timing belt DODGE NEON 2000 Service User Guide

DODGE NEON 2000 Service User Guide NEON 2000 DODGE DODGE https://www.carmanualsonline.info/img/12/56910/w960_56910-0.png DODGE NEON 2000 Service User Guide

Page 750 of 1285

DODGE NEON 2000  Service User Guide (8) Install lower engine torque strut. Refer to pro-
cedure in this section.
(9) Connect exhaust system to manifold. Refer to
Group 11, Exhaust System for procedure and torque
specifications.
(10) Con

Page 756 of 1285

DODGE NEON 2000  Service User Guide NOTE: Position seal with the concave side facing
the installation tool.
(2) Install seals using Special Tool MB-998306.
Only hand pressure on tool is needed to install new
seals.
(3) Install cylinder

Page 757 of 1285

DODGE NEON 2000  Service User Guide INSPECT CYLINDER HEAD FOR THE FOLLOWING:
NOTE:
²Check oil feed holes for blockage.
²Inspect cylinder head camshaft bearings for
wear, Refer to Cylinder Head, Inspection and Clean-
ing.
²Check camsh

Page 758 of 1285

DODGE NEON 2000  Service User Guide (5) Slide the rocker arms and spacers off the shaft.
Keep the spacers and rocker arms in the same loca-
tion for reassembly.
NOTE: Inspect the rocker arm for scoring, wear on
the roller or damage to t

Page 760 of 1285

DODGE NEON 2000  Service User Guide CYLINDER HEAD
REMOVAL
(1) Perform fuel system pressure release procedure
before attempting any repairs.Refer to Group 14,
Fuel System
(2) Disconnect negative battery cable.
(3) Remove power steering/a

Page 763 of 1285

DODGE NEON 2000  Service User Guide (13) Install ignition coil and spark plug cables.
Connect coil electrical connector.
(14) Install intake manifold. Refer to procedure in
this section.
(15) Install upper radiator hose.
(16) Install gr

Page 764 of 1285

DODGE NEON 2000  Service User Guide (2) Install crankshaft damper bolt. Using Special
Tool 6847 and a torque wrench, tighten bolt to 136
N´m (100 ft. lbs.) (Fig. 63).
(3) Install accessory drive belts. Refer to Group 7,
Cooling System

Page 765 of 1285

DODGE NEON 2000  Service User Guide INSTALLATION
(1) Install rear timing cover and tighten bolts to
12 N´m (105 in. lbs.) (Fig. 65).
(2) Install camshaft sprocket. While holding
sprockets with Special Tools C-4687 and modifiedAdaptor C

Page 766 of 1285

DODGE NEON 2000  Service User Guide TIMING BELT
CHECKING BELT TIMINGÐCOVER INSTALLED
²Remove number one spark plug.
²Using a dial indicator, set number one cylinder
to TDC on the compression stroke.
²Remove the access plug from the

Page 767 of 1285

DODGE NEON 2000  Service User Guide (11) Inserta8mmAllen wrench into the hexagon
opening located on the front of the belt tensioner pul-
ley (Fig. 72). Rotate the pulley counterclockwise until
it contacts the stop. While holding tension
Page:   < prev 1-10 11-20 21-30 31-40 next >