DODGE RAM 1500 1998 2.G Workshop Manual

DODGE RAM 1500 1998 2.G Workshop Manual RAM 1500 1998 2.G DODGE DODGE https://www.carmanualsonline.info/img/12/5702/w960_5702-0.png DODGE RAM 1500 1998 2.G Workshop Manual
Trending: Trailer plug, Drive belt removal, warning, oil type, lumbar support, diagrams, heating & air conditioning

Page 1731 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (6) Install assembled output shaft and geartrain in
input shaft (Fig. 85). Carefully rotate output shaft
until the 3-4 synchro ring seats in synchro hub and
sleeve.
(7) Install Adapter 6747-2A on fron

Page 1732 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (11) On 2-wheel drive transmission, thread one
Alignment Pin 8120 in center or passenger side hole
of output shaft bearing retainer. Then position
retainer on fifth gear as shown (Fig. 88).
(12) Assem

Page 1733 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (2) Apply liberal quantity of petroleum jelly to
countershaft rear bearing and bearing race.
(3) Install countershaft rear bearing in bearing
race (Fig. 92).
NOTE: Large diameter side of the roller re

Page 1734 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (9) Apply Mopar Gasket Maker or equivalent to
housing bolt threads, bolt shanks and under bolt
heads (Fig. 95).
(10) Start first two bolts in retainer (Fig. 96). It
may be necessary to move retainer r

Page 1735 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (9) Install rear bearing snap ring on output shaft
(Fig. 98).
(10) Lubricate lip of new rear seal (Fig. 99) with
Mopar Door Ease, or transmission fluid.
(11) Installnewrear seal in adapter housing bor

Page 1736 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (4) Assemble shift shaft shift lever and bushing
(Fig. 102). Verify slot in bushing is facing up and roll
pin hole for lever is aligned with hole in shaft.
(5) Install assembled lever and bushing on s

Page 1737 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (9) Select correctnewroll pin for shift shaft lever
(Fig. 106). Shaft lever roll pin is approximately 22
mm (7/8 in.) long. Shift socket roll pin is approxi-
mately 33 mm (1-1/4 in.) long.
(10) Align

Page 1738 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (14) Seat roll pin in shift socket with pin punch.
Roll pin must be flush with socket after installation
(Fig. 110).
(15) Verify that notches in shift fork arms are
aligned (Fig. 111). Realign arms if

Page 1739 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (2) Apply liberal quantity of petroleum jelly to
countershaft front bearing. Then insert bearing in
front housing race (Fig. 113). Large diameter side of
bearing cage goes toward countershaft (Fig. 11

Page 1740 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (12) Install shift shaft bushing lock bolt (Fig. 117).
Apply Mopar Gasket Maker or equivalent to bolt
threads, shank and underside of bolt head before
installation.
CAUTION: If lock bolt cannot be ful
Trending: fog light, Spring leaf, coolant level, Harmonic balancer, Rear suspension, Drum brakes, gas mileage