engine RENAULT TWINGO RS 2009 2.G Transmission Owner's Guide

RENAULT TWINGO RS 2009 2.G Transmission Owner's Guide TWINGO RS 2009 2.G RENAULT RENAULT https://www.carmanualsonline.info/img/7/1727/w960_1727-0.png RENAULT TWINGO RS 2009 2.G Transmission Owner's Guide

Page 72 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-12
SEQUENTIAL GEARBOX
Electro-hydraulic unit: Removal - Refitting
D4F, and JH1
21B
aRemove:
-the petrol injection computer mounting nut (1) ,
-the engine wiring harness nut (2) from the petrol in-

Page 73 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-13
SEQUENTIAL GEARBOX
Electro-hydraulic unit: Removal - Refitting
D4F, and JH1
21B
aMark the positions:
-of the left-hand suspended engine mounting on the
body,
-of the rubber pad on the left-hand

Page 76 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-16
SEQUENTIAL GEARBOX
Electro-hydraulic unit: Removal - Refitting
D4F, and JH1
21B
aIt is essential to replace the electro-hydraulic unit
seal.
aPlace the actuator module selector shaft in a raise

Page 77 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-17
SEQUENTIAL GEARBOX
Electro-hydraulic unit: Removal - Refitting
D4F, and JH1
21B
aRefit:
-the front left-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Ext

Page 78 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-18
SEQUENTIAL GEARBOX
Pump assembly: Removal - Refitting
D4F, and JH1
21B
The electro-hydraulic unit comprises the pump assem-
bly and the actuator module.
REMOVAL
I - REMOVAL PREPARATION OPERATIO

Page 79 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-19
SEQUENTIAL GEARBOX
Pump assembly: Removal - Refitting
D4F, and JH1
21B
aPosition the (Ms. 583) on the reservoir low pressure
return hose (1) .
aRemove the clip (2) from the reservoir return hos

Page 81 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-21
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR

Page 82 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-22
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
-the engine wiring harness nut (2) from the petrol in-
jection computer mounting,
-the petrol injection computer mountin

Page 83 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-23
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
2 -  Removing engagement solenoid valve 2
aRemove:
-the left-hand front wheel (see Wheel: Removal -
Refitting) (MR 411,

Page 85 of 135

RENAULT TWINGO RS 2009 2.G Transmission Owners Guide 21B-25
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
a
aRemove:
-the bolts (19) from engagement solenoid valve 2,
-engagement solenoid valve 2.
REFITTING
I - REFITTING PREPA