tra DODGE NEON 2000 Service Repair Manual

DODGE NEON 2000 Service Repair Manual NEON 2000 DODGE DODGE https://www.carmanualsonline.info/img/12/56910/w960_56910-0.png DODGE NEON 2000 Service Repair Manual

Page 948 of 1285

DODGE NEON 2000  Service Repair Manual (9) Install split thrust washer retaining ring (Fig.
111).
(10) Install 5th gear caged needle bearing (Fig.
112).
(11) Using special tool #C-3717, install 5th speed
gear and synchronizer (Fig. 113). T

Page 949 of 1285

DODGE NEON 2000  Service Repair Manual OUTPUT SHAFT
CAUTION: The output shaft is serviced as an
assembly. Do not try to repair any component on
the output shaft. If the 1-2 synchronizer or gear
fails, it is necessary to replace the output

Page 950 of 1285

DODGE NEON 2000  Service Repair Manual RING GEAR
CAUTION: Always install new ring gear bolts.
Tighten ring gear bolts to 81 N´m (60 ft. lbs.) torque.
Fig. 117 Install Differential Bearing Cone
1 ± SPECIAL TOOL C-4171
2 ± SPECIAL TOOL L-

Page 951 of 1285

DODGE NEON 2000  Service Repair Manual SPEEDOMETER DRIVE GEAR
NOTE: The plastic speedometer drive gear must be
removed from the differential case in order to ser-
vice the differential gears
REMOVAL
(1) Pry the plastic speedometer drive ge

Page 952 of 1285

DODGE NEON 2000  Service Repair Manual DIFFERENTIAL GEARS
NOTE: The plastic speedometer drive gear must be
removed from the differential case in order to ser-
vice the differential gears. Refer to Speedometer
Drive Gear for service informa

Page 953 of 1285

DODGE NEON 2000  Service Repair Manual (3) Rotate side gears to opening in differential
(Fig. 129).
(4) Remove differential gears (Fig. 130).INSTALLATION
(1) Assemble the differential side gears, pinion
gears and pinion gears with the pini

Page 954 of 1285

DODGE NEON 2000  Service Repair Manual (3) Stake pinion shaft retaining pin with a suitable
chisel (Fig. 132).
(4) Rotate the assembly two full revolutions both
clockwise and counterclockwise.
(4) Set up dial indicator as shown and record

Page 955 of 1285

DODGE NEON 2000  Service Repair Manual SHIFT RAILS OVERHAUL
(1) Remove shift rails from the geartrain.
(2) To service the 5-R shift rail, remove the C-clip
retaining the reverse shift lever arm. Remove the 5th
shift fork roll pin and remov

Page 956 of 1285

DODGE NEON 2000  Service Repair Manual ²Output bearing race and retainer
²Input bearing and sleeve
²Differential bearing cones
²Shift rail bushings
²Shift shafts
²Shift shaft seals
²Shift shaft bushings
²Rear bearing oil feed troug

Page 957 of 1285

DODGE NEON 2000  Service Repair Manual INSTALLATION
(1) Line up output bearing race to race bore.
(2) Insert tool #4628 with C-4171 into output bear-
ing race (Fig. 144). Tap race into bore. Install output