RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual TWINGO RS 2009 2.G RENAULT RENAULT https://www.carmanualsonline.info/img/7/1710/w960_1710-0.png RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual
Trending: relay, wipers, brake, wheel, open bonnet, checking oil, clock setting

Page 181 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-64
TOP AND FRONT OF ENGINE
Timing belt: Removal - Refitting
K4M
11A
aRefit the lower timing cover flap, checking that the
locating pin (34) fits properly in the notch (35) .
III - FINAL OPERATION

Page 182 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-65
TOP AND FRONT OF ENGINE
Timing belt: Removal - Refitting
K4M
11A
-the bonnet catch (see Bonnet lock: Removal -
Refitting) (52A, Non-side opening element mecha-
nisms),
-the headlights (see Halo

Page 183 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-66
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D7F
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aDisconnect the battery ( (see Battery: Removal -
Refitting) ).
aRemove:
-the intake

Page 184 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-67
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
C44, and K9K
11A
PARTS AND CONSUMABLES FOR THE 
REPAIR WORK
aParts always to be replaced :
-axle sub-frame bolts,
-air inlet metal tube

Page 185 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-68
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
C44, and K9K
11A
aApply four beads (2) of SILICONE ADHESIVE
SEALANT, 2 mm in diameter.
II -  REFITTING OPERATION FOR PART 
CONCERNED
aR

Page 186 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-69
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 772
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aDisconnect the battery (see Battery: Removal - Re-
fitting) (80A, Battery).

Page 187 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-70
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 772
11A
II -  REFITTING OPERATION FOR PART 
CONCERNED
aApply a bead (1) of SILICONE ADHESIVE SEAL-
ANT  (see Vehicle: Parts an

Page 188 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-71
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 780 or 782 or 784
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aDisconnect the battery (see Battery: Removal - Re-
fitting) (

Page 189 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-72
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 780 or 782 or 784
11A
a
aRemove the turbocharger outlet air pipe bolt (3) on
the throttle valve.
aMove the turbocharger outlet

Page 190 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 11A-73
TOP AND FRONT OF ENGINE
Rocker cover: Removal - Refitting
D4F, and 780 or 782 or 784
11A
aDisconnect the oil vapour rebreathing circuit unions 
(9) .
-on the inlet distributor,
-on the air filt
Trending: timing belt, cooling, battery, wheel, charging, clock, Clutch