TOYOTA AVENSIS 2002 Repair Manual
Page 461 of 1690
A09663
:Seal Packing
14±338
±
ENGINE MECHANICAL CYLINDER HEAD GASKET(1CD±FTV)
AVENSIS REPAIR MANUAL (RM1018E)
76.INSTALL CAMSHAFT OIL SEAL RETAINER (See page 14±318)
77.INSTALL CAMSHAFT TIMING PULLEY (See page 14±318) SST 09960±10010 (09962±01000, 09963±01000)
78.INSTALL CAMSHAFT POSITION SENSOR (See page 10±64)
79.INSTALL INJECTOR ASSY(See page 11±60)
80.INSTALL NOZZLE LEAKAGE PIPE ASSY(See page 11±60) SST 09992±00242
81. INSTALL CYLINDER HEAD COVER SUB±ASSY
(a) Remove any old packing (FIPG) material.
(b) Apply seal packing to the cylinder head.Seal packing: Part No. 08826±00080 or equivalent
(c) Install the gasket to the head cover.
(d) Install the cylinder head cover with the 10 bolts. Torque: 13 N m (135 kgf cm, 9.7 ft lbf)
82. INSTALL NOZZLE HOLDER SEAL
(a) Install 4 new nozzle holder seals.
83.INSTALL VACUUM PUMP ASSY (See page 14±318) 84. INSTALL INJECTION PIPE SUB±ASSY NO.1(See page 11±60)
NOTICE:
When assembling the pipes, perform the operation with the
engine cold under room temperature.
(a) Remove the vinyl or the plastic bag from the injector and vinyl tape from the common rail.
(b) Temporarily install the injection pipe.
Page 462 of 1690
A79147
Fulcrum
Length
30 cm
SST
± ENGINE MECHANICALCYLINDER HEAD GASKET (1CD±FTV)
14±339
AVENSIS REPAIR MANUAL (RM1018E)
(c) Using SST, tighten the nut of the injection pipe to the com-
mon rail side.
SST 09023±12700
Torque:
42 Nm (428 kgfcm, 31 ftlbf) for a used pipe using SST
46 Nm (469 kgfcm, 34 ftlbf) for a used pipe not using
SST
31 Nm (316 kgfcm, 23 ftlbf) for a new pipe using SST
34 Nm (347 kgfcm, 25 ftlbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(d) Using SST, tighten the nut of the injection pipe to the injec-
tor side.
SST 09023±12700
Torque:
42 Nm (428 kgfcm, 31 ftlbf) for a used pipe using SST
46 Nm (469 kgfcm, 34 ftlbf) for a used pipe not using
SST
31 Nm (316 kgfcm, 23 ftlbf) for a new pipe using SST
34 Nm (347 kgfcm, 25 ftlbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after injection pipe is reassembled. If there is deflec-
tion or if it can not be installed properly, replace the used
pipe with a new pipe.
(e) Install the 2 upper injection pipe clamps with the 2 nuts.
Torque: 5.0 Nm (51 kgfcm, 44 in.lbf)
85. INSTALL INJECTION PIPE SUB±ASSY NO.2
SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
86. INSTALL INJECTION PIPE SUB±ASSY NO.3
SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
87. INSTALL INJECTION PIPE SUB±ASSY NO.4
SST 09023±12700
HINT:
Perform the same procedures as injection pipe No. 1.
Page 463 of 1690
A79148
SST
A79149
SST
14±340
±
ENGINE MECHANICAL CYLINDER HEAD GASKET(1CD±FTV)
AVENSIS REPAIR MANUAL (RM1018E)
88.INSTALL FUEL INLET PIPE SUB±ASSY
NOTICE:
In case of having the cylinder head gasket replaced,
must replace fuel inlet pipe, too.
When assembling the pipe, perform the operation
with the engine cold under room temperature.
(a)Temporarily install the new fuel inlet pipe.
(b)Using SST, tighten the nut of the fuel inlet pipe to the com- mon rail side.
SST09023±12700
Torque:
42 Nm (428 kgf cm, 31 ft lbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ft lbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ft lbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after inlet pipe is reassembled. If there is deflection
or if it can not be installed properly, replace the used pipe
with a new pipe.
(c)Using SST, tighten the nut of the fuel inlet pipe to the pump side.
SST09023±12700
Torque:
42 Nm (428 kgf cm, 31 ft lbf) for a used pipe using SST
46 N m (469 kgf cm, 34 ft lbf) for a used pipe not using
SST
31 N m (316 kgf cm, 23 ft lbf) for a new pipe using SST
34 N m (347 kgf cm, 25 ft lbf) for a new pipe not using
SST
HINT:
Use a torque wrench with a fulcrum length of 30 cm
(11.81 in.)
Check if the used pipe has deflection or is installed prop-
erly after inlet pipe is reassembled. If there is deflection
or if it can not be installed properly, replace the used pipe
with a new pipe.
89.INSTALL TURBOCHARGER SUB±ASSY (See page 13±11)
90.INSTALL TURBO OIL INLET PIPE SUB±ASSY (See page 13±11)
91.INSTALL TURBOCHARGER STAY (See page 13±11)
92.INSTALL EXHAUST MANIFOLD CONVERTER SUB±ASSY (See page 13±11)
93.INSTALL MANIFOLD STAY NO.2 (See page 13±11)
94.INSTALL EXHAUST MANIFOLD HEAT INSULATOR NO.2 (See page 13±11)
Page 464 of 1690
±
ENGINE MECHANICAL CYLINDER HEAD GASKET (1CD±FTV)
14±341
AVENSIS REPAIR MANUAL (RM1018E)
95.INSTALL TURBO INSULATOR NO.1 (See page 13±11)
96.INSTALL TURBO INSULATOR NO.2 (See page 13±11)
97.INSTALL EXHAUST PIPE ASSY (W/ COLD AREA) (See page 13±11)
98.INSTALL EXHAUST PIPE ASSY FRONT(See page 15±10)
99.INSTALL FLOOR PANEL BRACE FRONT(See page 15±10)
100.INSTALL HEATER BRACKET (W/ COLD AREA)(See page 13±11)
101.INSTALL HEATER PUMP ASSY (W/ COLD AREA)(See page 13±11)
102.INSTALL FUEL FILTER ASSY(See page 11±82)
103.SET NO. 1 CYLINDER TO TDC/COMPRESSION(See page 14±307)
SST 09960±10010 (09962±01000, 09963±01000)
104.INSTALL TIMING BELT(See page 14±307)
105.CHECK VALVE TIMING(See page 14±307)
106.TIMING CHAIN COVER PLATE(See page 14±307)
107.INSTALL TRANSVERSE ENGINE ENGINE MOUNTING BRACKET(See page 14±307)
108.INSTALL TIMING BELT GUIDE(See page 14±307)
109.INSTALL TIMING BELT NO.1 COVER(See page 14±307)
110.INSTALL TIMING BELT NO.2 COVER(See page 14±307)
111.INSTALL IDLER PULLEY SUB±ASSY(See page 14±307)
112.INSTALL CRANKSHAFT PULLEY(See page 14±307) SST 09213±54015 (90105±08076), 09330±00021
113.INSTALL ENGINE MOUNTING INSULATOR SUB±ASSY RH(See page 14±307)
114.INSTALL POWER STEERING IDLE PULLEY BRACKET(See page 14±307)
115. ADJUST V (COOLER COMPRESSOR TO CRANKSHAFT PULLEY) BELT NO.1 (See page 14±269)
116.INSTALL INJECTOR DRIVER (See page 14±286)
117.INSTALL AIR TUBE NO.1(See page 14±270)
118.INSTALL AIR TUBE NO.2 (See page 14±286)
119.INSTALL AIR CLEANER ASSY (See page 14±286)
120.INSTALL VACUUM RESERVOIR SUB±ASSY (See page 13±11)
121. INSTALL ENGINE COVER NO.1
Torque: 8.0 N m (82 kgf cm, 71 in. lbf)
122. INSTALL FRONT WHEEL RH Torque: 103 N m (1,050 kgf cm, 76 ft lbf)
123. ADD ENGINE OIL
124.ADD ENGINE COOLANT(See page 16±44)
125.CHECK FOR FUEL LEAKS(See page 11±60)
126. CHECK FOR ENGINE OIL LEAKS
127.CHECK FOR ENGINE COOLANT LEAKS(See page 16±44)
128. CHECK FOR EXHAUST GAS LEAKS
Page 465 of 1690
141CL±01
A79321
Clip
Engine Room Side Cover RH
Retainer Clip
Radiator Cover Assy
Clip
Engine Under Cover RH
Engine Under Cover No. 1
Clip
14±76
± ENGINE MECHANICALCYLINDER HEAD GASKET (1ZZ±FE/3ZZ±FE)
AVENSIS REPAIR MANUAL (RM1018E)
CYLINDER HEAD GASKET (1ZZ±FE/3ZZ±FE)
COMPONENTS
Page 466 of 1690
A76711
Fan and Generator V Belt
Generator Assy Terminal Cap
No. 1
Cylinder Head Cover No. 2 Clip
Fuel Pipe Clamp
Fuel Tube Sub±assy
Water By±pass Hose
Water By±pass Hose No. 2
Accelerator Control
Cable Assy
Heater Inlet Water Hose
Radiator Hose Inlet
Air Cleaner Hose No. 1
GasketExhaust pipe Assy Front
Compression Spring43 (440, 32)
43 (440, 32)Compression Spring
Non±reusable part
N´m (kgf´cm, ft´lbf) : Specified torque
V±ribbed idler Assy No. 1
Tube
54 (551, 40)
9.8 (100, 7)
25 (255, 18)
39 (400, 29)
7.0 (71, 62 in.lbf)
52 (530, 38)
52 (530, 38)
Union to Connector Tube Hose
Fuel Vapor Feed Hose No.1
Fuel Vapor Feed Hose No.3
Vacuum Hose Assy
Engine
Mounting
Insulator RH
VSV Connector
Mass Air Flow Meter Connector
± ENGINE MECHANICALCYLINDER HEAD GASKET (1ZZ±FE/3ZZ±FE)
14±77
AVENSIS REPAIR MANUAL (RM1018E)
Page 467 of 1690
A76709
Ventilation Hose No. 2
Clamp Bracket
Ventilation Hose Ignition Coil AssyEngine Wire
Clamp Bracket
Clamp Bracket
Gasket
Cylinder Head Cover
Sub±assy
Seal Washer
N´m (kgf´cm, ft´lbf) : Specified torque
9.0 (92, 80 in.lbf)
9.0 (92, 80 in.lbf)
9.0 (92, 80 in.lbf)
9.0 (92, 80 in.lbf)
11 (112, 8)11 (112, 8)11 (112, 8)
11 (112, 8)
14±78
± ENGINE MECHANICALCYLINDER HEAD GASKET (1ZZ±FE/3ZZ±FE)
AVENSIS REPAIR MANUAL (RM1018E)
Page 468 of 1690
A60625
Crankshaft Pulley V±ribbed Belt
Tensioner Assy
Water Pump AssyTransverse Engine
Engine Mounting Bracket
Crankshaft Position Sensor Chain Tensioner Assy No. 1
Timing Chain or
Belt Cover Sub±assy
Oil Seal
Crankshaft Position Sensor
Plate No. 1Chain Sub±assy
Chain Tensioner Slipper
Crankshaft timing Sprocket O±ring
Non±reusable part
N´m (kgf´cm, ft´lbf) : Specified torque
47 (479, 35)
29 (296, 21)
69 (704, 51)
138 (1,047, 102)
13 (133, 10)
9.0 (92, 80 in.lbf)
9.0 (92, 80 in.lbf)
19 (194, 14)
9.0 (92, 80 in.lbf) (L=20)
11 (112, 8) (L=35)
9.5 (97, 84 in.lbf)
13 (133, 10) (M6)
19 (194, 14) (M8)
± ENGINE MECHANICALCYLINDER HEAD GASKET (1ZZ±FE/3ZZ±FE)
14±79
AVENSIS REPAIR MANUAL (RM1018E)
Page 469 of 1690
A76712
Camshaft
Camshaft No. 2
Plate Washer Camshaft Bearing Cap No. 1
Camshaft Bearing Cap No. 3
Cylinder Head Sub±assy Camshaft Timing
Oil Control Valve Assy
Cylinder Head Gasket
Manifold Stay No. 1 Intake Manifold
Clamp Bracket
Oil Level Gage Guide
O±ring Oil Level Gage
Sub±assy
Non±reusable part
N´m (kgf´cm, ft´lbf): Specified torque
13 (133, 10)
23 (235, 17)
30 (306, 22)
9.0 (92, 80 in. lbf)
1st 49 (500, 36)
2nd Turn 90
See page 14±81
49 (500, 36)
Gasket
Manifold Stay No. 2
37 (377, 27)
O±ring
9.0 (92, 80 in. lbf)
13 (133, 10)
49 (500, 36)
14±80
±
ENGINE MECHANICAL CYLINDER HEAD GASKET (1ZZ±FE/3ZZ±FE)
AVENSIS REPAIR MANUAL (RM1018E)
Page 470 of 1690
141CM±01
A78459
A78461
1ZZ±FE
A78497
3ZZ±FE
±
ENGINE MECHANICAL CYLINDER HEAD GASKET(1ZZ±FE/3ZZ±FE)
14±81
AVENSIS REPAIR MANUAL (RM1018E)
REPLACEMENT
1.DISCHARGE FUEL SYSTEM PRESSURE(See page 11±1)
2.REMOVE RADIATOR SUPPORT OPENING COVER (See page 14±27)
3.REMOVE ENGINE ROOM COVER SIDE (See page 14±27)
4.REMOVE FRONT WHEEL RH
5.REMOVE ENGINE UNDER COVER SUB±ASSY NO.1 (See page 14±27)
6.REMOVE ENGINE UNDER COVER RH (See page 14±27)
7.DRAIN ENGINE COOLANT(See page 16±7)
8.REMOVE CYLINDER HEAD COVER NO.2
(a)Remove the 2 nuts and 2 clips and detach the cylinderhead cover No.2.
9.SEPARATE ACCELERATOR CONTROL CABLE ASSY
(a)Loosen the nut and separate the accelerator control cable.
10.REMOVE AIR CLEANER HOSE NO.1
(a)Disconnect the VSV connector.
(b)Disconnect the fuel vapor feed No. 1 hose from the VSV.
(c)Disconnect the fuel vapor feed hose from the VSV.
(d)Loosen the 2 air cleaner hose clamp bolts and remove the air cleaner hos\
e.
11.DISCONNECT WATER BY±PASS HOSE
(a)Disconnect the water by±pass hose from the throttle body.
12.DISCONNECT WATER BY±PASS HOSE NO.2
(a)Disconnect the water by±pass hose from the throttle body.
13.REMOVE EFI FUEL PIPE CLAMP (See page 11±11)