charging SSANGYONG KORANDO 2013 Service Manual

SSANGYONG KORANDO 2013 Service Manual KORANDO 2013 SSANGYONG SSANGYONG https://www.carmanualsonline.info/img/67/57503/w960_57503-0.png SSANGYONG KORANDO 2013 Service Manual

Page 286 of 1336

SSANGYONG KORANDO 2013  Service Manual Maximizes the intake air charging efficiency (Approx. 15%) -Optimizes the exhaust gas flow rate by controlling the vanes inside the turbine housing with the E-
Actuator. 1.
(2) E-Actuator (Electric-Ac

Page 311 of 1336

SSANGYONG KORANDO 2013  Service Manual 0000-00
(1) Checking
Using battery tester
PASS (11.0 V or more): Explain to the customer that the battery is reusable.
Need to be charged (9.0 to 11.0 V): Charge the battery with a charger and reinsta

Page 315 of 1336

SSANGYONG KORANDO 2013  Service Manual 0000-00
Alternator (140 A)Alternator (120 A)
3) Charging
The alternator uses a new regulator which has three diodes. It consists of the delta stator, rectifier bridge, 
slip ring and brush.
Charging t

Page 316 of 1336

SSANGYONG KORANDO 2013  Service Manual 2. CHARGING OPERATION
1) With Smart Key System

Page 532 of 1336

SSANGYONG KORANDO 2013  Service Manual 1452-01
Using battery tester
PASS (11.0 V or more): Explain to the customer that the battery is reusable.
Need to be charged (9.0 to 11.0 V): Charge the battery with a charger and reinstall it. Explai

Page 536 of 1336

SSANGYONG KORANDO 2013  Service Manual 1452-01
2. CHARGING OPERATION
1) Vehicle without Smart key system

Page 602 of 1336

SSANGYONG KORANDO 2013  Service Manual 4. INSPECTION - CHARGING CURRENT
Perform the basic inspection. -
Setting up the testers
Preparation
Set up the ammeter and voltmeter as 
shown in the figure. 1.
Make sure to set up the tester while ke

Page 607 of 1336

SSANGYONG KORANDO 2013  Service Manual 0000-00
Specified 
valueover 11V: Normal
9 ~ 11V: Charging required
below: 9V: Over discharged, 
battery replacement required
7. INSPECTION - BATTERY
Perform the basic inspection (all electric devices

Page 608 of 1336

SSANGYONG KORANDO 2013  Service Manual 2) Voltage Check (with load)
1Push the load switch to ON (to arrow 
direction) direction for less than 5 seconds. 1.
Read the measurement. 2.
Specified 
value7 ~ 9V (Red): Over discharged 
or faulty
9

Page 611 of 1336

SSANGYONG KORANDO 2013  Service Manual 0000-00
2. OPERATING PROCESS
System diagram
Operation
EEM monitors the electric loads and battery conditions and controls the voltage to improve the fuel 
economy and battery charging efficiency.
SOC)
Page:   1-10 11-20 next >