timing belt CHRYSLER CARAVAN 2005 Workshop Manual
[x] Cancel search | Manufacturer: CHRYSLER, Model Year: 2005, Model line: CARAVAN, Model: CHRYSLER CARAVAN 2005Pages: 2339, PDF Size: 59.69 MB
Page 1336 of 2339

(17) Install accessory drive belt. (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
INSTALLATION)
(18) Install oil pump pick-up tube with new
O-ring. Tighten attaching bolt to 28 N´m (250 in.
lbs.).
(19) Install oil pan. (Refer to 9 - ENGINE/LUBRI-
CATION/OIL PAN - INSTALLATION)
(20) Install inner splash shield and right front
wheel.
(21) Fill crankcase with engine oil to proper level.
(22) Fill cooling system. (Refer to 7 - COOLING -
STANDARD PROCEDURE)
(23) Connect negative cable to battery.
TIMING CHAIN AND
SPROCKETS
REMOVAL
REMOVAL - TIMING CHAIN AND CAMSHAFT
SPROCKET
(1) Disconnect negative cable from battery.
(2) Remove the timing chain cover. (Refer to 9 -
ENGINE/VALVE TIMING/TIMING BELT / CHAIN
COVER(S) - REMOVAL)
(3) Rotate engine by turning crankshaft until the
timing marks are aligned as shown in (Fig. 141).
(4) Remove camshaft sprocket attaching bolt.
(5) Remove the timing chain with camshaft
sprocket.
(6) Remove the crankshaft sprocket. (Refer to 9 -
ENGINE/VALVE TIMING/TIMING BELT/CHAIN
AND SPROCKETS - REMOVAL)
REMOVAL - CRANKSHAFT SPROCKET
(1) Remove the timing chain. (Refer to 9 -
ENGINE/VALVE TIMING/TIMING BELT/CHAIN
AND SPROCKETS - REMOVAL)
(2) Using Special Tools 8539, 5048-6, and 5048-1,
remove the crankshaft sprocket while holding the
crankshaft from turning (Fig. 142). Be careful not to
damage the crankshaft surfaces.
Fig. 141 Timing Mark Alignment
1 - CAMSHAFT SPROCKET TIMING MARK (DOT)
2 - PLATED LINK
3 - CRANKSHAFT SPROCKET TIMING MARK (DOT)
4 - ARROWS
Fig. 142 CRANKSHAFT SPROCKET - REMOVAL
1 - SPECIAL TOOL 5048-6
2 - SPECIAL TOOL 5048-1
3 - SPECIAL TOOL 8450
4 - CRANKSHAFT SPROCKET
5 - SPECIAL TOOL 8539
RSENGINE 3.3/3.8L9 - 159
TIMING CHAIN COVER (Continued)
Page 1337 of 2339

INSTALLATION
INSTALLATION - CRANKSHAFT SPROCKET
(1) Position the sprocket on the crankshaft (timing
mark out) with the timing slot aligned with the tim-
ing pin.
(2) Install sprocket using Special Tool 8452 (Fig.
143). Install sprocket until it is fully seats on the
crankshaft.(3) Install the timing chain and camshaft sprocket.
(Refer to 9 - ENGINE/VALVE TIMING/TIMING
BELT/CHAIN AND SPROCKETS - INSTALLATION)INSTALLATION - TIMING CHAIN AND
CAMSHAFT SPROCKET
(1) Rotate crankshaft so the timing arrow is to the
12 o'clock position (Fig. 141).
NOTE: Lubricate timing chain and sprockets with
clean engine oil before installation.
(2) While holding camshaft sprocket and chain in
hand, place timing chain around the sprocket, align-
ing the plated link with the dot on the sprocket. Posi-
tion the timing arrow to the 6 o'clock position (Fig.
141).
(3) Place timing chain around crankshaft sprocket
with the plated link lined up with the dot on the
sprocket. Install camshaft sprocket into position.
(4) Use a straight edge to check alignment of tim-
ing marks.
(5) Install camshaft sprocket bolt and washer.
Tighten bolt to 54 N´m (40 ft. lbs.).
(6) Rotate crankshaft 2 revolutions and check tim-
ing mark alignment (Fig. 141). If timing marks do
not line up, remove camshaft sprocket and realign.
(7) Install the timing chain cover. (Refer to 9 -
ENGINE/VALVE TIMING/TIMING BELT / CHAIN
COVER(S) - INSTALLATION)
(8) Connect negative cable to battery.
Fig. 143 CRANKSHAFT SPROCKET - INSTALLATION
1 - SPECIAL TOOL 8452-3
2 - SPECIAL TOOL 8452-1
3 - CRANKSHAFT SPROCKET
4 - THRUST BEARING / WASHER
9 - 160 ENGINE 3.3/3.8LRS
TIMING CHAIN AND SPROCKETS (Continued)
Page 1394 of 2339

CRANKSHAFT POSITION
SENSOR
DESCRIPTION
The 2.4L crankshaft sensor is located on the rear
of the engine near the accessory drive belt (Fig. 4).
The 3.3/3.8L crankshaft sensor is located on the rear
of the transmission housing, above the differential
housing (Fig. 5). The bottom of the sensor is posi-
tioned next to the drive plate.
OPERATION
The crankshaft position sensor detects slots cut
into the transmission driveplate extension (Fig. 6).
There are 3 sets of slots. Each set contains 4 slots,
for a total of 12 slots (Fig. 7). Basic timing is set by
the position of the last slot in each group. Once the
Powertrain Control Module (PCM) senses the last
slot, it determines crankshaft position (which piston
will next be at TDC) from the camshaft position sen-
sor input. The 4 pulses generated by the crankshaft
position sensor represent the 69É, 49É, 29É, and 9É
BTDC marks. It may take the PCM one engine rev-
olution to determine crankshaft position.
Fig. 4 CRANKSHAFT SENSOR 2.4L
Fig. 5 CRANKSHAFT SENSOR 3.3/3.8L
Fig. 6 Crankshaft Position Sensor
1 - CRANKSHAFT POSITION SENSOR
Fig. 7 Timing Slots
1 - TORQUE CONVERTER DRIVE PLATE
2 - SLOTS
RSFUEL INJECTION14-29
Page 1448 of 2339

(11) Remove the three front mounting bolts
through the pulley (Fig. 11)
(12) Remove the pump (with pulley) through the
engine compartment rocking it over the aluminum
bracket.
REMOVAL - PUMP (DIESEL)
(1) Remove the negative (-) battery cable from the
battery and isolate cable.
(2) Remove the fill cap from the power steering
fluid reservoir.
(3) Using a siphon pump, remove as much power
steering fluid as possible from the fluid reservoir.
(4) Raise the vehicle. (Refer to LUBRICATION &
MAINTENANCE/HOISTING - STANDARD PROCE-
DURE)
(5) Remove the splash shields from below the
engine compartment.
(6) Remove the accessory drive belt from the power
steering pump pulley. (Refer to 7 - COOLING/AC-
CESSORY DRIVE/DRIVE BELTS - REMOVAL)
(7) Disconnect the fluid supply hose from the
pump (Fig. 12).
(8) Disconnect the pressure hose from the pump
(Fig. 12).
(9) Remove the bolt fastening the stamped bracket
on the rear of the pump to the cast bracket (Fig. 13).
(10) Remove the three front mounting bolts
through the pulley.
(11) Remove the pump from the cast bracket and
vehicle.
DISASSEMBLY - PUMP (PULLEY)
The only serviceable part of the power steering
pump is the pulley. The procedure following is for
removal and installation of the pulley from the pump
once the pump is removed from the vehicle.
Fig. 10 Supply And Pressure Hoses At Pump
1 - PRESSURE HOSE AND FITTING
2 - SUPPLY HOSE AND CLAMP
3 - POWER STEERING PUMP
Fig. 11 Pump Mounting
1 - PUMP REAR MOUNTING BOLT (2001 ONLY)
2 - PUMP FRONT MOUNTING BOLT (3)
3 - TIMING CHAIN COVER AND PUMP BRACKET THRU BOLT
(2001 ONLY)
4 - PUMP BELT PULLEY
5 - POWER STEERING PUMP
6 - BRACKET (2001 ONLY)
Fig. 12 Power Steering Pump - Diesel
1 - PRESSURE HOSE
2 - HOSE CLAMP
3 - SUPPLY HOSE
4 - POWER STEERING PUMP
RSPUMP19-41
PUMP (Continued)
Page 1951 of 2339

SYMPTOM POSSIBLE CAUSE
Sunshade will not function or does not
operate smoothlySunshade feet are missing, broken or loose.
No lubracation in track.
Track obstructions or interference.
Glass movement not consistant or glass does
not operate smoothlyGlass and Track timing.
Glass and Track alignment
Cables and Guide alignment
WATER DRAINAGE AND WIND NOISE DIAGNOSIS
The sliding glass panel is designed to seal water
entry with a snug fit between the roof and the seal.
The fit can be checked by inserting a piece of paper
between the roof and the seal. The piece of paper
should have some resistance when pulled out when
the glass panel is in the closed position. Excessive
wind noise could result if the gap clearances are
exceeded. The sunroof glass panel may need to be
adjusted. Refer to Sunroof Glass Panel Adjustment
for proper procedures.
Adequate drainage is provided by a drain trough in
the sunroof housing which encircles the sliding glass
panel and leads to drain hoses. If a wet headliner or
other water leak complaints are encountered, before
performing any adjustments, first ensure that the
drainage system is not plugged or disconnected. Use
a pint container to pour water into the sunroof hous-
ing drain trough. If water flow is restricted in any of
the four drain holes, use compressed air to blow out
any material plugging the drain system. Retest sys-
tem again.
To further check for a disconnected drain hose:
(1) Remove A-pillar trim, sun visors, and map
lamps/mini console.
(2) Remove sunroof opening trim lace. Refer to
Sunroof Opening Trim Lace.
NOTE: Care must be taken not to fold or kink the
headliner upon removal.
(3) Lower headliner as necessary to gain access to
sunroof housing drain tubes. Refer to Headlining
Removal and Installation for proper procedures.
(4) Repair as necessary.
DRAIN TUBE
REMOVAL
FRONT HOSES
NOTE: Front A-pillars are filled with sound deaden-
ing foam and the front drain tubes are sealed into
the pillars.
(1) Move glass panel to the fully closed position.
(2) Disconnect negative battery cable.
(3) Remove headliner (Refer to 23 - BODY/INTE-
RIOR/HEADLINER - REMOVAL).
(4) Disconnect the drain hose from the sunroof
housing (Fig. 1).
(5) Drain any liquid from hose connection, repair
as necessary.
REAR HOUSING HOSE
(1) Move glass panel to the fully closed position.
(2) Disconnect negative battery cable.
(3) Remove headliner (Refer to 23 - BODY/INTE-
RIOR/HEADLINER - REMOVAL).
(4) Remove third seat or seats from vehicle.
(5) Remove second seat belt lower anchor.
(6) Remove third seat lower anchor.
(7) Remove quarter trim bolster.
(8) Remove trim panel screws.
(9) Remove quarter trim panel
(10) Disconnect the drain hose from the sunroof
housing. (Fig. 1).
(11) Drain any liquid from hose connection, if nec-
essary, and remove tube.
INSTALLATION
FRONT HOSES
(1) Connect the new drain hose to the sunroof
housing and test drainage (Fig. 1).
(2) Install headliner (Refer to 23 - BODY/INTERI-
OR/HEADLINER - INSTALLATION).
(3) Install sunroof opening trim lace.
(4) Connect the control switch wire connector and
install control switch.
23 - 172 SUNROOFRS
SUNROOF (Continued)
Page 2304 of 2339

BACKLIGHT (EBL) SYSTEM, DIAGNOSISAND TESTING - ELECTRIC ..............8G-2
BACKSTOW STRAP - THIRD ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT . . 23-158
BACKSTOW STRAP - THIRD ROW - FOLD-IN-FLOOR - REMOVAL, SEAT ......23-158
BAG RETAINER - INSTALLATION, PLASTIC GROCERY .................. 23-149
BAG RETAINER - REMOVAL, PLASTIC GROCERY ......................... 23-149
BALANCE - STANDARD PROCEDURE, TIRE AND WHEEL ..................... 22-5
BALANCE SHAFTS AND CARRIER ASSEMBLY - DESCRIPTION .............9-71
BALANCE SHAFTS AND CARRIER ASSEMBLY - INSTALLATION .............9-73
BALANCE SHAFTS AND CARRIER ASSEMBLY - OPERATION ...............9-71
BALANCE SHAFTS AND CARRIER ASSEMBLY - REMOVAL .................9-71
BALL JOINT - DESCRIPTION, LOWER ......2-10
BALL JOINT - DIAGNOSIS AND TESTING, LOWER ............................. 2-10
BALL JOINT - OPERATION, LOWER .......2-10
BAR - DESCRIPTION, STABILIZER ....2-16,2-44
BAR - DESCRIPTION, TRACK ............2-45
BAR - INSPECTION, STABILIZER ..........2-17
BAR - INSTALLATION, STABILIZER ........2-17
BAR - INSTALLATION, TRACK ............2-46
BAR - OPERATION, STABILIZER ......2-16,2-44
BAR - OPERATION, TRACK ................2-46
BAR - REMOVAL, STABILIZER ...........2-17
BAR - REMOVAL, TRACK ...............2-46
BAR CUSHION - INSTALLATION, STABILIZER ...........................2-4
BAR CUSHION - REMOVAL, STABILIZER ....2-4
BASE BRAKE BLEEDING - STANDARD PROCEDURE ..........................5-8
BASE BRAKE SYSTEM - DIAGNOSIS AND TESTING .............................5-4
BASE BRAKE SYSTEM, SPECIAL TOOLS ....5-10
BASE BRAKES - DESCRIPTION ............5-3
BASE BRAKES - OPERATION ..............5-3
BASE BRAKES (EXPORT) - DESCRIPTION . . . 5-3
BASE COAT/CLEARCOAT FINISH - DESCRIPTION ...................... 23-101
BASE RISER - SECOND ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT . . 23-135
BASE RISER - SECOND ROW - FOLD-IN-FLOOR - REMOVAL, SEAT ......23-134
BASE TRAY - INSTALLATION, FLOOR CONSOLE ........................... 23-89
BASE TRAY - REMOVAL, FLOOR CONSOLE ........................... 23-89
BATTERY - DESCRIPTION ...............8F-7
BATTERY - OPERATION .................8F-9
BATTERY - REMOVAL .................8F-16
BATTERY - SPECIFICATIONS ............8N-24
BATTERY CABLES - DESCRIPTION .......8F-16
BATTERY CABLES - OPERATION .........8F-17
BATTERY CABLES, DIAGNOSIS AND TESTING ........................... 8F-17
BATTERY CHARGING, STANDARD PROCEDURE - CONVENTIONAL ..........8F-11
BATTERY CHARGING, STANDARD PROCEDURE - SPIRAL PLATE ...........8F-10
BATTERY, DIAGNOSIS AND TESTING ......8F-9
BATTERY ELECTROLYTE LEVEL, STANDARD PROCEDURE - CHECKING ....8F-14
BATTERY HOLDDOWN - INSTALLATION . . . 8F-16
BATTERY HOLDDOWN - REMOVAL .......8F-16
BATTERY REPLACEMENT - STANDARD PROCEDURE ........................ 8N-24
BATTERY, SPECIFICATIONS ..............8F-6
BATTERY SYSTEM - DESCRIPTION ........8F-1
BATTERY SYSTEM - OPERATION .........8F-2
BATTERY SYSTEM, DIAGNOSIS AND TESTING ............................ 8F-2
BATTERY SYSTEM SPECIAL TOOLS, SPECIAL TOOLS ...................... 8F-7
BATTERY TEMPERATURE SENSOR - DESCRIPTION ....................... 8F-24
BATTERY TEMPERATURE SENSOR - OPERATION ......................... 8F-24
BATTERY TEMPERATURE SENSOR - REMOVAL .......................... 8F-24
BATTERY TEMPERATURE SENSOR - SPECIFICATIONS ..................... 8F-23BATTERY TESTER, STANDARD
PROCEDURE - MICRO 420 .............8F-15
BATTERY TRAY - DESCRIPTION .........8F-19
BATTERY TRAY - INSTALLATION .........8F-20
BATTERY TRAY - REMOVAL ............8F-19
BEARING - DESCRIPTION, HUB .......2-30,2-5
BEARING - DIAGNOSIS AND TESTING, HUB............................. 2-31,2-5
BEARING - INSTALLATION, HUB .......2-33,2-5
BEARING - OPERATION, HUB .........2-30,2-5
BEARING - REMOVAL, HUB ..........2-31,2-5
BEARING CLEARANCE - STANDARD PROCEDURE, MEASURING
CONNECTING ROD ................... 9-123
BEARING CLEARANCE USING PLASTIGAGE - STANDARD
PROCEDURE, MEASURING ..........9-12,9-86
BEARING FITTING - STANDARD PROCEDURE, MAIN ................... 9-125
BEARING PRELOAD - ADJUSTMENT, DIFFERENTIAL ...................... 21-228
BEARING PRELOAD MEASUREMENT AND ADJUSTMENT, ADJUSTMENTS -
DIFFERENTIAL ....................... 21-79
BEARINGS - INSTALLATION, CRANKSHAFT MAIN .................. 9-127
BEARINGS - REMOVAL, CRANKSHAFT MAIN .............................. 9-127
BEARINGS (IN BLOCK) - DESCRIPTION, CAMSHAFT ......................... 9-118
BEARINGS (IN BLOCK) - INSPECTION, CAMSHAFT ......................... 9-118
BEARINGS (IN BLOCK) - INSTALLATION, CAMSHAFT ......................... 9-118
BEARINGS (IN BLOCK) - OPERATION, CAMSHAFT ......................... 9-118
BEARINGS (IN BLOCK) - REMOVAL, CAMSHAFT ......................... 9-118
BELLCRANK - INSTALLATION ...........23-35
BELLCRANK - REMOVAL ...............23-35
BELT - DIAGNOSIS AND TESTING, ACCESSORY DRIVE .....................7-7
BELT - FOLD-IN-FLOOR - INSTALLATION, SEAT BELT CENTER LAP ..............23-157
BELT - FOLD-IN-FLOOR - REMOVAL, SEAT BELT CENTER LAP ..............23-157
BELT - INSTALLATION, TIMING ...........9-67
BELT - REMOVAL, TIMING ..............9-65
BELT & RETRACTOR - FIRST ROW - OUTBOARD - INSTALLATION, SEAT ......8O-40
BELT & RETRACTOR - FIRST ROW - OUTBOARD - REMOVAL, SEAT ..........8O-39
BELT & RETRACTOR - OUTBOARD - FRONT - INSTALLATION, SEAT ..........8O-39
BELT & RETRACTOR - OUTBOARD - FRONT - REMOVAL, SEAT ..............8O-38
BELT & RETRACTOR - SECOND ROW - LEFT OUTBOARD - INSTALLATION,
SEAT .............................. 8O-42
BELT & RETRACTOR - SECOND ROW - LEFT OUTBOARD - REMOVAL, SEAT .....8O-42
BELT & RETRACTOR - SECOND ROW - RIGHT OUTBOARD - INSTALLATION,
SEAT .............................. 8O-40
BELT & RETRACTOR - SECOND ROW - RIGHT OUTBOARD - REMOVAL, SEAT ....8O-40
BELT & RETRACTOR - SECOND ROW - RIGHT OUTBOARD WITH REAR HVAC -
LWB - INSTALLATION, SEAT ............8O-41
BELT & RETRACTOR - SECOND ROW - RIGHT OUTBOARD WITH REAR HVAC -
LWB - REMOVAL, SEAT ...............8O-41
BELT BUCKLE - FIRST ROW - BENCH - INSTALLATION, SEAT .................8O-37
BELT BUCKLE - FIRST ROW - BENCH - REMOVAL, SEAT ..................... 8O-36
BELT BUCKLE - FIRST ROW INBOARD - QUAD BUCKET - INSTALLATION, SEAT ....8O-36
BELT BUCKLE - FIRST ROW INBOARD - QUAD BUCKET - REMOVAL, SEAT .......8O-35
BELT BUCKLE - FRONT INBOARD - INSTALLATION, SEAT .................8O-35
BELT BUCKLE - FRONT INBOARD - REMOVAL, SEAT ..................... 8O-35
BELT BUCKLE - SECOND ROW - THREE PASSENGER BENCH - INSTALLATION,
SEAT .............................. 8O-40BELT BUCKLE - SECOND ROW - THREE
PASSENGER BENCH - REMOVAL, SEAT . . . 8O-40
BELT BUCKLE - SECOND ROW INBOARD - 50/50 BENCH - INSTALLATION, SEAT . . . 8O-38
BELT BUCKLE - SECOND ROW INBOARD - 50/50 BENCH - REMOVAL, SEAT .......8O-37
BELT CENTER LAP BELT - FOLD-IN- FLOOR - INSTALLATION, SEAT .........23-157
BELT CENTER LAP BELT - FOLD-IN- FLOOR - REMOVAL, SEAT .............23-157
BELT COVER(S) - INSTALLATION, TIMING ............................. 9-64
BELT COVER(S) - REMOVAL, TIMING ......9-63
BELT HEIGHT ADJUSTE R-BOR
C-PILLAR - INSTALLATION, SEAT ........8O-38
BELT HEIGHT ADJUSTE R-BOR
C-PILLAR - REMOVAL, SEAT ...........8O-38
BELT HEIGHT ADJUSTER KNOB - INSTALLATION, SEAT .................8O-38
BELT HEIGHT ADJUSTER KNOB - REMOVAL, SEAT ..................... 8O-38
BELT MOLDING - INSTALLATION, FRONT DOOR INNER ....................... 23-168
BELT MOLDING - INSTALLATION, FRONT DOOR OUTER ...................... 23-167
BELT MOLDING - REMOVAL, FRONT DOOR INNER ....................... 23-168
BELT MOLDING - REMOVAL, FRONT DOOR OUTER ...................... 23-167
BELT TENSION - STANDARD PROCEDURE, CHECKING POWER
STEERING ............................7-8
BELT TENSION SENSOR - DESCRIPTION . . . 8O-8
BELT TENSION SENSOR - OPERATION .....8O-9
BELT TENSION, SPECIFICATIONS - ACCESSORY DRIVE .....................7-5
BELT TENSIONER - 2.4L - INSTALLATION . . 7-11
BELT TENSIONER - 2.4L - REMOVAL ......7-11
BELT TENSIONER - 3.3/3.8L - INSTALLATION ........................ 7-12
BELT TENSIONER - 3.3/3.8L - REMOVAL . . . 7-12
BELT TENSIONER - DESCRIPTION, SEAT . . 8O-43
BELT TENSIONER - OPERATION, SEAT ....8O-43
BELT TENSIONER & PULLEY - INSTALLATION, TIMING .................9-70
BELT TENSIONER & PULLEY - REMOVAL, TIMING .................... 9-69
BELTS - 2.4L - ADJUSTMENTS, DRIVE .....7-10
BELTS - 2.4L - INSTALLATION, DRIVE ......7-9
BELTS - 2.4L - REMOVAL, DRIVE ..........7-9
BELTS - 3.3/3.8L - INSTALLATION, DRIVE . . 7-12
BELTS - 3.3/3.8L - REMOVAL, DRIVE ......7-11
BELTS - CLEANING, DRIVE ...............7-8
BELTS - INSPECTION, DRIVE .............7-8
BENCH - INSTALLATION, SEAT BACK HINGE COVERS - QUAD BUCKET, 50/50
SPLIT ............................. 23-146
BENCH - INSTALLATION, SEAT BELT BUCKLE - FIRST ROW ................8O-37
BENCH - INSTALLATION, SEAT BELT BUCKLE - SECOND ROW - THREE
PASSENGER ........................ 8O-40
BENCH - INSTALLATION, SEAT BELT BUCKLE - SECOND ROW INBOARD -
50/50 .............................. 8O-38
BENCH - INSTALLATION, SEAT CUSHION COVER - QUAD BUCKET, 50/50 SPLIT . . . 23-144
BENCH - REMOVAL, SEAT BACK HINGE COVERS - QUAD BUCKET, 50/50 SPLIT . . 23-146
BENCH - REMOVAL, SEAT BELT BUCKLE - FIRST ROW ....................... 8O-36
BENCH - REMOVAL, SEAT BELT BUCKLE - SECOND ROW - THREE PASSENGER ....8O-40
BENCH - REMOVAL, SEAT BELT BUCKLE - SECOND ROW INBOARD - 50/50 .......8O-37
BENCH - REMOVAL, SEAT CUSHION COVER - QUAD BUCKET, 50/50 SPLIT . . . 23-144
BENCH SEAT - REMOVAL, CHILD SEAT MODULE .......................... 23-104
BENCH SEAT BACK - INSTALLATION .....23-147
BENCH SEAT BACK - REMOVAL ........23-147
BENCH SEAT BACK COVER - INSTALLATION ...................... 23-148
BENCH SEAT BACK COVER - REMOVAL . . 23-148
BENCH SEAT BACK HINGE - REMOVAL . . 23-146
BENCH SEAT BACK PANEL - INSTALLATION ...................... 23-144
BENCH SEAT BACK PANEL - REMOVAL . . 23-143
RS INDEX3
Description Group-Page Description Group-Page Description Group-Page
Page 2307 of 2339

CABLE END CLEANING ANDLUBRICATION - STANDARD
PROCEDURE ......................... 5-65
CABLE RESISTANCE, SPECIFICATIONS - SPARK PLUG ......................... 8I-2
CABLES - ADJUSTMENT, PARKING BRAKE .............................. 5-65
CABLES - DESCRIPTION, BATTERY .......8F-16
CABLES - OPERATION, BATTERY ........8F-17
CABLES, DIAGNOSIS AND TESTING - BATTERY ........................... 8F-17
CALIBRATION, STANDARD PROCEDURE - A/C-HEATER CONTROL ................24-19
CALIBRATION, STANDARD PROCEDURE - COMPASS ........................... 8M-4
CALIPER - CLEANING ..............5-25,5-29
CALIPER - INSPECTION ............5-25,5-29
CALIPER - INSTALLATION, REAR DISC BRAKE .............................. 5-30
CALIPER - REMOVAL, REAR DISC BRAKE .............................. 5-28
CALIPER ADAPTER - INSTALLATION, FRONT DISC BRAKE ................... 5-31
CALIPER ADAPTER - REMOVAL, FRONT DISC BRAKE ......................... 5-31
CALIPER (CONTINENTAL TEVES BRAKES) - INSTALLATION, FRONT
DISC BRAKE ......................... 5-27
CALIPER (CONTINENTAL TEVES BRAKES) - REMOVAL, FRONT DISC
BRAKE .............................. 5-24
CALIPER GUIDE PIN BUSHINGS (CONTINENTAL TEVES BRAKES) -
ASSEMBLY ............................ 5-25
CALIPER GUIDE PIN BUSHINGS (CONTINENTAL TEVES BRAKES) -
DISASSEMBLY ........................ 5-24
CALIPER GUIDE PINS (TRW BRAKES) - INSTALLATION, DISC BRAKE ............5-32
CALIPER GUIDE PINS (TRW BRAKES) - REMOVAL, DISC BRAKE ................5-31
CALIPER PISTON AND SEAL - ASSEMBLY ...................... 5-26,5-30
CALIPER PISTON AND SEAL - DISASSEMBLY .................... 5-24,5-28
CALIPER (TRW BRAKES) - INSTALLATION, FRONT DISC BRAKE ......5-27
CALIPER (TRW BRAKES) - REMOVAL, FRONT DISC BRAKE ................... 5-24
CAMSHAFT & BEARINGS (IN BLOCK) - DESCRIPTION ....................... 9-118
CAMSHAFT & BEARINGS (IN BLOCK) - INSPECTION ........................ 9-118
CAMSHAFT & BEARINGS (IN BLOCK) - INSTALLATION ....................... 9-118
CAMSHAFT & BEARINGS (IN BLOCK) - OPERATION ......................... 9-118
CAMSHAFT & BEARINGS (IN BLOCK) - REMOVAL .......................... 9-118
CAMSHAFT END PLAY - STANDARD PROCEDURE, MEASURING ..............9-29
CAMSHAFT OIL SEAL(S) - INSTALLATION . . 9-29
CAMSHAFT OIL SEAL(S) - REMOVAL ......9-28
CAMSHAFT POSITION SENSOR - DESCRIPTION ......................... 8I-4
CAMSHAFT POSITION SENSOR - OPERATION .......................... 8I-4
CAMSHAFT SPROCKET - INSTALLATION, TIMING CHAIN ....................... 9-160
CAMSHAFT SPROCKET - REMOVAL, TIMING CHAIN ....................... 9-159
CAMSHAFT SPROCKETS - INSTALLATION . . 9-67
CAMSHAFT SPROCKETS - REMOVAL ......9-66
CAMSHAFT(S) - CLEANING ..............9-30
CAMSHAFT(S) - DESCRIPTION ...........9-29
CAMSHAFT(S) - INSPECTION ............9-30
CAMSHAFT(S) - INSTALLATION ..........9-31
CAMSHAFT(S) - OPERATION .............9-29
CAMSHAFT(S) - REMOVAL ..............9-30
CANISTER - DESCRIPTION, VAPOR ......25-19
CANISTER - INSTALLATION, REAR EVAP . . 25-21
CANISTER - OPERATION, VAPOR ........25-19
CANISTER - REMOVAL, REAR EVAP ......25-20
CAP - DESCRIPTION, FUEL FILLER .......25-13
CAP - DESCRIPTION, RADIATOR PRESSURE .......................... 7-27
CAP - INSTALLATION, INSTRUMENT PANEL RIGHT END ................... 23-72CAP - OPERATION, FUEL FILLER
........25-13
CAP - OPERATION, RADIATOR PRESSURE .......................... 7-27
CAP - REMOVAL, INSTRUMENT PANEL RIGHT END ......................... 23-72
CAP TESTING - DIAGNOSIS AND TESTING, COOLING SYSTEM
PRESSURE .......................... 7-28
CAP TO FILLER NECK SEAL - DIAGNOSIS AND TESTING, RADIATOR .....7-28
CAPACITIES - SPECIFICATIONS, FLUID ......0-6
CARE, CLEANING - WHEEL AND WHEEL TRIM .............................. 22-19
CARGO - INSTALLATION, AWD, HEAVY DUTY ............................... 2-36
CARGO - INSTALLATION, SPRING ........2-40
CARGO - REMOVAL, AWD, HEAVY DUTY . . . 2-36
CARGO - REMOVAL, SPRING ............2-40
CARPET INSERT - FOLD-IN-FLOOR - INSTALLATION, SECOND ROW FLOOR
TUB ............................... 23-98
CARPET INSERT - FOLD-IN-FLOOR - REMOVAL, SECOND ROW FLOOR TUB ....23-98
CARPET TRIM RING AND COVER - FOLD-IN-FLOOR - INSTALLATION ........23-84
CARPET TRIM RING AND COVER - FOLD-IN-FLOOR - REMOVAL ............23-84
CARPETS - FOLD-IN-FLOOR - INSTALLATION ....................... 23-83
CARPETS - FOLD-IN-FLOOR - REMOVAL . . 23-82
CARPETS AND FLOOR MATS - INSTALLATION ....................... 23-81
CARPETS AND FLOOR MATS - REMOVAL . 23-81
CARPETS INSERT - FOLD-IN-FLOOR - INSTALLATION, REAR FLOOR TUB .......23-96
CARPETS INSERT - FOLD-IN-FLOOR - REMOVAL, REAR FLOOR TUB ...........23-95
CARRIER ASSEMBLY - DESCRIPTION, BALANCE SHAFTS ..................... 9-71
CARRIER ASSEMBLY - INSTALLATION, BALANCE SHAFTS ..................... 9-73
CARRIER ASSEMBLY - OPERATION, BALANCE SHAFTS ..................... 9-71
CARRIER ASSEMBLY - REMOVAL, BALANCE SHAFTS ..................... 9-71
CATALYTIC CONVERTER - DESCRIPTION . . . 11-4
CATALYTIC CONVERTER - INSPECTION ....11-6
CATALYTIC CONVERTER - INSTALLATION . . . 11-6
CATALYTIC CONVERTER - OPERATION .....11-4
CATALYTIC CONVERTER - REMOVAL ......11-5
CAUTION, A/C SYSTEM ................24-66
CAUTION, DESCRIPTION .................5-4
CAUTION, DESCRIPTION ...............19-37
CAUTION, OPERATION .................5-90
CAUTION, SENSOR - TPM ..............22-11
CAUTIONS, WARNING - WARNINGS . 19-10,19-26
CD CHANGER - DESCRIPTION ..........8A-11
CD CHANGER - INSTALLATION ..........8A-11
CD CHANGER - OPERATION ............8A-11
CD CHANGER - REMOVAL .............8A-11
CENTER - DESCRIPTION, ELECTRONIC VEHICLE INFO ....................... 8M-7
CENTER - INSTALLATION, MESSAGE ......8M-1
CENTER - OPERATION, ELECTRONIC VEHICLE INFO ....................... 8M-7
CENTER - REMOVAL, MESSAGE .........8M-1
CENTER BEZEL - INSTALLATION, INSTRUMENT PANEL .................. 23-72
CENTER BEZEL - REMOVAL, INSTRUMENT PANEL .................. 23-71
CENTER BEZEL OUTLETS, INSTALLATION - FRONT ............................ 24-45
CENTER BEZEL OUTLETS, REMOVAL - FRONT ............................. 24-44
CENTER CONSOLE LAMP - INSTALLATION ....................... 8L-21
CENTER CONSOLE LAMP - REMOVAL ....8L-21
CENTER CONSOLE LAMP SWITCH - INSTALLATION ....................... 8L-21
CENTER CONSOLE LAMP SWITCH - REMOVAL .......................... 8L-21
CENTER, DIAGNOSIS AND TESTING - ELECTRONIC VEHICLE INFORMATION .....8M-8
CENTER HIGH MOUNTED STOP LAMP - INSTALLATION ........................ 8L-6
CENTER HIGH MOUNTED STOP LAMP - REMOVAL ........................... 8L-6CENTER HIGH MOUNTED STOP LAMP
UNIT - INSTALLATION .................. 8L-6
CENTER HIGH MOUNTED STOP LAMP UNIT - REMOVAL ..................... 8L-6
CENTER HINGE - INSTALLATION .........23-24
CENTER HINGE - REMOVAL ............23-24
CENTER LAP BELT - FOLD-IN-FLOOR - INSTALLATION, SEAT BELT ............23-157
CENTER LAP BELT - FOLD-IN-FLOOR - REMOVAL, SEAT BELT ................23-157
CENTER PROGRAMMING, STANDARD PROCEDURE - ELECTRONIC VEHICLE
INFORMATION ....................... 8M-8
CENTER STRIKER - INSTALLATION .......23-28
CENTER STRIKER - REMOVAL ..........23-28
CENTERING - STANDARD PROCEDURE, CLOCKSPRING ...................... 8O-11
CHAIN AND CAMSHAFT SPROCKET - INSTALLATION, TIMING ................9-160
CHAIN AND CAMSHAFT SPROCKET - REMOVAL, TIMING ................... 9-159
CHAIN COVER - INSTALLATION, TIMING . . 9-157
CHAIN COVER - REMOVAL, TIMING ......9-156
CHAIN WEAR - STANDARD PROCEDURE, MEASURING TIMING .................. 9-155
CHANGE - STANDARD PROCEDURE, ENGINE OIL AND FILTER ...........9-139,9-54
CHANGER - DESCRIPTION, CD ..........8A-11
CHANGER - INSTALLATION, CD .........8A-11
CHANGER - OPERATION, CD ............8A-11
CHANGER - REMOVAL, CD ..............8A-11
CHANNEL - INSTALLATION, WATER .....23-174
CHANNEL - REMOVAL, WATER .........23-174
CHARGE LEVEL TEST, DIAGNOSIS AND TESTING - SYSTEM ................... 24-67
CHARGE, STANDARD PROCEDURE - REFRIGERANT SYSTEM ...............24-71
CHARGING, STANDARD PROCEDURE - CONVENTIONAL BATTERY ..............8F-11
CHARGING, STANDARD PROCEDURE - SPIRAL PLATE BATTERY ...............8F-10
CHARGING SYSTEM - DESCRIPTION .....8F-21
CHARGING SYSTEM - OPERATION .......8F-21
CHARTS - DIAGNOSIS AND TESTING, STEERING SYSTEM DIAGNOSIS ..........19-3
CHARTS - SPECIFICATIONS, COLOR CODE ............................. 23-100
CHECK - DIAGNOSIS AND TESTING, COOLING SYSTEM FLOW ................7-3
CHECK - DIAGNOSIS AND TESTING, EXHAUST SYSTEM RESTRICTION .........11-2
CHECK - STANDARD PROCEDURE, COOLANT LEVEL .......................7-4
CHECK - STANDARD PROCEDURE, ENGINE OIL LEVEL ................... 9-140
CHECK, STANDARD PROCEDURE - ENGINE OIL LEVEL .................... 9-54
CHECK, STANDARD PROCEDURE - FLUID LEVEL AND CONDITION .........21-230,21-82
CHECK STRAP - INSTALLATION .........23-15
CHECK STRAP - REMOVAL .............23-15
CHECKING - STANDARD PROCEDURE, BRAKE FLUID LEVEL ................... 5-33
CHECKING - STANDARD PROCEDURE, POWER STEERING FLUID LEVEL ........19-44
CHECKING BATTERY ELECTROLYTE LEVEL, STANDARD PROCEDURE .........8F-14
CHECKING ENGINE OIL PRESSURE - DIAGNOSIS AND TESTING ..............9-53
CHECKING POWER STEERING BELT TENSION - STANDARD PROCEDURE .......7-8
CHILD RESTRAINT ANCHOR - DESCRIPTION ........................ 8O-9
CHILD RESTRAINT ANCHOR - OPERATION ......................... 8O-10
CHILD SEAT - INSTALLATION, QUAD ....23-106
CHILD SEAT - REMOVAL, QUAD ........23-106
CHILD SEAT MODULE, BENCH SEAT - REMOVAL ......................... 23-104
CHIME SYSTEM - DIAGNOSIS AND TESTING ............................ 8B-2
CHIME/BUZZER - DESCRIPTION ..........8B-1
CHIME/BUZZER - OPERATION ............8B-1
CHIME/BUZZER - WARNING .............8B-2
CHIME/THERMISTOR - DESCRIPTION .....8N-8
CHIME/THERMISTOR - INSTALLATION .....8N-9
CHIME/THERMISTOR - OPERATION .......8N-8
CHIME/THERMISTOR - REMOVAL ........8N-8
6 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2310 of 2339

COVER - RIGHT - INSTALLATION,CYLINDER HEAD ..................... 9-106
COVER - RIGHT - REMOVAL, CYLINDER HEAD .............................. 9-106
COVER/FOAM - SECOND ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT
BACK ............................. 23-133
COVER/FOAM - SECOND ROW - FOLD-IN-FLOOR - REMOVAL, SEAT
BACK ............................. 23-133
COVER/FOAM - THIRD ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT
BACK ............................. 23-156
COVER/FOAM - THIRD ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT
CUSHION .......................... 23-159
COVER/FOAM - THIRD ROW - FOLD-IN-FLOOR - REMOVAL, SEAT
BACK ............................. 23-155
COVER/FOAM - THIRD ROW - FOLD-IN-FLOOR - REMOVAL, SEAT
CUSHION .......................... 23-159
COVER/FOAM -SECOND ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT
CUSHION .......................... 23-136
COVER/FOAM -SECOND ROW - FOLD-IN-FLOOR - REMOVAL, SEAT
CUSHION .......................... 23-136
COVER(S) - DESCRIPTION, CYLINDER HEAD .............................. 9-105
COVER(S) - INSTALLATION, TIMING BELT ............................... 9-64
COVERS - QUAD BUCKET, 50/50 SPLIT, BENCH - INSTALLATION, SEAT BACK
HINGE ............................ 23-146
COVERS - QUAD BUCKET, 50/50 SPLIT, BENCH - REMOVAL, SEAT BACK HINGE. . . 23-146
COVER(S) - REMOVAL, TIMING BELT ......9-63
COWL GRILLE - INSTALLATION .........23-50
COWL GRILLE - REMOVAL .............23-50
COWL TRIM - INSTALLATION ...........23-88
COWL TRIM - REMOVAL ...............23-88
C-PILLAR - INSTALLATION, SEAT BELT HEIGHT ADJUSTE R-BOR............. 8O-38
C-PILLAR - REMOVAL, SEAT BELT HEIGHT ADJUSTE R-BOR............. 8O-38
C-PILLAR TRIM - INSTALLATION ........23-88
C-PILLAR TRIM - REMOVAL ............23-88
CRADLE CROSSMEMBER - DESCRIPTION, FRONT .................13-14
CRADLE CROSSMEMBER THREAD REPAIR - DESCRIPTION, FRONT .........13-14
CRANK - INSTALLATION, WINDOW .......23-21
CRANK - REMOVAL, WINDOW ..........23-21
CRANKSHAFT - INSPECTION .............9-38
CRANKSHAFT - INSTALLATION ...........9-39
CRANKSHAFT - REMOVAL ..............9-37
CRANKSHAFT END PLAY - STANDARD PROCEDURE ......................... 9-37
CRANKSHAFT END PLAY - STANDARD PROCEDURE, MEASURING .............9-128
CRANKSHAFT MAIN BEARINGS - INSTALLATION ....................... 9-127
CRANKSHAFT MAIN BEARINGS - REMOVAL .......................... 9-127
CRANKSHAFT OIL SEAL - FRONT - INSTALLATION ................... 9-130,9-42
CRANKSHAFT OIL SEAL - FRONT - REMOVAL ...................... 9-130,9-41
CRANKSHAFT OIL SEAL - REAR - INSTALLATION ................... 9-131,9-42
CRANKSHAFT OIL SEAL - REAR - REMOVAL ...................... 9-131,9-42
CRANKSHAFT POSITION SENSOR - DESCRIPTION ....................... 14-29
CRANKSHAFT POSITION SENSOR - OPERATION ......................... 14-29
CRANKSHAFT POSITION SENSOR - REMOVAL .......................... 14-30
CRANKSHAFT REAR OIL SEAL RETAINER - INSTALLATION ..................... 9-132
CRANKSHAFT REAR OIL SEAL RETAINER - REMOVAL ......................... 9-132
CRANKSHAFT SPROCKET - INSTALLATION ................... 9-160,9-67
CRANKSHAFT SPROCKET - REMOVAL ....9-159,
9-66 CROSSBAR - INSTALLATION, LUGGAGE
RACK .............................. 23-59
CROSSBAR - REMOVAL, LUGGAGE RACK . 23-58
CROSSMEMBER - DESCRIPTION, FRONT CRADLE ............................ 13-14
CROSSMEMBER - INSTALLATION, UPPER RADIATOR .................... 23-56
CROSSMEMBER - REMOVAL, UPPER RADIATOR .......................... 23-56
CROSSMEMBER MOUNT BUSHINGS - INSTALLATION, FRONT ................13-17
CROSSMEMBER MOUNT BUSHINGS - REMOVAL, FRONT .................... 13-17
CROSSMEMBER THREAD REPAIR - DESCRIPTION, FRONT CRADLE .........13-14
CROSS-OVER PIPE - 3.3/3.8L - INSTALLATION ........................ 11-6
CROSS-OVER PIPE - 3.3/3.8L - REMOVAL ........................... 11-6
CUP HOLDER - FOLD-IN-FLOOR - INSTALLATION, SIDE SHIELD ..........23-160
CUP HOLDER - FOLD-IN-FLOOR - REMOVAL, SIDE SHIELD ..............23-160
CUP HOLDER - INSTALLATION ..........23-65
CUP HOLDER - INSTALLATION, QUAD BUCKET SEAT SIDE SHIELD - NO .......23-143
CUP HOLDER - REMOVAL ..............23-65
CUP HOLDER - REMOVAL, QUAD BUCKET SEAT SIDE SHIELD - NO .......23-143
CURB HEIGHT MEASUREMENT - STANDARD PROCEDURE ................2-55
CURTAIN AIRBAG - DESCRIPTION .......8O-12
CURTAIN AIRBAG - INSTALLATION .......8O-16
CURTAIN AIRBAG - OPERATION .........8O-13
CURTAIN AIRBAG - REMOVAL ..........8O-14
CUSHION - INSTALLATION, FRONT SEAT . 23-118
CUSHION - INSTALLATION, QUAD SEAT . . 23-141
CUSHION - INSTALLATION, STABILIZER BAR.................................2-4
CUSHION - OCS - INSTALLATION, FRONT SEAT ............................. 23-120
CUSHION - OCS - REMOVAL, FRONT SEAT ............................. 23-119
CUSHION - REMOVAL, FRONT SEAT .....23-117
CUSHION - REMOVAL, QUAD SEAT .....23-141
CUSHION - REMOVAL, STABILIZER BAR ....2-4
CUSHION COVER - QUAD BUCKET, 50/50 SPLIT, BENCH - INSTALLATION, SEAT . . . 23-144
CUSHION COVER - QUAD BUCKET, 50/50 SPLIT, BENCH - REMOVAL, SEAT .......23-144
CUSHION COVER/FOAM - THIRD ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT . . 23-159
CUSHION COVER/FOAM - THIRD ROW - FOLD-IN-FLOOR - REMOVAL, SEAT ......23-159
CUSHION COVER/FOAM -SECOND ROW - FOLD-IN-FLOOR - INSTALLATION, SEAT . . 23-136
CUSHION COVER/FOAM -SECOND ROW - FOLD-IN-FLOOR - REMOVAL, SEAT ......23-136
CUSHION PAN PANEL-THIRD ROW - FOLD-IN-FLOOR - INSTALLATION,
BOTTOM OF SEAT ................... 23-152
CUSHION PAN PANEL-THIRD ROW - FOLD-IN-FLOOR - REMOVAL, BOTTOM
OF SEAT........................... 23-152
CUSHION SIDE COVER - INSTALLATION, FRONT SEAT ....................... 23-121
CUSHION SIDE COVER - OCS - INSTALLATION, FRONT SEAT ..........23-122
CUSHION SIDE COVER - OCS - REMOVAL, FRONT SEAT ..............23-121
CUSHION SIDE COVER - REMOVAL, FRONT SEAT ....................... 23-120
CUSHION SIDE SHIELD - SECOND ROW - FOLD-IN-FLOOR - INSTALLATION,
SEAT ............................. 23-138
CUSHION SIDE SHIELD - SECOND ROW - FOLD-IN-FLOOR - REMOVAL, SEAT ....23-138
CV BOOT - INNER - INSTALLATION ........3-7
CV BOOT - INNER - REMOVAL ............3-6
CV BOOT - OUTER - INSTALLATION .......3-11
CV BOOT - OUTER - REMOVAL ...........3-10
CYCLE, STANDARD PROCEDURE - POWER LIFTGATE LEARN ...............8N-8
CYCLE, STANDARD PROCEDURE - POWER SLIDING DOOR LEARN .........8N-48
CYLINDER - DESCRIPTION, KEY/LOCK ....19-20
CYLINDER - DESCRIPTION, STANDARD 4 . . . 8I-9
CYLINDER - INSTALLATION, KEY/LOCK . . . 19-20CYLINDER - INSTALLATION, LOCK . . 23-19,23-42
CYLINDER - INSTALLATION, SUPPORT
....23-43
CYLINDER - OPERATION, KEY/LOCK ......19-20
CYLINDER - REMOVAL, KEY/LOCK .......19-20
CYLINDER - REMOVAL, LOCK ......23-19,23-42
CYLINDER - REMOVAL, SUPPORT .......23-42
CYLINDER BLEEDING - STANDARD PROCEDURE, MASTER .................5-36
CYLINDER BORE FITTING - STANDARD PROCEDURE, PISTON TO ...............9-44
CYLINDER BORE HONING - STANDARD PROCEDURE .................... 9-115,9-36
CYLINDER COMBUSTION PRESSURE LEAKAGE TEST - DIAGNOSIS AND
TESTING ......................... 9-85,9-9
CYLINDER COMPRESSION PRESSURE TEST - DIAGNOSIS AND TESTING .....9-85,9-9
CYLINDER (FLUID RESERVOIR) - ASSEMBLY, MASTER ................... 5-39
CYLINDER (FLUID RESERVOIR) - DISASSEMBLY, MASTER ................5-38
CYLINDER HEAD - CLEANING .......9-103,9-26
CYLINDER HEAD - DESCRIPTION ....9-102,9-25
CYLINDER HEAD - INSPECTION .....9-104,9-27
CYLINDER HEAD - INSTALLATION . . . 9-104,9-27
CYLINDER HEAD - REMOVAL .......9-103,9-26
CYLINDER HEAD COVER - CLEANING ......9-31
CYLINDER HEAD COVER - INSPECTION ....9-31
CYLINDER HEAD COVER - INSTALLATION ......................... 9-32
CYLINDER HEAD COVER - LEFT - INSTALLATION ....................... 9-107
CYLINDER HEAD COVER - LEFT - REMOVAL .......................... 9-107
CYLINDER HEAD COVER - REMOVAL ......9-31
CYLINDER HEAD COVER - RIGHT - INSTALLATION ....................... 9-106
CYLINDER HEAD COVER - RIGHT - REMOVAL .......................... 9-106
CYLINDER HEAD COVER(S) - DESCRIPTION ....................... 9-105
CYLINDER HEAD GASKET - DIAGNOSIS AND TESTING ................... 9-102,9-25
CYLINDER HEAD OFF - INSTALLATION . . . 9-111, 9-33
CYLINDER HEAD OFF - REMOVAL . . . 9-109,9-33
CYLINDER HEAD ON - INSTALLATION ....9-111,
9-33
CYLINDER HEAD ON - REMOVAL ....9-111,9-33
CYLINDER LOCK SWITCH - EXPORT - DESCRIPTION, DOOR .................8N-22
CYLINDER LOCK SWITCH - EXPORT - OPERATION, DOOR ................... 8N-22
CYLINDER LOCK SWITCH, EXPORT - DOOR ............................. 8N-22
CYLINDERS - INSPECTION, WHEEL .......5-62
CYLINDERS - INSTALLATION, WHEEL .....5-62
CYLINDERS - REMOVAL, WHEEL .........5-62
DAMAGED OR WORN THREADS - STANDARD PROCEDURE, REPAIR OF . . 9-10,9-88
DAMPER - INSTALLATION, VIBRATION . . . 9-132, 9-49
DAMPER - REMOVAL, VIBRATION . . . 9-132,9-48
DATA BUS COMMUNICATION RECEIVE - PCM INPUT - OPERATION ..............8E-14
DATA LINK CONNECTOR - DESCRIPTION . . . 8E-6
DATA LINK CONNECTOR - OPERATION .....8E-6
DAY / NIGHT MIRROR - DESCRIPTION, AUTOMATIC ........................ 8N-28
DAY / NIGHT MIRROR - OPERATION, AUTOMATIC ........................ 8N-28
DAY / NIGHT MIRROR, DIAGNOSIS AND TESTING - AUTOMATIC ................8N-28
DEAERATION - DIAGNOSIS AND TESTING, COOLING SYSTEM .............7-4
DECOUPLER PULLEY - DESCRIPTION, GENERATOR ........................ 8F-28
DECOUPLER PULLEY - DIAGNOSIS AND TESTING, GENERATOR ................8F-28
DECOUPLER PULLEY - INSTALLATION, GENERATOR ........................ 8F-29
DECOUPLER PULLEY - OPERATION, GENERATOR ........................ 8F-28
DECOUPLER PULLEY - REMOVAL, GENERATOR ........................ 8F-29
DEFINITION, DESCRIPTION - TRIP ........25-1
DEFLECTOR - INSTALLATION, WIND .....23-174
DEFLECTOR - REMOVAL, WIND ........23-174
RS INDEX9
Description Group-Page Description Group-Page Description Group-Page
Page 2321 of 2339

LWB - INSTALLATION, SEAT BELT &RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR HVAC ..........8O-41
LWB - REMOVAL, SEAT BELT & RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR HVAC ..........8O-41
MACHINING - STANDARD PROCEDURE, BRAKE ROTOR ....................... 5-58
MAIN BEARING FITTING - STANDARD PROCEDURE ........................ 9-125
MAIN BEARINGS - INSTALLATION, CRANKSHAFT ....................... 9-127
MAIN BEARINGS - REMOVAL, CRANKSHAFT ....................... 9-127
MANAGER - DESCRIPTION, TASK ........25-25
MANAGER - OPERATION, TASK .........25-25
MANIFOLD - CLEANING, EXHAUST ........9-63
MANIFOLD - DESCRIPTION, INTAKE . . 9-147,9-60
MANIFOLD - INSPECTION, EXHAUST ......9-63
MANIFOLD - INSTALLATION, EXHAUST ....9-63
MANIFOLD - INSTALLATION, LOWER INTAKE ............................ 9-151
MANIFOLD - INSTALLATION, UPPER INTAKE ............................ 9-149
MANIFOLD - LEFT - CLEANING, EXHAUST ........................... 9-154
MANIFOLD - LEFT - INSPECTION, EXHAUST ........................... 9-155
MANIFOLD - LEFT - INSTALLATION, EXHAUST ........................... 9-155
MANIFOLD - LEFT - REMOVAL, EXHAUST . 9-154
MANIFOLD - LOWER - CLEANING, INTAKE ............................ 9-151
MANIFOLD - LOWER - INSPECTION, INTAKE ........................ 9-151,9-62
MANIFOLD - LOWER - INSTALLATION, INTAKE ............................. 9-62
MANIFOLD - LOWER - REMOVAL, INTAKE ............................. 9-62
MANIFOLD - REMOVAL, EXHAUST ........9-63
MANIFOLD - REMOVAL, LOWER INTAKE . . 9-150
MANIFOLD - REMOVAL, UPPER INTAKE . . . 9-148
MANIFOLD - RIGHT - CLEANING, EXHAUST ........................... 9-153
MANIFOLD - RIGHT - INSPECTION, EXHAUST ........................... 9-153
MANIFOLD - RIGHT - INSTALLATION, EXHAUST ........................... 9-153
MANIFOLD - RIGHT - REMOVAL, EXHAUST ........................... 9-152
MANIFOLD - UPPER - INSPECTION, INTAKE ............................. 9-61
MANIFOLD - UPPER - INSTALLATION, INTAKE ............................. 9-61
MANIFOLD - UPPER - REMOVAL, INTAKE . . 9-60
MANIFOLD LEAKS - DIAGNOSIS AND TESTING, INTAKE ................ 9-147,9-60
MANIFOLD STRIPPED THREAD REPAIR - STANDARD PROCEDURE ...............9-147
MANIFOLD VACUUM PORT REPAIR - STANDARD PROCEDURE, INTAKE ........9-148
MANUAL - INSTALLATION, WINDOW REGULATOR ........................ 23-23
MANUAL - OCS - INSTALLATION, FRONT SEAT RISER ........................ 23-123
MANUAL - OCS - REMOVAL, FRONT SEAT RISER ........................ 23-123
MANUAL - REMOVAL, WINDOW REGULATOR ........................ 23-22
MANUAL ADJUSTER - INSTALLATION, FRONT SEAT TRACK .................23-126
MANUAL ADJUSTER - REMOVAL, FRONT SEAT TRACK ....................... 23-125
MANUAL DUAL ZONE, DESCRIPTION ......24-2
MANUAL DUAL ZONE, OPERATION ........24-5
MANUAL SINGLE ZONE, DESCRIPTION ....24-2
MANUAL SINGLE ZONE, OPERATION ......24-4
MANUAL TEMPERATURE CONTROL SYSTEM, OPERATION ................24-113
MANUAL THREE ZONE, DESCRIPTION .....24-2
MANUAL THREE ZONE, OPERATION .......24-5
MAP SENSOR - DESCRIPTION ..........14-34
MAP SENSOR - OPERATION ............14-34
MASTER CYLINDER BLEEDING - STANDARD PROCEDURE ................5-36
MASTER CYLINDER (FLUID RESERVOIR) - ASSEMBLY ......................... 5-39MASTER CYLINDER (FLUID RESERVOIR)
- DISASSEMBLY ...................... 5-38
MATCH MOUNTING - STANDARD PROCEDURE, TIRE AND WHEEL ..........22-7
MATS - INSTALLATION, CARPETS AND FLOOR ............................. 23-81
MATS - REMOVAL, CARPETS AND FLOOR ............................. 23-81
MEASUREMENT - STANDARD PROCEDURE, CURB HEIGHT .............2-55
MEASUREMENT AND ADJUSTMENT, ADJUSTMENTS - DIFFERENTIAL
BEARING PRELOAD ................... 21-79
MEASUREMENTS - SPECIFICATIONS, GAP AND FLUSH .................... 23-177
MEASURING BEARING CLEARANCE USING PLASTIGAGE - STANDARD
PROCEDURE ..................... 9-12,9-86
MEASURING CAMSHAFT END PLAY - STANDARD PROCEDURE ................9-29
MEASURING CONNECTING ROD BEARING CLEARANCE - STANDARD
PROCEDURE ........................ 9-123
MEASURING CRANKSHAFT END PLAY - STANDARD PROCEDURE ...............9-128
MEASURING TIMING CHAIN WEAR - STANDARD PROCEDURE ...............9-155
MECHANICAL - DIAGNOSIS AND TESTING, ENGINE DIAGNOSIS ........9-6,9-82
MECHANISM -SECOND ROW -FOLD-IN- FLOOR - INSTALLATION, SEAT
RECLINER/FORWARD FOLDING ........23-137
MECHANISM -SECOND ROW -FOLD-IN- FLOOR - REMOVAL, SEAT RECLINER/
FORWARD FOLDING .................23-137
MECHANISM -THIRD ROW -FOLD-IN- FLOOR - INSTALLATION, SEAT
RECLINER/FOLD FORWARD ...........23-160
MECHANISM -THIRD ROW -FOLD-IN- FLOOR - REMOVAL, SEAT RECLINER/
FOLD FORWARD .................... 23-160
MEMORIES, OPERATION - FUEL CORRECTION OR ADAPTIVE ............14-24
MEMORY SEAT/MIRROR MODULE - DESCRIPTION ........................ 8E-9
MEMORY SEAT/MIRROR MODULE - OPERATION .......................... 8E-9
MEMORY SEAT/MIRROR MODULE, DIAGNOSIS AND TESTING ..............8E-9
MEMORY SWITCH - DESCRIPTION ......8N-36
MEMORY SWITCH - OPERATION ........8N-36
MEMORY SWITCH, DIAGNOSIS AND TESTING ........................... 8N-37
MEMORY SYSTEM, DESCRIPTION .......8N-32
MEMORY SYSTEM, DIAGNOSIS AND TESTING ........................... 8N-33
MEMORY SYSTEM, OPERATION .........8N-33
MESSAGE CENTER - INSTALLATION ......8M-1
MESSAGE CENTER - REMOVAL ..........8M-1
MICRO 420 BATTERY TESTER, STANDARD PROCEDURE ...............8F-15
MINI-TRIP COMPUTER, DIAGNOSIS AND TESTING - COMPASS .................8M-10
MIRROR - DESCRIPTION, AUTOMATIC DAY / NIGHT ........................ 8N-28
MIRROR - INSTALLATION, GLASS- OUTSIDE REARVIEW .................. 23-61
MIRROR - INSTALLATION, REAR VIEW . . . 23-97
MIRROR - INSTALLATION, SIDE VIEW ....23-60
MIRROR - OPERATION, AUTOMATIC DAY / NIGHT ............................ 8N-28
MIRROR - REMOVAL, GLASS-OUTSIDE REARVIEW .......................... 23-61
MIRROR - REMOVAL, REAR VIEW .......23-97
MIRROR - REMOVAL, SIDE VIEW ........23-60
MIRROR - REMOVAL, SIDEVIEW ........8N-30
MIRROR, DIAGNOSIS AND TESTING - AUTOMATIC DAY / NIGHT ..............8N-28
MIRROR SWITCH - EXPORT - DESCRIPTION, POWER FOLDAWAY ......8N-29
MIRROR SWITCH - EXPORT - INSTALLATION, POWER FOLDAWAY ......8N-30
MIRROR SWITCH - EXPORT - OPERATION, POWER FOLDAWAY ........8N-29
MIRROR SWITCH - EXPORT - REMOVAL, POWER FOLDAWAY .................. 8N-29
MIRRORS - DESCRIPTION, HEATED .......8G-6
MIRRORS - DESCRIPTION, POWER ......8N-26 MIRRORS - OPERATION, HEATED
........8G-6
MIRRORS - OPERATION, POWER ........8N-26
MIRRORS, DIAGNOSIS AND TESTING - POWER ............................ 8N-27
MODE DOOR ACTUATOR - DESCRIPTION . . 24-29
MODE DOOR ACTUATOR - INSTALLATION ....................... 24-30
MODE DOOR ACTUATOR - OPERATION . . . 24-29
MODE DOOR ACTUATOR - REAR - DESCRIPTION ....................... 24-39
MODE DOOR ACTUATOR - REAR - INSTALLATION ....................... 24-40
MODE DOOR ACTUATOR - REAR - OPERATION ......................... 24-39
MODE DOOR ACTUATOR - REAR - REMOVAL .......................... 24-39
MODE DOOR ACTUATOR - REMOVAL .....24-29
MODE, OPERATION - DRB III TS TAT E
DISPLAY TEST ....................... 25-10
MODELS, INSTALLATION - RG ..........24-27
MODELS, INSTALLATION - RS ..........24-28
MODELS, REMOVAL - RG ..............24-27
MODELS, REMOVAL - RS ..............24-27
MODES OF OPERATION - OPERATION ....14-22
MODULE - BLOWER MOTOR - DESCRIPTION, POWER ................24-30
MODULE - BLOWER MOTOR - INSTALLATION, POWER ...............24-31
MODULE - BLOWER MOTOR - OPERATION, POWER .................. 24-30
MODULE - BLOWER MOTOR - REMOVAL, POWER ................... 24-30
MODULE - DESCRIPTION, BODY CONTROL ........................... 8E-2
MODULE - DESCRIPTION, FRONT CONTROL ........................... 8E-7
MODULE - DESCRIPTION, FUEL PUMP ....14-8
MODULE - DESCRIPTION, HEATED SEAT . . . 8E-8
MODULE - DESCRIPTION, INTEGRATED POWER ..........................8W -97-1
MODULE - DESCRIPTION, MEMORY SEAT/MIRROR ........................ 8E-9
MODULE - DESCRIPTION, OCCUPANT CLASSIFICATION ..................... 8O-25
MODULE - DESCRIPTION, PARK ASSIST . . . 8B-4
MODULE - DESCRIPTION, POWER LIFTGATE CONTROL .................. 8E-10
MODULE - DESCRIPTION, SENTRY KEY REMOTE ENTRY ...................... 8Q-3
MODULE - DESCRIPTION, SLIDING DOOR CONTROL ..................... 8E-18
MODULE - DIAGNOSIS AND TESTING, SENTRY KEY REMOTE ENTRY ...........8Q-5
MODULE - EXPORT - DESCRIPTION, ANTENNA .......................... 8A-10
MODULE - EXPORT - OPERATION, ANTENNA .......................... 8A-10
MODULE - INSTALLATION, BODY CONTROL ........................... 8E-4
MODULE - INSTALLATION, HANDS FREE . . . 8T-3
MODULE - INSTALLATION, INTEGRATED POWER ..........................8W -97-2
MODULE - INSTALLATION, OCCUPANT CLASSIFICATION ..................... 8O-26
MODULE - INSTALLATION, PARK ASSIST . . 8B-6
MODULE - INSTALLATION, SENTRY KEY REMOTE ENTRY ...................... 8Q-6
MODULE - INSTALLATION, WIPER .......8R-14
MODULE - OPERATION, BODY CONTROL . . . 8E-3
MODULE - OPERATION, FRONT CONTROL ........................... 8E-7
MODULE - OPERATION, FUEL PUMP ......14-9
MODULE - OPERATION, HEATED SEAT .....8E-8
MODULE - OPERATION, INTEGRATED POWER ..........................8W -97-2
MODULE - OPERATION, MEMORY SEAT/MIRROR ........................ 8E-9
MODULE - OPERATION, OCCUPANT CLASSIFICATION ..................... 8O-25
MODULE - OPERATION, PARK ASSIST .....8B-5
MODULE - OPERATION, POWER LIFTGATE CONTROL .................. 8E-10
MODULE - OPERATION, SENTRY KEY REMOTE ENTRY ...................... 8Q-4
MODULE - OPERATION, SLIDING DOOR CONTROL .......................... 8E-18
MODULE - REAR BLOWER MOTOR - DESCRIPTION, POWER ................24-40
20 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
Page 2325 of 2339

POWER MODULE - INSTALLATION,INTEGRATED ......................8W -97-2
POWER MODULE - OPERATION, INTEGRATED ......................8W -97-2
POWER MODULE - REAR BLOWER MOTOR - DESCRIPTION ...............24-40
POWER MODULE - REAR BLOWER MOTOR - INSTALLATION ...............24-41
POWER MODULE - REAR BLOWER MOTOR - OPERATION .................24-40
POWER MODULE - REAR BLOWER MOTOR - REMOVAL .................. 24-41
POWER MODULE - REMOVAL, INTEGRATED ......................8W -97-2
POWER OUTLET - DESCRIPTION ......8W-97-3
POWER OUTLET - DIAGNOSIS & TESTING .........................8W -97-3
POWER OUTLET - OPERATION ........8W-97-3
POWER SEAT SYSTEM, DESCRIPTION ....8N-31
POWER SEAT SYSTEM, DIAGNOSIS AND TESTING ........................... 8N-33
POWER SEAT SYSTEM, OPERATION .....8N-32
POWER SEAT TRACK - DESCRIPTION ....8N-37
POWER SEAT TRACK - OPERATION ......8N-38
POWER SEAT TRACK, DIAGNOSIS AND TESTING ........................... 8N-38
POWER SLIDING DOOR ADJUSTMENT, STANDARD PROCEDURE ..............8N-49
POWER SLIDING DOOR LEARN CYCLE, STANDARD PROCEDURE ..............8N-48
POWER SLIDING DOOR SYSTEM - DESCRIPTION ........................ 8N-40
POWER SLIDING DOOR SYSTEM - OPERATION ......................... 8N-41
POWER SLIDING DOOR SYSTEM, DIAGNOSIS AND TESTING .............8N-42
POWER STEERING BELT TENSION - STANDARD PROCEDURE, CHECKING .......7-8
POWER STEERING FASTENER TORQUE, SPECIFICATIONS ...................... 19-9
POWER STEERING FLUID LEVEL CHECKING - STANDARD PROCEDURE ....19-44
POWER STEERING GEAR, SPECIAL TOOLS ............................. 19-34
POWER STEERING PUMP INITIAL OPERATION - STANDARD PROCEDURE . . . 19-37
POWER STEERING PUMP, SPECIAL TOOLS ............................. 19-44
POWER STEERING, SPECIAL TOOLS ......19-9
POWER STEERING SYSTEM - DESCRIPTION ........................ 19-1
POWER STEERING SYSTEM - OPERATION .......................... 19-1
POWER STEERING SYSTEM FLOW AND PRESSURE TEST - DIAGNOSIS AND
TESTING ............................ 19-1
POWER TRANSFER UNIT FLUID - DESCRIPTION, AWD ....................0-6
POWER WINDOWS - DESCRIPTION ......8N-61
POWER WINDOWS - OPERATION ........8N-61
POWER WINDOWS, DIAGNOSIS AND TESTING ........................... 8N-61
POWERING SEVERAL LOADS - STANDARD PROCEDURE, TESTING
FOR A SHORT TO GROUND ON FUSES . 8W-01-10
PRELOAD - ADJUSTMENT, DIFFERENTIAL BEARING ..............21-228
PRELOAD MEASUREMENT AND ADJUSTMENT, ADJUSTMENTS -
DIFFERENTIAL BEARING ...............21-79
PREPARATION - STANDARD PROCEDURE, ENGINE GASKET
SURFACE ........................ 9-11,9-87
PRESSURE - DIAGNOSIS AND TESTING, CHECKING ENGINE OIL .................9-53
PRESSURE - DIAGNOSIS AND TESTING, ENGINE OIL ......................... 9-138
PRESSURE CAP - DESCRIPTION, RADIATOR ........................... 7-27
PRESSURE CAP - OPERATION, RADIATOR ........................... 7-27
PRESSURE CAP TESTING - DIAGNOSIS AND TESTING, COOLING SYSTEM ........7-28
PRESSURE FOR HIGH SPEED OPERATION - STANDARD PROCEDURE,
TIRE ............................... 22-17
PRESSURE GAUGE - STANDARD PROCEDURE, FUEL .................... 14-3PRESSURE LEAKAGE TEST - DIAGNOSIS
AND TESTING, CYLINDER
COMBUSTION ..................... 9-85,9-9
PRESSURE MONITORING - DESCRIPTION, TIRE ................... 22-9
PRESSURE MONITORING - OPERATION, TIRE ............................... 22-10
PRESSURE REGULATOR - INSTALLATION, FUEL .................. 14-7
PRESSURE REGULATOR - OPERATION, FUEL ............................... 14-7
PRESSURE REGULATOR - REMOVAL, FUEL ............................... 14-7
PRESSURE RELEASE PROCEDURE - STANDARD PROCEDURE, FUEL
SYSTEM ............................ 14-2
PRESSURE RELIEF VALVE - INSTALLATION, OIL ................... 9-144
PRESSURE RELIEF VALVE - REMOVAL, OIL................................ 9-143
PRESSURE RELIEF VALVE, DESCRIPTION - HIGH ............................. 24-72
PRESSURE RELIEF VALVE, OPERATION - HIGH .............................. 24-72
PRESSURE SENSOR - DESCRIPTION, SEAT WEIGHT BLADDER ...............8O-43
PRESSURE SENSOR - DIAGNOSIS AND TESTING, TIRE ...................... 22-11
PRESSURE SENSOR - OPERATION, SEAT WEIGHT BLADDER ................... 8O-44
PRESSURE, SPECIFICATIONS - FUEL SYSTEM ............................ 14-4
PRESSURE SWITCH - DESCRIPTION, OIL . 9-144
PRESSURE SWITCH - INSTALLATION, OIL ........................... 9-144,9-56
PRESSURE SWITCH - OPERATION, OIL . . . 9-144
PRESSURE SWITCH - REMOVAL, OIL ....9-144,
9-56
PRESSURE TEST - DIAGNOSIS AND TESTING, CYLINDER COMPRESSION . . . 9-85,9-9
PRESSURE TEST - DIAGNOSIS AND TESTING, POWER STEERING SYSTEM
FLOW ............................... 19-1
PRESSURE TESTS - DIAGNOSIS AND TESTING, CLUTCH AIR ...........21-153,21-8
PRESSURE TESTS - DIAGNOSIS AND TESTING, HYDRAULIC ............21-150,21-6
PRESSURE TRANSDUCER - DESCRIPTION, A/C ................... 24-20
PRESSURE TRANSDUCER - OPERATION, A/C................................ 24-20
PRESSURE TRANSDUCER, DIAGNOSIS AND TESTING - A/C ................... 24-21
PRESSURES - STANDARD PROCEDURE, TIRE INFLATION ..................... 22-16
PROGRAMMABLE COMMUNICATIONS INTERFACE (PCI) BUS, OPERATION ......14-25
PROGRAMMING - STANDARD PROCEDURE, PCM/SKIM ................8E-1
PROGRAMMING - STANDARD PROCEDURE, REMOTE KEYLESS
ENTRY TRANSMITTER ................8N-24
PROGRAMMING - STANDARD PROCEDURE, TRANSPONDER ...........8Q-6
PROGRAMMING, STANDARD PROCEDURE - ELECTRONIC VEHICLE
INFORMATION CENTER ................8M-8
PROP ROD - SECOND ROW - FOLD-IN- FLOOR - INSTALLATION, SEAT .........23-140
PROP ROD - SECOND ROW - FOLD-IN- FLOOR - REMOVAL, SEAT .............23-139
PROPORTIONING - DESCRIPTION, ELECTRONIC VARIABLE BRAKE ..........5-88
PROPORTIONING - OPERATION, ELECTRONIC VARIABLE BRAKE ..........5-89
PROPORTIONING VALVE (HEIGHT SENSING) - DESCRIPTION ..............5-53
PROPORTIONING VALVE (HEIGHT SENSING) - DIAGNOSIS AND TESTING .....5-54
PROPORTIONING VALVE (HEIGHT SENSING) - INSTALLATION ..............5-55
PROPORTIONING VALVE (HEIGHT SENSING) - OPERATION ................5-53
PROPORTIONING VALVE (HEIGHT SENSING) - REMOVAL .................5-55
PULLEY - DESCRIPTION, GENERATOR DECOUPLER ........................ 8F-28PULLEY - DIAGNOSIS AND TESTING,
GENERATOR DECOUPLER ..............8F-28
PULLEY - INSTALLATION, GENERATOR DECOUPLER ........................ 8F-29
PULLEY - INSTALLATION, TIMING BELT TENSIONER .......................... 9-70
PULLEY - OPERATION, GENERATOR DECOUPLER ........................ 8F-28
PULLEY - REMOVAL, GENERATOR DECOUPLER ........................ 8F-29
PULLEY - REMOVAL, TIMING BELT TENSIONER .......................... 9-69
PUMP - 2.4L - CLEANING, WATER ........7-32
PUMP - 2.4L - DESCRIPTION, WATER .....7-32
PUMP - 2.4L - INSPECTION, WATER ......7-32
PUMP - 2.4L - INSTALLATION, WATER .....7-32
PUMP - 2.4L - REMOVAL, WATER ........7-32
PUMP - 3.3/3.8L - CLEANING, WATER .....7-35
PUMP - 3.3/3.8L - DESCRIPTION, WATER ............................. 7-34
PUMP - 3.3/3.8L - INSPECTION, WATER . . . 7-35
PUMP - 3.3/3.8L - INSTALLATION, WATER ............................. 7-35
PUMP - 3.3/3.8L - REMOVAL, WATER .....7-34
PUMP - ASSEMBLY, OIL ...........9-146,9-58
PUMP - ASSEMBLY, OIL ........21-112,21-263
PUMP - CLEANING, OIL ...........9-145,9-57
PUMP - DESCRIPTION, FUEL ............14-8
PUMP - DESCRIPTION, FUEL DOSING . . . 24-117
PUMP - DESCRIPTION, OIL .............9-144
PUMP - DESCRIPTION, OIL ......21-110,21-261
PUMP - DISASSEMBLY, OIL ........9-145,9-57
PUMP - DISASSEMBLY, OIL .....21-110,21-261
PUMP - INSPECTION, OIL ..........9-145,9-58
PUMP - INSTALLATION, FUEL DOSING . . . 24-117
PUMP - INSTALLATION, LEAK DETECTION ......................... 25-15
PUMP - INSTALLATION, OIL ........9-146,9-59
PUMP - INSTALLATION, SEAL - OIL ....21-113,
21-264
PUMP - OPERATION, FUEL ..............14-8
PUMP - OPERATION, FUEL DOSING .....24-117
PUMP - OPERATION, OIL .......21-110,21-261
PUMP - REMOVAL, FUEL DOSING ......24-117
PUMP - REMOVAL, LEAK DETECTION ....25-15
PUMP - REMOVAL, OIL ............9-144,9-56
PUMP - REMOVAL, SEAL - OIL . . . 21-113,21-264
PUMP (2.4L ENGINE) - INSTALLATION ....19-43
PUMP (2.4L ENGINE) - REMOVAL .......19-38
PUMP (2.4L/3.3L/3.8L ENGINE) - DESCRIPTION ....................... 19-36
PUMP (3.3L/3.8L ENGINE) - INSTALLATION ....................... 19-43
PUMP (3.3L/3.8L ENGINE) - REMOVAL . . . 19-40
PUMP (DIESEL) - DESCRIPTION .........19-37
PUMP (DIESEL) - INSTALLATION ........19-43
PUMP (DIESEL) - REMOVAL ............19-41
PUMP INITIAL OPERATION - STANDARD PROCEDURE, POWER STEERING ........19-37
PUMP INLET TUBE - 2.4L - DESCRIPTION, WATER .................7-36
PUMP INLET TUBE - 2.4L - INSTALLATION, WATER .................7-36
PUMP INLET TUBE - 2.4L - REMOVAL, WATER ............................. 7-36
PUMP INLET TUBE - 3.3/3.8L - INSTALLATION, WATER .................7-37
PUMP INLET TUBE - 3.3/3.8L - REMOVAL, WATER .................... 7-37
PUMP MODULE - DESCRIPTION, FUEL ....14-8
PUMP MODULE - OPERATION, FUEL ......14-9
PUMP MOTOR - INSTALLATION, WASHER ........................... 8R-12
PUMP MOTOR - REMOVAL, WASHER ....8R-12
PUMP (PULLEY) - ASSEMBLY ..........19-42
PUMP (PULLEY) - DISASSEMBLY ........19-41
PUMP RELAY - DESCRIPTION, FUEL .....14-32
PUMP RELAY - OPERATION, FUEL .......14-32
PUMP, SPECIAL TOOLS - POWER STEERING .......................... 19-44
PUSH-PIN GROMMET REPLACEMENT, STANDARD PROCEDURE ..............8N-48
PUSHRODS - DESCRIPTION ............9-112
PUSHRODS - OPERATION ..............9-112
QUAD BUCKET - INSTALLATION, BUCKET SEAT BACK ........................ 23-141
QUAD BUCKET - INSTALLATION, SEAT BELT BUCKLE - FIRST ROW INBOARD ....8O-36
24 INDEXRS
Description Group-Page Description Group-Page Description Group-Page