ignition SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual SWIFT 2000 1.G SUZUKI SUZUKI https://www.carmanualsonline.info/img/20/7606/w960_7606-0.png SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual

Page 479 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual 6-110 ENGINE GENERAL INFORMATION AND DIAGNOSIS
DTC P1500 ENGINE STARTER SIGNAL CIRCUIT MALFUNCTION
CIRCUIT DESCRIPTION
DTC CONFIRMATION PROCEDURE
1) Turn ignition switch OFF.
2) Clear DTC with ignitio

Page 480 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual ENGINE GENERAL INFORMATION AND DIAGNOSIS 6-111
DTC P1510 ECM BACK-UP POWER SUPPLY MALFUNCTION
WIRING DIAGRAM / CIRCUIT DESCRIPTION
Battery voltage is supplied so that diagnostic trouble code memory, v

Page 481 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual 6-112 ENGINE GENERAL INFORMATION AND DIAGNOSIS
DTC P1600 SERIAL COMMUNICATION PROBLEM BETWEEN ECM AND TCM
WIRING DIAGRAM
CIRCUIT DESCRIPTION
The serial data line is pulled up to about 12 V by ECM and

Page 482 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual ENGINE GENERAL INFORMATION AND DIAGNOSIS 6-113
Fig. 1 for Step 2
Fig. 2 for Step 43 Is it about 12 V at Step 2?“BLK/WHT” wire open, 
poor C44-20 connection 
or TCM power or ground 
circuit open. I

Page 483 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual 6-114 ENGINE GENERAL INFORMATION AND DIAGNOSIS
DTC P1717 A/T DRIVE RANGE (PARK/NEUTRAL POSITION) SIGNAL CIRCUIT 
MALFUNCTION
WIRING DIAGRAM / CIRCUIT DESCRIPTION
DTC CONFIRMATION PROCEDURE
1) Turn ign

Page 484 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual ENGINE GENERAL INFORMATION AND DIAGNOSIS 6-115
INSPECTION
Fig. 1 for Step 3Step Action Yes No
1Was “ENGINE DIAG. FLOW TABLE” per-
formed?Go to Step 2. Go to “ENGINE DIAG. 
FLOW TABLE”.
2 Is SU

Page 489 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual 6-120 ENGINE GENERAL INFORMATION AND DIAGNOSIS
TABLE B-3 FUEL PRESSURE CHECK
WIRING DIAGRAM
INSPECTION
1. Injector (A) : Fuel pressure gauge
2. Delivery pipe (B) : Hose
3. Fuel pump (C) : Attachment
S

Page 492 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual ENGINE GENERAL INFORMATION AND DIAGNOSIS 6-123
Fig. 1 for Step 105 Check A/C (input) signal circuit referring to Step 
1 of Table B-5 A/C Signal Circuit Check, if 
equipped. (A/C signal can be also ch

Page 494 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual ENGINE GENERAL INFORMATION AND DIAGNOSIS 6-125
INSPECTION
Fig. 1 for Step 1Step Action Yes No
1 Check evaporator temp. sensor resistance.
1) Disconnect ECM connectors with ignition 
switch at OFF posi

Page 495 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Workshop Manual 6-126 ENGINE GENERAL INFORMATION AND DIAGNOSIS
TABLE B-6 ELECTRIC LOAD SIGNAL CIRCUIT CHECK
INSPECTION
1. Blower fan motor 3. Rear defogger 5. To A/C switch
2. Blower fan switch 4. Position lamp
[A] :