TOYOTA SEQUOIA 2001 Service Repair Manual

TOYOTA SEQUOIA 2001 Service Repair Manual SEQUOIA 2001 TOYOTA TOYOTA https://www.carmanualsonline.info/img/14/57465/w960_57465-0.png TOYOTA SEQUOIA 2001 Service Repair Manual
Trending: low oil pressure, navigation system, ground clearance, PCV, diagnostic menu, fog light, coolant temperature

Page 481 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual A23556
8 J17
J/CECM Combination Meter
SPD
E5 G±O
B G±O 25
C5
B
± DIAGNOSTICSENGINE
DI±279
473 Author: Date:
2005 SEQUOIA   (RM1146U)
MONITOR STRATEGY
Related DTCsP0500Vehicle speed sensor ºAº

Page 482 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual DI±280
± DIAGNOSTICSENGINE
474 Author: Date:
2005 SEQUOIA   (RM1146U)
INSPECTION PROCEDURE
HINT:
Read freeze frame data using the hand-held tester. Freeze frame data records the engine conditions

Page 483 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual B17411
SPD(+) E6
E5
E1
AT7809
4 to 6 V
Turn the Wheel
3
2
1
I25536
Component  Side Connector:
Vehicle Speed Sensor
± DIAGNOSTICSENGINE
DI±281
475 Author: Date:
2005 SEQUOIA   (RM1146U)
2 Check vol

Page 484 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual BR3795OK NGClearance
B17411
SPD(+) E5
A23540
Wire Harness Side:
Front View
Combination Meter Connector C5
DI±282
± DIAGNOSTICSENGINE
476 Author: Date:
2005 SEQUOIA   (RM1146U)
4 Check sensor insta

Page 485 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual ± DIAGNOSTICSENGINE
DI±283
477 Author: Date:
2005 SEQUOIA   (RM1146U)
DTC P0504 Brake Switch ºAº/ºBº Correlation
CIRCUIT DESCRIPTION
In addition to turning on the stop lamps, the stop lamp swi

Page 486 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual I18
Ignition 
SW
A23552
ECM
STOPSTP
ALT
BatteryE4
16 G±Y
J/C1 S14 Stop Light SW
2
G±W
BR7
Stop
Light
LH
R8
Stop
Light
RH3
5
8W±R
A W
High 
Mounted
Stop Light
W±B 1L
1 1F
7
F10
Fusible
Link
BlockIn

Page 487 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual ± DIAGNOSTICSENGINE
DI±285
479 Author: Date:
2005 SEQUOIA   (RM1146U)
INSPECTION PROCEDURE
HINT:
Read freeze frame data using the hand-held tester. Freeze frame data records the engine conditions

Page 488 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual B17446
Brake Pedal
DepressedBrake Pedal
Released ON
() ()
ST1±(+)E4
E6
E1(±)
DI±286
± DIAGNOSTICSENGINE
480 Author: Date:
2005 SEQUOIA   (RM1146U)
3 Check STP signal and ST1± voltage.
PREPARATI

Page 489 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual B17447
Wire Harness Side:
Stop Light Switch Connector
S14
ST1±STP
E4
± DIAGNOSTICSENGINE
DI±287
481 Author: Date:
2005 SEQUOIA   (RM1146U)
4 Check harness and connector between ECM and stop light

Page 490 of 4323

TOYOTA SEQUOIA 2001  Service Repair Manual A20823
Idle engine
RPM
Small Target RPM
Actual idle RPMLarge
Learned value 
of the idle speed 
controlMaximum
Minimum
Time 0
Time DI±288
± DIAGNOSTICSENGINE
482 Author: Date:
2005 SEQUOIA   (RM114
Trending: steering wheel, TS pin, radio antenna, OBD port, evaporative emission control system, open gas tank, sensor