heating RENAULT TWINGO 2009 2.G Transmission Workshop Manual
[x] Cancel search | Manufacturer: RENAULT, Model Year: 2009, Model line: TWINGO, Model: RENAULT TWINGO 2009 2.GPages: 135
Page 102 of 135
21B-42
SEQUENTIAL GEARBOX
Sequential gearbox: Removal - Refitting
D4F, and JH1
21B
aRemove:
-the air conditioning condenser inlet pipe bolt (7) ,
-the air conditioning condenser inlet pipe (8) .aRemove the cooling radiator bottom hose clip (9) us-
ing the (Mot. 1448).
aDisconnect the cooling radiator bottom hose (10)
from the coolant pump inlet pipe.
aRemove the « cooling radiator - cooling radiator
hose » assembly from the front axle sub-frame.
aRemove the « cooling radiator - cooling radiator
hose - air conditioning condenser » assembly from
the front axle sub-frame. AIR CONDITIONING or CLIMATE CONTROL
122156
122152
WARNING
Prepare for the flow of fluid, and protect the sur-
rounding components.
STANDARD HEATING
AIR CONDITIONING or CLIMATE CONTROL
Page 105 of 135
21B-45
SEQUENTIAL GEARBOX
Sequential gearbox: Removal - Refitting
D4F, and JH1
21B
If replacing the sequential gearbox
aRefit:
-the sequential gearbox engine speed sensor (see
21B, Sequential gearbox, Sequential gearbox
engine speed sensor: Removal - Refitting, page
21B-38) ,
-the reverse gear switch (17) .
II - REFITTING OPERATION FOR PART
CONCERNED
aFit the sequential gearbox to the engine.
aFit the sequential gearbox studs without tightening
them.
aTorque tighten the sequential gearbox studs (7
Nm) using a roller-type stud removal tool.
aFit without tightening:
-the sequential gearbox bolts,
-the sequential gearbox nuts.
aTighten to torque:
-the sequential gearbox bolts (44 Nm),
-the sequential gearbox nuts (44 Nm).aRefit:
-the flywheel protection plate,
-the flywheel protection plate bolt.
aFit the flywheel protection plate bolts (18) without
tightening them.
aTorque tighten the flywheel protection plate bolts
(18) (44 Nm).
III - FINAL OPERATION
aAttach the engine wiring harness neck to the se-
quential gearbox.
aRefit the electro-hydraulic unit (see 21B, Sequential
gearbox, Electro-hydraulic unit: Removal - Refit-
ting, page 21B-11) .
aFit the « engine - sequential gearbox » assembly to
the front axle sub-frame using a workshop hoist
and a load balancer in its original position.
aRefit the « cooling radiator - cooling radiator hose »
assembly to the front axle sub-frame.
122163
122158
STANDARD HEATING