JEEP CHEROKEE 1995 Service Repair Manual
Page 1431 of 2198
OUTPUT SHAFT ASSEMBLY
(1) Lubricate output shaft journals, gears and nee-
dle bearings with recommended gear lubricant.
(2) Install third gear and needle bearing on shaft
(Fig. 63)
(3) Install synchro ring on third gear (Fig. 63).
(4) Assemble 1-2 and 3-4 synchro hubs and sleeves
(Fig.74).
(5) Install inserts and springs in synchro sleeves.
Position open ends of springs 180É apart as shown
(Fig. 75).
(6) Install 3-4 synchro hub and sleeve on output
shaft. Press hub onto shaft if necessary.
(7) Install 3-4 synchro hub snap ring (Fig. 76). Use
thickest snap ring that will fit in shaft groove.(8) Verify third gear thrust clearance with feeler
gauge (Fig. 56). Clearance should be 0.10 to 0.25 mm
(0.004 to 0.010 in.).
(9) Lubricate remaining output shaft gears and
bearings with gear lubricant.
(10) Install second gear and needle bearing on
shaft (Fig. 78).
(11) Install synchro ring on second gear (Fig. 78).
(12) Assemble first/reverse hub, insert springs, in-
serts, reverse gear and 1-2 sleeve (Fig. 78).Be sure
spring ends are 180É apart. Note that splines in
hub bore are chamfered on one side. Install
hub so chamfered side faces front of output
shaft.
(13) Press assembled hub and sleeve on output
shaft.
Fig. 73 Installing Reverse Shaft Pin
Fig. 74 Synchro Sleeve And Hub Identification
Fig. 75 Insert Spring Position
Fig. 76 Installing 3-4 Synchro Hub Snap Ring
21 - 54 AX 15 MANUAL TRANSMISSIONJ
Page 1432 of 2198
(14) Install selective snap ring (Fig. 78). Use thick-
est snap ring that will fit in output shaft groove.
(15) Install synchro ring on first gear (Fig. 79).
(16) Install first gear spacer on shaft and against
selective fit snap ring (Fig. 79).
(17) Install first gear and needle bearing (Fig. 79)
on output shaft.
(18) Install locating pin and thrust washer on
shaft (Fig. 79).
(19) Press rear bearing on shaft. Position bearing
snap ring groove so it is closest to end of output
shaft.
(20) Check first and second gear thrust clearance
with feeler gauge (Fig. 62).²First gear clearance should be 0.10 to 0.40 mm
(0.003 to 0.0197 in.)
²Second gear clearance should be 0.10 to 0.30 mm
(0.003 to 0.0118 in.)
(21) Press fifth gear onto output shaft. Then install
select fit snap ring (Fig. 80). Use thickest snap ring
that will fit in shaft groove.
(22) Lubricate input shaft pilot bearing with petro-
leum jelly and install bearing in shaft (Fig. 60).
Fig. 77 Checking Third Gear Clearance
Fig. 78 Second Gear And Synchro Assembly
Fig. 79 First And Fifth Gear Components
Fig. 80 Selecting Fifth Gear Snap Ring
JAX 15 MANUAL TRANSMISSION 21 - 55
Page 1433 of 2198
(23) Install input shaft on output shaft (Fig. 59).
Be sure output shaft hub is fully seated in pilot bear-
ing.
OUTPUT SHAFT AND CLUSTER GEAR
INSTALLATION
(1) Mount intermediate plate in vise (Fig. 24).
(2) Lubricate cluster gear journal and rear bearing
with petroleum jelly or gear lubricant.
(3) Install cluster gear rear bearing in intermedi-
ate plate (Fig. 81). Be sure snap ring groove in bear-
ing is rearward as shown.
(4) Start cluster gear into bearing (Fig. 57). Then
hold bearing and push gear into place. Use plastic or
rawhide mallet to seat bearing if necessary.
(5) Start output shaft rear bearing in intermediate
plate. Push shaft rearward and tap intermediate
plate with mallet to seat bearing.
(6) Install snap rings on cluster and output shaft
rearbearings only (Fig. 82). Do not install front
bearing snap rings at this time.
(7) Install reverse idler gear and shaft (Fig. 83).(8) Position rear bearing retainer over output shaft
and rear bearing.Be sure bearing retainer tab is
engaged in reverse idler shaft notch (Fig. 84).
(9) Install and tighten rear bearing retainer bolts
to 18 Nzm (13 ft-lbs).
SHIFT RAIL AND FORK INSTALLATION
The shift rail interlock pins, balls and plugs must
be installed in the correct sequence for proper shift-
ing. Refer to the installation diagram (Fig. 85) during
assembly.
Coat the intermediate plate shift rail bores
and the interlock balls, pins and plugs with a
thick covering of petroleum jelly before assem-
bly. The jelly will hold the interlock compo-
nents in place making installation easier. Use a
pencil magnet to hold and insert the interlocks.
Then use a small screwdriver to push the inter-
lock components into place.
(1) Coat reverse rail interlock pin with petroleum
jelly and install pin in rail (Fig. 86).
(2) Install reverse shift rail in intermediate plate
(Fig. 87).
Fig. 81 Installing Cluster Gear Rear Bearing
Fig. 82 Installing Rear Bearing Snap Rings
Fig. 83 Installing Reverse Idler Gear And Shaft
Fig. 84 Installing Rear Bearing Retainer
21 - 56 AX 15 MANUAL TRANSMISSIONJ
Page 1434 of 2198
(3) Install reverse shift rail C-ring (Fig. 51).
Fig. 85 Shift Rail Ball-Plug-Pin Position
Fig. 86 Installing Reverse Shift Rail Interlock Pin
Fig. 87 Installing Reverse Shift Rail And Fork
JAX 15 MANUAL TRANSMISSION 21 - 57
Page 1435 of 2198
(4) Position 1-2 and 3-4 shift forks in synchro
sleeves (Fig. 88).
(5) Coat reverse rail lock ball with petroleum jelly.
Then tilt reverse shift fork upward and insert ball in
intermediate plate (Fig. 89).
(6) Coat 1-2 shift rail interlock plug with petro-
leum jelly and install it in intermediate plate bore
(Fig. 90).
(7) Coat 1-2 shift rail interlock pin with petroleum
jelly and insert it in shift rail (Fig. 91).(8) Install 1-2 shift rail in intermediate plate and
1-2 fork (Fig. 92).
Fig. 88 Shift Fork Installation
Fig. 89 Installing Reverse Shift Rail Lock Ball
Fig. 90 Installing 1-2 Shift Rail Interlock Plug
Fig. 91 Installing 1-2 Shift Rail Interlock Pin
Fig. 92 Installing 1-2 Shift Rail
21 - 58 AX 15 MANUAL TRANSMISSIONJ
Page 1436 of 2198
(9) Coat 3-4 shift rail interlock plug with petro-
leum jelly and install plug in intermediate plate (Fig.
93).
(10) Install 3-4 shift rail in intermediate plate and
in both shift forks (Fig. 94).
(11) Verify that none of the interlock balls, plugs,
or pins were displaced during shift rail installation.
(12) Install and tighten shift fork setscrews to 20
Nzm (14 ft. lbs.) torque (Fig. 95).
(13) Install 1-2 and 3-4 shift rail C-rings (Fig. 96).
(14) Insert fifth gear shift rail through reverse
shift fork.Then slide rail into intermediate plate
just far enough to secure interlock ball. Do not
fully install shift rail at this time.
FIFTH-REVERSE GEAR AND SHIFT
COMPONENT INSTALLATION
(1) Install thrust ring lock ball in cluster gear jour-
nal (Fig. 97). Use petroleum jelly to hold ball in
place.
Fig. 93 Installing 3-4 Shift Rail Interlock Plug
Fig. 94 Installing 3-4 Shift Rail
Fig. 95 Installing Shift Fork Set Screws
Fig. 96 Installing Shift Rail C-Rings
Fig. 97 Installing Thrust Ring Lock Ball
JAX 15 MANUAL TRANSMISSION 21 - 59
Page 1437 of 2198
(2) Install fifth gear thrust ring (Fig. 98). Be sure
thrust ring notch fits over lock ball.
(3) Assemble counter fifth gear, synchro sleeve, in-
serts and insert springs (Fig. 99).
(4) Lubricate two-piece bearing with petroleum
jelly and install it in counter fifth gear (Fig. 100).
(5) Install counter fifth gear and synchro assembly
on cluster gear journal (Fig. 101).
(6) Install synchro ring in synchro sleeve (Fig.
102).
Fig. 98 Installing Fifth Gear Thrust Ring
Fig. 99 Assembling Fifth Gear And Synchro
Assembly
Fig. 100 Installing Counter Fifth Gear Bearing
Fig. 101 Installing Counter Fifth Gear And Sleeve
Fig. 102 Installing Fifth Gear Synchro Ring
21 - 60 AX 15 MANUAL TRANSMISSIONJ
Page 1438 of 2198
(7) Install fifth spline gear on cluster journal (Fig.
103). Tap spline gear into place with plastic mallet if
necessary.
(8) Install fifth gear selective snap ring (Fig. 104).
Use thickest snap ring that will fit in shaft groove.
(9) Install reverse shift head and rail (Fig. 105).
Then install lock ball in shift head.
(10) Position fifth gear shift fork in synchro sleeve
(Fig. 106).(11) Install fifth gear shift rail (Fig. 107). Slide rail
through fork, shift head, intermediate plate and re-
verse shift fork. Be sure interlock ball is not dis-
placed during installation.
Fig. 103 Installing Fifth Spline Gear
Fig. 104 Installing Fifth Gear Snap Ring
Fig. 105 Installing Reverse Shift Head And Rail
Fig. 106 Fifth Gear Shift Fork Installation
Fig. 107 Fifth Gear Shift Rail Installation
JAX 15 MANUAL TRANSMISSION 21 - 61
Page 1439 of 2198
(12) Align screw holes in shift fork and rail and in-
stall set screw (Fig. 108). Tighten screw to 20 Nzm
(15 ft. lbs.) torque.
(13) Install lock balls and springs in intermediate
plate (Fig. 109). Then install and tighten lock ball
plugs to 19 Nzm (14 ft. lbs.) torque.
(14) Install reverse shift arm bracket (Fig. 110).
Tighten bracket bolts to 18 Nzm (13 ft. lbs.) torque.(15) Install reverse shift arm (Fig. 110). Position
arm on reverse fork pin and engage it with pin on
shift arm bracket.
(16) Verify that shift arm shoe is engaged in re-
verse idler gear. Then secure shift arm to pin on re-
verse fork with new E-clip.
GEAR CASE AND ADAPTER INSTALLATION
(1) Dismount intermediate plate and gear assem-
blies from vise.
(2) Clean mating surfaces of intermediate plate
and transmission gear case with wax and grease re-
mover. Then wipe dry with a clean cloth.
(3) Apply 3 mm (1/8 in.) wide bead of Mopar Gas-
ket Maker, or Loctite 518 to mating surface of gear
case. Keep sealer bead inside bolt holes as shown
(Fig. 111).
Fig. 108 Shift Fork Set Screw Installation
Fig. 109 Detent Ball And Spring Installation
Fig. 110 Reverse Shift Arm And Bracket Installation
Fig. 111 Applying Sealer To Gear Case
21 - 62 AX 15 MANUAL TRANSMISSIONJ
Page 1440 of 2198
(4) Install gear case (Fig. 112). Align shift rails and
bearings in case and tap case into position.
(5) Verify that gear case is seated on intermediate
plate dowel pins.
(6) Install front bearing snap rings (Fig. 113).
(7) Clean gear case and front bearing retainer seal-
ing surfaces with wax and grease remover. Then
wipe dry with a clean cloth.
(8) Install new seal in front bearing retainer. Then
lubricate seal lip with petroleum jelly.Installation
depth for seal is 10.5 to 11.5 mm (0.413 to 0.453
in.).
(9) Applya3mm(1/8 in.) wide bead of Mopar
Gasket Maker, or Loctite 518 to front bearing re-
tainer sealing surface.(10) Align and install front bearing retainer (Fig.
114). Be sure retainer is properly seated on case and
bearings.
(11) Install and tighten front bearing retainer bolts
to 17 Nzm (12 ft. lbs.) torque.
(12) On models with extension housing, install
speedometer gear, lock ball and retaining rings (Fig.
115). Be sure lock ball is engaged in gear.
(13) Inspect condition of reverse pin in adapter/ex-
tension housing (Fig. 116). If pin is worn or damaged,
replace it as follows:
(a) Remove roll pin access plug (Fig. 117).
(b) Tap roll pin out of housing with pin punch
(Fig. 118). Then remove old reverse pin.
(c) Install new reverse pin and secure it with roll
pin. Then install and tighten access plug to 19 Nzm
(14 ft. lbs.) torque.
(14) Clean sealing surfaces of adapter or extension
housing and intermediate plate with wax and grease
remover. Then wipe dry with a clean cloth.
Fig. 112 Gear Case Installation
Fig. 113 Front Bearing Snap Ring Installation
Fig. 114 Installing Front Bearing Retainer
Fig. 115 Speedometer Gear Installation (2WD
Models)
JAX 15 MANUAL TRANSMISSION 21 - 63