer mounting.
aRefit:
-the petrol injection computer mounting bolts,
-the engine wiring harness nut on the petrol injec-
tion computer mounting,
-the petrol injection computer mounting nut.
aClip onto the petrol injection computer mounting:
-the battery wiring harness,
-the petrol injection computer wiring harness,
-the sequential gearbox computer wiring harness,
-the cooling hose.
aRefit:
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery).
aFill the electric pump assembly reservoir with oil
(see Sequential gearbox oil: Specifications)
(Technical Note 6012, 04A, Lubricants) to between
32 and 38 mm above the MIN mark.
122315
Note:
Prepare for oil to flow out of the electro-hydraulic
unit.
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil level is at the MINIMUM mark.
Page 70 of 135

21B-10
SEQUENTIAL GEARBOX
Pump assembly reservoir: Removal - Refitting
D4F, and JH1
21B
REFITTING
I - REFITTING PREPARATION OPERATION
aIn the event of replacement, refit:
-the low pressure hose,
-the low pressure hose clip.
aIt is essential to replace the pump assembly reser-
voir seal on the pump inlet.
II - REFITTING OPERATION FOR PART
CONCERNED
aRefit:
-the pump assembly reservoir,
-the pump assembly reservoir bolts.
III - FINAL OPERATION
aAssemble:
-the electro-hydraulic unit (see 21B, Sequential
gearbox, Electro-hydraulic unit: Removal - Re-
fitting, page 21B-11) ,
aRemove
-the pump assembly on the electro-hydraulic unit
(see 21B, Sequential gearbox, Pump assembly:
Removal - Refitting, page 21B-18) ,
-the front left-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Exterior protection),
-the left-hand front wheel (see Wheel: Removal -
Refitting) (MR 411, 35A, Wheels and tyres),
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (MR 411,
19D, Engine mounting),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery).aFill the electric pump assembly reservoir with oil
(see Sequential gearbox oil: Specifications)
(Technical Note 6012, 04A, Lubricants) to between
32 and 38 mm above the MIN mark.
aCarry out the necessary operations using the Diag-
nostic tool (see Fault finding - Replacement of
components) (MR 413, 21B, Sequential gearbox). WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil level is at the MINIMUM mark.
Page 77 of 135

21B-17
SEQUENTIAL GEARBOX
Electro-hydraulic unit: Removal - Refitting
D4F, and JH1
21B
aRefit:
-the front left-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Exterior protection),
-the left-hand front wheel (see Wheel: Removal -
Refitting) (MR 411, 35A, Wheels and tyres),
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (MR 411,
19D, Engine mounting).
Refit.
aFit:
-the petrol injection computer support,
-the engine wiring harness on the petrol injection
computer mounting.
aRefit:
-the petrol injection computer mounting bolts,
-the engine wiring harness nut on the petrol injec-
tion computer mounting,
-the petrol injection computer mounting nut.
aClip onto the petrol injection computer mounting:
-the battery wiring harness,
-the petrol injection computer wiring harness,
-the sequential gearbox computer wiring harness,
-the cooling hose.
aRefit:
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery).
aFill the electric pump assembly reservoir with oil
(see Sequential gearbox oil: Specifications)
(Technical Note 6012, 04A, Lubricants) to between
32 and 38 mm above the MIN mark.aIf replacing the electro-hydraulic unit, carry out the
necessary operations using the Diagnostic tool
(see Fault finding - Replacement of components)
(MR 413, 21B, Sequential gearbox).
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil level is at the MINIMUM mark.
Page 79 of 135

21B-19
SEQUENTIAL GEARBOX
Pump assembly: Removal - Refitting
D4F, and JH1
21B
aPosition the (Ms. 583) on the reservoir low pressure
return hose (1) .
aRemove the clip (2) from the reservoir return hose.
aDisconnect the reservoir low pressure return hose
(1) from the actuator module.
aRemove:
-the clutch stay high pressure supply pipe bracket
bolt (3) ,
-the actuator module high pressure supply pipe by
pressing on the unions (4) ,
-the clutch stay high pressure supply pipe by press-
ing on the unions (5) ,
-the pump assembly from the actuator module.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
aFit:
-the clutch stay high pressure supply pipe,
-the actuator module high pressure supply pipe.
aFit the high pressure pipe unions, without tightening
them.aConnect the reservoir low pressure return hose to
the actuator module.
aRefit the reservoir return hose clip on the actuator
module.
aRemove the (Ms. 583) from the reservoir low pres-
sure return hose.
aClip the pump assembly supply connector onto the
electro-hydraulic unit connector mounting.
aConnect the pump assembly supply connector.
II - FINAL OPERATION
aRefit the electro-hydraulic unit (see 21B, Sequential
gearbox, Electro-hydraulic unit: Removal - Refit-
ting, page 21B-11) .
aTorque tighten the high pressure pipe unions (14
N.m).
aRefit:
-the clutch stay high pressure supply pipe bracket
bolt,
-the front wheel arch liners (see Front wheel arch
liner: Removal - Refitting) (55A, Exterior protec-
tion),
-the front wheels (see Wheel: Removal - Refitting)
(35A, Wheels and tyres),
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (19D, En-
gine mounting),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (17B, Petrol in-
jection),
-the battery tray (see Battery tray: Removal - Re-
fitting) (80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery (see Battery: Removal - Refitting)
(80A, Battery).
aFill the electric pump assembly reservoir with oil
(see Sequential gearbox oil: Specifications)
(Technical Note 6012, 04A, Lubricants) to between
32 and 38 mm above the MIN mark.
122171
Note:
Prepare for oil to flow out of the electro-hydraulic
unit.
WARNING
After the accumulator has been fully filled (15
seconds after the ignition has been switched on):
the oil level is at the MINIMUM mark.
Page 84 of 135

21B-24
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
1 - Removing engagement solenoid valve 1,
selection solenoid valve 3 and selection solenoid
valve 4
a
aRemove the solenoid valve affected, following the
correct removal order for the solenoid valves:
-the clutch solenoid valve (13) ,
-selection solenoid valve 4 (14) ,
-selection solenoid valve 3 (15) ,
-engagement solenoid valve 1 (16) .2 - Removing engagement solenoid valve 2
aDisconnect the following connectors :
- (17) from the solenoid valve unit pressure sensor,
- (18) from engagement solenoid valve 2.
aRemove the actuator module wiring harness.
122172
Note:
Prepare for oil to flow out of the electro-hydraulic
unit.
122320
Page 85 of 135

21B-25
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
a
aRemove:
-the bolts (19) from engagement solenoid valve 2,
-engagement solenoid valve 2.
REFITTING
I - REFITTING PREPARATION OPERATION
aIt is essential to replace the engagement or clutch
solenoid valve seal.
II - REFITTING OPERATION FOR PART
CONCERNED
1 - Refitting engagement solenoid valve 1,
selection solenoid valve 3 and selection solenoid
valve 4
aRefit the affected solenoid valve, following the cor-
rect removal order for the solenoid valves:
-engagement solenoid valve 1 fitted with its new
seal,
-selection solenoid valve 3,
-selection solenoid valve 4,
-the clutch solenoid valve fitted with its new seal.2 - Refitting engagement solenoid valve 2
aRefit:
-engagement solenoid valve 2 fitted with its new
seal,
-engagement solenoid valve 2 bolts.
aConnect the connectors:
-to engagement solenoid valve 2,
-to the solenoid valve unit pressure sensor.
III - FINAL OPERATION
1 - Refitting engagement solenoid valve 1,
selection solenoid valve 3 and selection solenoid
valve 4
aFit the electro-hydraulic unit connector mounting.
aRefit the electro-hydraulic unit connector mounting
bolts.
aClip the pump assembly supply connector onto the
electro-hydraulic unit connector mounting.
aConnect the pump assembly supply connector.
aRefit:
-the sequential gearbox lifting eye on the sequential
gearbox,
-the sequential gearbox lifting eye nut,
-the breather pipe on the sequential gearbox.
aAttach the breather pipe:
-to the cooling hose,
-to the sequential gearbox lifting eye.
2 - Refitting engagement solenoid valve 2
aFit the left-hand suspended engine mounting to the
body.
aFit the left-hand suspended engine mounting bolts
without tightening them.
aTorque tighten the left-hand suspended engine
mounting bolts (21 N.m).
aRaise the sequential gearbox to its original position.
aFit the left-hand suspended engine mounting rubber
pad.
aFit the left-hand suspended engine mounting rubber
pad bolts without tightening them.
aTorque tighten the left-hand suspended engine
mounting rubber pad bolts ( 62 N.m).
122319
Note:
Prepare for oil to flow out of the electro-hydraulic
unit.