fuel SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF SWIFT 2000 1.G SUZUKI SUZUKI https://www.carmanualsonline.info/img/20/7606/w960_7606-0.png SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF

Page 518 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF ENGINE MECHANICAL (M13 ENGINE) 6A1-17
4) Remove air cleaner assembly, resonator and hoses by refer-
ring to “AIR CLEANER ASSEMBLY AND RESONATOR”.
5) Disconnect the following electric lead wires :

Page 519 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF 6A1-18 ENGINE MECHANICAL (M13 ENGINE)
11) Remove intake manifold (1) with throttle body (2) and EGR
pipe (3) from cylinder head, and then its gasket.
INSTALLATION
Reverse removal procedure for install

Page 545 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF 6A1-44 ENGINE MECHANICAL (M13 ENGINE)
VALVES AND CYLINDER HEAD
REMOVAL
1) Relieve fuel pressure according to procedure described in
Section 6.
2) Disconnect negative cable at battery.
3) Drain engine

Page 546 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF ENGINE MECHANICAL (M13 ENGINE) 6A1-45
4) Drain coolant by loosening drain plug (1).
5) Remove air cleaner assembly (1), resonator and hoses (2)
referring to “AIR CLEANER ASSEMBLY AND RESONA-
TOR”.

Page 557 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF 6A1-56 ENGINE MECHANICAL (M13 ENGINE)
5) Install cylinder head to cylinder block.
Apply engine oil to new cylinder head bolts and tighten them
gradually as follows.
a) Tighten cylinder head bolts (“

Page 558 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF ENGINE MECHANICAL (M13 ENGINE) 6A1-57
PISTONS, PISTON RINGS, CONNECTING RODS AND CYLINDERS
REMOVAL
1) Relieve fuel pressure according to procedure described in
Section 6.
2) Disconnect negative cable

Page 567 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF 6A1-66 ENGINE MECHANICAL (M13 ENGINE)
6) Reverse removal procedure for installation as previously out-
lined.
7) Adjust water pump belt tension referring to Section 6B.
8) Adjust A/C compressor belt t

Page 569 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF 6A1-68 ENGINE MECHANICAL (M13 ENGINE)
UNIT REPAIR OVERHAUL
ENGINE ASSEMBLY
REMOVAL
1) Relieve fuel pressure according to procedure described in
Section 6.
2) Disconnect negative and positive cables at

Page 570 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF ENGINE MECHANICAL (M13 ENGINE) 6A1-69
11) Disconnect the following electric lead wires:
TP sensor (1)
MAP sensor (2)
ECT sensor
CMP sensor
CKP sensor
Knock sensor
Heated oxygen sensors
EGR val

Page 573 of 698

SUZUKI SWIFT 2000 1.G RG413 Service Manual PDF 6A1-72 ENGINE MECHANICAL (M13 ENGINE)
6) Install generator referring to Section 6H.
7) For 4WD vehicle, install propeller shaft referring to Section
4B.
8) Connect drive shaft joints referring to Sect