Back JEEP CHEROKEE 1995 Service Repair Manual

JEEP CHEROKEE 1995 Service Repair Manual CHEROKEE 1995 JEEP JEEP https://www.carmanualsonline.info/img/16/57039/w960_57039-0.png JEEP CHEROKEE 1995 Service Repair Manual

Page 1274 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (4) Install clean air hose and clamp to cover. Com-
press the clamp snugly with adjustable pliers as
shown in figure 6.
AIR CLEANER ELEMENT
REMOVAL/INSTALLATION
(1) Pry back the six clips (YJ Models)

Page 1279 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Place a small container or shop towel beneath
the switch to collect any excess fluid.
(3) Remove the switch.
INSTALLATION
(1) Install the power steering switch.
(2) Connect the electrical connecto

Page 1322 of 2198

JEEP CHEROKEE 1995  Service Repair Manual PITMAN SHAFT SEALSÐIN CAR REPLACEMENT
REMOVAL
(1) Remove pitman arm from gear. Refer to Pitman
Arm Removal in Steering Linkage.
(2) Clean exposed end of pitman shaft and hous-
ing. Use a wire brush t

Page 1324 of 2198

JEEP CHEROKEE 1995  Service Repair Manual ²SECOND - over-center preload adjustment
WORM THRUST BEARING PRELOAD
ADJUSTMENT
(1) Remove adjuster plug locknut (Fig. 8).
(2) Turn the adjuster in with Spanner Wrench
C-4381. Tighten the plug and th

Page 1325 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Starting at either stop turn the stub shaft back
1/2 the total number of turns. This is the center of
the gear travel (Fig. 12).
(3) Turn the pitman shaft adjuster screw back
(COUNTERCLOCKWISE) un

Page 1327 of 2198

JEEP CHEROKEE 1995  Service Repair Manual PITMAN SHAFT AND SIDE COVER REPLACEMENT
REMOVE
(1) Remove steering gear from vehicle. Refer to
Power Steering Gear Replacement in this section.
(2) Remove pitman arm from steering gear. Refer
to Pitma

Page 1333 of 2198

JEEP CHEROKEE 1995  Service Repair Manual the stub shaft COUNTERCLOCKWISE.
²The rack piston will be forced onto the tool and
hold the rack piston balls in place.
(7) Install the races and thrust bearing to worm
shaft (Fig. 35).
(8) Install w

Page 1334 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (5) Install the double lip seal.
(6) Install the backup washer.
(7) Install the retainer ring with snap ring pliers.
(8) Install the pitman shaft and side cover. Refer to
Side Cover and Pitman Shaft R

Page 1338 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Wrap a single layer of plastic tape around the
pitman shaft threads and splines. This will protect
the replacement seals during installation.
(3) Install the seal with a suitable size socket.
(4)

Page 1340 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (3) Hold the ball nut over a cloth. Remove the re-
maining recirculating balls by rotating the worm-
shaft back and forth.
There are a total of 50 recirculating balls
within the ball nut and the guide