4A-14 HYDRAULIC BRAKES
LCRV SETTING METHOD
1. LCRV setting should be performed with unladen vehiclecondition.
2. Install the connecting rod (a) to the No.1 hole.
Tightening Torque 14 - 18 Nm
3. Adjust the clearance “X” to be 0 mm and tighten the bolt (c) using the lock nut (b).
Tightening Torque 14 - 18 Nm
4. Remove the connecting rod (a) from the No.1 hole and reinstall it to the No. 2 hole.
5. Place alignment marks between the lock nut (b) and adjusting screw (c) after the valve setting.
SECTION 4B
MASTER CYLINDER
Specifications . . . . . . . . . . . . . . . . . . . . . . . . 4B-1Fastener Tightening Specifications . . . . . . . . . 4B-1
Maintenance and Repair . . . . . . . . . . . . . . . 4B-2 TABLE OF CONTENTS
SPECIFICATIONS
FASTENER TIGHTENING SPECIFICATIONS
Application
Master Cylinder Nut Booster Nut
N
m
14 - 22 8 - 18
On-Vehicle Service . . . . . . . . . . . . . . . . . . . . . 4B-2
Booster & Brake Master Cylinder . . . . . . . . . . 4B-2
4B-2 MASTER CYLINDER
1 Nut .......................................................14-22 Nm
2 Washer
3 Master Cylinder Assembly
4 Oil Level Sensor
5 Check V alve
6 Booster
7 Clevis Pin
8 Snap Pin9 Seal
10 Spacer 11 Nut ......................................................... 8-18 Nm
12 Front Tube (LH)
13 Front Tube (RH)
14 Rear Tube
15 1st Tube (Primary)
16 2nd Tube (Secondary)
MANDO
PBR
MAINTENANCE AND REPAIR
ON-VEHICLE SERVICE
BOOSTER AND BRAKE MASTER CYLINDER