clock NISSAN TEANA 2003 Owner's Guide
Page 2196 of 3502
EM-88
[QR]
CYLINDER BLOCK
ii. Tighten M8 bolts in numerical order from No. 11 to 22 in the fig-
ure.
CAUTION:
Wipe off completely any protruding liquid gasket on rear oil
seal installation surface.
NOTE:
There are more processes to complete the tightening of mount-
ing bolts. However stop procedure here to install rear oil seal.
c. Install rear oil seal. Refer to EM-64, "
Removal and Installation of Rear Oil Seal" .
d. Restart tightening of lower cylinder block bolts with the following procedure:
i. Tighten M10 bolts in numerical order from No. 1 to 10 in the fig-
ure.
ii. Turn M10 bolts 60 degrees clockwise (angle tightening) in
numerical order from No. 1 to 10 in the figure.
CAUTION:
Check and confirm the tightening angle by using angle
wrench (SST) or protractor. Avoid judgment by visual
inspection without the tool.
After installing mounting bolts, make sure that crankshaft can be rotated smoothly by hand.
Wipe off completely any protruding liquid gasket on front side of engine.
Check crankshaft end play. Refer to EM-99, "CRANKSHAFT END PLAY" .
8. Install piston to connecting rod with the following procedure:
a. Using snap ring pliers, install new snap ring to the groove of the piston rear side.
Insert it fully into groove to install.
b. Assemble piston to connecting rod.
Using industrial drier or similar tool, heat the piston until the piston pin can be pushed in by hand with-
out excess force [approximately 60 to 70 °C (140 to 158 °F)]. From the front to the rear, insert piston pin
into piston and connecting rod. : 25.1 N·m (2.6 kg-m, 19 ft-lb)
KBIA0063E
: 39.2 N·m (4.0 kg-m, 29 ft-lb)
KBIA0063E
KBIA0065E
Page 2198 of 3502
EM-90
[QR]
CYLINDER BLOCK
Using piston ring compressor (SST) or suitable tool, install
piston with the front mark on the piston head facing the front
of the engine.
CAUTION:
Be careful not to damage the cylinder wall and crankshaft
pin, resulting from an interference of the connecting rod
big end.
13. Install connecting rod cap.
Match the stamped cylinder number marks on connecting rod
with those on connecting rod cap to install.
14. Tighten connecting rod bolts with the following procedure:
a. Apply new engine oil to the threads and seats of connecting rod bolts.
b. Tighten bolts.
c. Then turn all bolts 90 degrees clockwise (Angle tightening).
CAUTION:
Check and confirm the tightening angle by using angle
wrench (SST) or protractor. Avoid judgement by visual
inspection without the tool.
After tightening connecting rod bolts, make sure that crankshaft rotates smoothly.
Check the connecting rod side clearance. Refer to EM-99, "CONNECTING ROD SIDE CLEARANCE" .
15. Install drive plate.
Secure drive plate with stopper plate, and tighten mounting bolts crosswise over several times.
PBIC1619E
PBIC2196E
: 19.6 N·m (2.0 kg-m, 14 ft-lb)
KBIA0068E
Page 2237 of 3502
DRIVE BELTS
EM-129
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EM
Release the tension by loosing lock nut and turning adjusting nut when adjusting the belt. Tighten
once the lock nut at 4.9 N·m (0.50 Kg-m, 43 in-lb). Then, adjust the belt tension by loosing lock nut
between 45° and 90°.
Keep engine oil, working fluid and engine coolant away from belt.
Do not twist or bend belt excessively.
ALTERNATOR AND A/C COMPRESSOR BELT
1. Remove splash guard (RH).
2. Loosen idler pulley lock nut (A).
3. Release the belt tension on idler pulley by turning adjusting nut
(B).
4. Tighten lock nut (A).
5. Loosen lock nut (A) between 45° and 90°.
6. Adjust tension by turning adjusting nut (B).
For specified belt tension, refer to EM-128, "Checking Drive
Belts" .
7. Tighten lock nut (A).
8. Tighten adjusting nut (B).
POWER STEERING OIL PUMP BELT
1. Remove splash guard (RH).
2. Loosen lock bolt (C).
3. Loosen power steering oil pump mounting bolt (D).
Bolt head (D) is engine rear side.
4. Adjust tension by turning adjusting bolt (E).
For specified belt tension, refer to EM-128, "Checking Drive Belts" .
NOTE:
Adjusting bolt (E) is loosened with counterclockwise rotation.
5. Tighten lock bolt (C).
6. Tighten power steering oil pump mounting bolt (D).
Removal and InstallationBBS004VO
REMOVAL
1. Remove splash guard (RH).
2. Fully loosen each belt by following the guidelines in EM-128, "
Tension Adjustment" . Remove alternator
and A/C compressor belt and then power steering oil pump belt.
CAUTION:
Grease is applied to idler pulley adjusting bolt. Be careful to keep grease away from belt.
INSTALLATION
1. Install each belt to pulley in the reverse order of removal. : 4.9 N·m (0.50 kg-m, 43 in-lb)
: 34.8 N·m (3.5 kg-m, 26 ft-lb)
: 5.4 N·m (0.55 kg-m, 48 in-lb)
PBIC2450E
: 28.0 N·m (2.9 kg-m, 21 ft-lb)
: 43.2 N·m (4.4 kg-m, 32 ft-lb)
Page 2271 of 3502
FRONT TIMING CHAIN CASE
EM-163
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EM
FRONT TIMING CHAIN CASEPFP:13599
Removal and InstallationBBS004VZ
NOTE:
This section describes removal/installation procedure of front timing chain case and timing chain related
parts without removing oil pan (upper) on vehicle.
When oil pan (upper) needs to be removed or installed, or when rear timing chain case is removed or
installed, remove oil pans (lower and upper) first. Then remove front timing chain case, timing chain
related parts, and rear timing chain case in this order, and install in the reverse order of removal. Refer to
EM-173, "
TIMING CHAIN" .
Refer to EM-173, "TIMING CHAIN" for component parts location.
REMOVAL
1. Remove engine cover. Refer to EM-133, "INTAKE MANIFOLD COLLECTOR" .
2. Remove air duct (inlet), air cleaner case (upper) with mass air flow sensor and air duct assembly. Refer to
EM-131, "
AIR CLEANER AND AIR DUCT" .
3. Remove undercover and splash guard (RH).
4. Remove right side front road wheel and tire.
5. Drain engine oil. Refer to LU-21, "
Changing Engine Oil" .
CAUTION:
Perform this step when engine is cold.
Do not spill engine oil on drive belts.
6. Drain engine coolant from radiator. Refer to CO-34, "
Changing Engine Coolant" .
CAUTION:
Perform this step when engine is cold.
Do not spill engine coolant on drive belts.
7. Remove intake manifold collectors (upper and lower). Refer to EM-133, "
INTAKE MANIFOLD COLLEC-
TOR" .
8. Remove drive belts. Refer to EM-128, "
DRIVE BELTS" .
9. Remove alternator. Refer to SC-27, "
CHARGING SYSTEM" .
10. Remove power steering oil pump from bracket with piping connected, and temporarily secure it to aside.
Refer to PS-29, "
POWER STEERING OIL PUMP" .
11. Remove power steering oil pump bracket. Refer to PS-29, "
POWER STEERING OIL PUMP" .
12. Remove idler pulley and bracket. Refer to EM-173, "
TIMING CHAIN" .
13. Separate engine harnesses removing their brackets from front timing chain case.
14. Remove rocker covers (right and left bank). Refer to EM-160, "
ROCKER COVER" .
NOTE:
When only timing chain (primary) is removed, rocker cover does not need to be removed.
15. Obtain No. 1 cylinder at TDC of its compression stroke as follows:
NOTE:
When timing chain is not removed/installed, this step is not required.
a. Rotate crankshaft pulley clockwise to align timing mark (grooved
line without color) with timing indicator.
SEM918G
Page 2279 of 3502
FRONT TIMING CHAIN CASE
EM-171
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EM
e. Tighten mounting bolts in numerical order as shown in the fig-
ure.
12. Install crankshaft pulley as follows:
a. Install crankshaft pulley, taking care not to damage front oil seal.
When press-fitting crankshaft pulley with plastic hammer, tap on its center portion (not circumference).
b. Fix crankshaft with pulley holder [SST: KV10109300].
c. Tighten crankshaft pulley bolt.
d. Place a matching mark (A) on crank pulley (1) aligning with the
matching (B) of crank pulley mounting bolt (2). Tighten the bolts
90 degrees (one marks).
e. Rotate crankshaft pulley in normal direction (clockwise when viewed from engine front) to confirm it turns
smoothly.
13. For the following operations, perform steps in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluid leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-14, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside timing chain tensioner drops after removal/installation, slack in the guide may
generate a pounding noise during and just after engine start. However, this is normal. Noise will stop after
hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of exhaust gases, or any oil/fluids including
engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
PBIC0918E
: 44.1 N·m (4.5 kg-m, 33 ft-lb)
PBIC4627J
Page 2283 of 3502
TIMING CHAIN
EM-175
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EM
12. Obtain No. 1 cylinder at TDC of its compression stroke as follows:
a. Rotate crankshaft pulley clockwise to align timing mark (grooved
line without color) with timing indicator.
b. Make sure that intake and exhaust cam noses on No. 1 cylinder
(engine front side of right bank) are located as shown in the fig-
ure.
If not, turn crankshaft one revolution (360 degrees) and align
as shown in the figure.
13. Remove crankshaft pulley as follows:
a. Fix crankshaft with pulley holder (SST).
b. Loosen crankshaft pulley bolt and locate bolt seating surface at
10 mm (0.39 in) from its original position.
CAUTION:
Do not remove crankshaft pulley bolt as it will be used as a
supporting point for suitable puller.
c. Place suitable puller tab on holes of crankshaft pulley, and pull
crankshaft pulley through.
CAUTION:
Do not put suitable puller tab on crankshaft pulley periph-
ery, as this will damage internal damper.
14. Remove front timing chain case as follows:
SEM918G
SEM418G
PBIC2475E
SEM915E
Page 2299 of 3502
TIMING CHAIN
EM-191
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EM
e. Rotate crankshaft pulley in normal direction (clockwise when viewed from engine front) to confirm it turns
smoothly.
17. For the following operations, perform steps in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-14, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside timing chain tensioner drops after removal/installation, slack in the guide may
generate a pounding noise during and just after engine start. However, this is normal. Noise will stop after
hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid. power steering fluid, brake fluid, etc.Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
Page 2310 of 3502
EM-202
[VQ]
CAMSHAFT
Summary of the inspection items:
* Transmission/transaxle/CVT fluid. power steering fluid, brake fluid, etc.
Valve ClearanceBBS004W2
INSPECTION
In cases of removing/installing or replacing camshaft and valve-
related parts, or of unusual engine conditions due to changes in
valve clearance (found malfunctions during stating, idling or causing
noise), perform inspection as follows:
1. Remove rocker covers (right and left banks). Refer to EM-160, "
ROCKER COVER" .
2. Remove splash guard (RH).
3. Measure the valve clearance as follows:
a. Set No. 1 cylinder at TDC of its compression stroke.
Rotate crankshaft pulley clockwise to align timing mark
(grooved line without color) with timing indicator.
Make sure that intake and exhaust cam noses on No. 1 cylin-
der (engine front side of right bank) are located as shown in
the figure.
If not, rotate crankshaft one revolution (360 degrees) and
align as shown in the figure.
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
SEM713A
SEM918G
SEM418G
Page 2311 of 3502
CAMSHAFT
EM-203
[VQ]
C
D
E
F
G
H
I
J
K
L
MA
EM
b. Use feeler gauge, measure the clearance between valve lifter
and camshaft.
Valve clearance:
Unit: mm (in)
*: Approximately 80°C (176°F)
By referring to the figure, measure the valve clearances at
locations marked “×” as shown in the table below (locations
indicated in the figure) with feeler gauge.
No. 1 cylinder at compression TDC
c. Rotate crankshaft by 240 degrees clockwise (when viewed from engine front) to align No. 3 cylinder at
TDC of its compression stroke.
NOTE:
To align cylinder No.3 with the compression top dead center,
place matching marks (A) on the crank pulley (1) side and on
the cylinder block side at a point 240°counterclockwise from
the compression top dead center using the hex head of the
crank pulley mounting bolt as aguide.
SEM139D
Cold Hot * (reference data)
Intake 0.26 - 0.34 (0.010 - 0.013) 0.304 - 0.416 (0.012 - 0.016)
Exhaust 0.29 - 0.37 (0.011 - 0.015) 0.308 - 0.432 (0.012 - 0.017)
Measuring position (right bank) No. 1 CYL. No. 3 CYL. No. 5 CYL.
No. 1 cylinder at
compression TDCEXH×
INT×
Measuring position (left bank) No. 2 CYL. No. 4 CYL. No. 6 CYL.
No. 1 cylinder at
compression TDCINT×
EXH×
PBIC2054E
PBIC4628J
Page 2312 of 3502
EM-204
[VQ]
CAMSHAFT
By referring to the figure, measure the valve clearances at
locations marked “×” as shown in the table below (locations
indicated in the figure).
No. 3 cylinder at compression TDC
d. Rotate crankshaft by 240 degrees clockwise (when viewed from engine front) to align No. 5 cylinder at
TDC of compression stroke.
NOTE:
To align cylinder No.5 with the compression top dead center,
place matching marks (A) on the crank pulley (1) side and on
the cylinder block side at a point 240°counterclockwise from
the compression top dead center using the hex head of the
crank pulley mounting bolt as aguide.
Measuring position (right bank) No. 1 CYL. No. 3 CYL. No. 5 CYL.
No. 3 cylinder at
compression TDCEXH×
INT×
Measuring position (left bank) No. 2 CYL. No. 4 CYL. No. 6 CYL.
No. 3 cylinder at
compression TDCINT×
EXH ×
PBIC2055E
PBIC4628J