belt DAEWOO MATIZ 2003 Service Owner's Guide

DAEWOO MATIZ 2003 Service Owner's Guide MATIZ 2003 DAEWOO DAEWOO https://www.carmanualsonline.info/img/54/56878/w960_56878-0.png DAEWOO MATIZ 2003 Service Owner's Guide

Page 699 of 1184

DAEWOO MATIZ 2003  Service Owners Guide POWER STEERING PUMP  6B–5
DAEWOO M-150 BL2
D105C527
PUMP DRIVE PULLEY
Tools Required
DW310–020 Power Steering Pulley Remove Holder
Removal Procedure
1. Remove the front passenger side headlamp.
Re

Page 700 of 1184

DAEWOO MATIZ 2003  Service Owners Guide 6B –6  POWER STEERING PUMP
DAEWOO M-150 BL2
D105C531
Remove the bolt (3).
18–22 Nm
D15C532A
Installation  Procedure
1. Install the power steering pump with the bolt.
Tighten
Tighten the bolt to

Page 706 of 1184

DAEWOO MATIZ 2003  Service Owners Guide POWER STEERING GEAR  6C–3
DAEWOO M-150 BL2
DIAGNOSTIC INFORMATION AND PROCEDURES
POWER RACK AND PINION STERING GEAR
ConditionProbable CauseCorrection
Hissing NoiseLoose steering coupling joints.Ti

Page 707 of 1184

DAEWOO MATIZ 2003  Service Owners Guide 6C –4  POWER STEERING GEAR
DAEWOO M-150 BL2
POWER RACK AND PINION STERING GEAR (Cont’d)
ConditionProbable CauseCorrection
Excessive Wheel Kickback or
Loose SteeringContaminated air in the power
s

Page 756 of 1184

DAEWOO MATIZ 2003  Service Owners Guide 7A–6 HEATING AND VENTILATION SYSTEM
DAEWOO M-150 BL2
DIAGNOSTIC INFORMATION AND PROCEDURES
HEATER SYSTEM
INSUFFICIENT HEATING OR DEFROSTING
Caution: The cooling system is pressurized when hot. Injur

Page 784 of 1184

DAEWOO MATIZ 2003  Service Owners Guide 7B–2 MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
DAEWOO M-150 BL2
DESCRIPTION AND  OPERATION
SYSTEM COMPONENTS
–FUNCTIONAL
Compressor
All compressors are belt–driven from th

Page 787 of 1184

DAEWOO MATIZ 2003  Service Owners Guide MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM 7B–5
DAEWOO M-150 BL2
DIAGNOSTIC INFORMATION AND PROCEDURES
GENERAL DIAGNOSIS
TESTING THE REFRIGERANT
SYSTEM
If you suspect a problem

Page 790 of 1184

DAEWOO MATIZ 2003  Service Owners Guide 7B–8 MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
DAEWOO M-150 BL2
AIR CONDITIONING SYSTEM DIAGNOSIS
INSUFFICIENT COOLING DIAGNOSIS
���� ����Step����������������� ���������������

Page 802 of 1184

DAEWOO MATIZ 2003  Service Owners Guide 7B–20 MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
DAEWOO M-150 BL2
D108B507
RECEIVER DRYER BRACKET
Removal Procedure
1. Remove the front bumper fascia. Refer to Section
9O, Bump

Page 803 of 1184

DAEWOO MATIZ 2003  Service Owners Guide MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM 7B -- 21
DAEWOO M-150 BL2
D18B511B
Installation Procedure
1. Install the compressor with the mounting bolts.
Tighten
DTighten the compr