Ecu JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual GRAND CHEROKEE 2002 WJ / 2.G JEEP JEEP https://www.carmanualsonline.info/img/16/7175/w960_7175-0.png JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual

Page 1760 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (7) Install Piston Guides 8504 into the input clutch
retainer (Fig. 74) and onto the input clutch hub to
guide the inner and outer underdrive piston seals
into position.
(8) Install the underdrive pis

Page 1774 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual PARK LOCK CABLE
REMOVAL
(1) Place the shifter in the PARK position.
(2) Lower the steering column cover.
(3) With the ignition switch in the ªRUNº position
depress the park lock cable locking tab, l

Page 1782 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTALLATION
(1) Place the floor shifter lever in PARK position.
(2) Loosen the adjustment screw on the shift cable.
(3) Verify that the park lock cable adjustment tab
is pulled upward to the unlocked

Page 1788 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual position, the clutch will engage after the shift to
third gear, at approximately 56 km/h (35 mph) at
light throttle.
The TCM controls the torque converter by way of
internal logic software. The progra

Page 1795 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (7) Remove the screws holding the accumulator
cover onto the valve body (Fig. 128).
(8) Remove the accumulator springs and pistons
from the valve body. Note which accumulator piston
and spring belong

Page 1801 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual REMOVAL
(1) Shift transfer case into NEUTRAL.
(2) Raise vehicle.
(3) Remove transfer case drain plug and drain
transfer case lubricant.
(4) Mark front and rear propeller shaft yokes for
alignment refe

Page 1807 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (2) Remove seal plug from low range fork lockpin
access hole. Then move shift sector to align low range
fork lockpin with access hole.
(3) Remove range fork lockpin with size number
one easy-out tool

Page 1814 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual REAR OUTPUT SHAFT/YOKE/DRIVE CHAIN
Check condition of the seal contact surfaces of the
yoke slinger (Fig. 49). This surface must be clean and
smooth to ensure proper seal life. Replace the yoke
nut an

Page 1823 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (18) Install shift rail (Fig. 81). Be sure rail is
seated in both shift forks.
(19) Rotate shift sector to align lockpin hole in low
range fork with access hole in case.
(20) Insert an easy-out in ran

Page 1826 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual NV242HD REAR RETAINER
(1) Apply bead of MopartSealer, or LoctiteŸ
Ultra Gray, to mating surface of rear retainer. Sealer
bead should be a maximum of 3/16 in.
(2) Install rear retainer on rear case. T