check engine NISSAN PICK-UP 2001 Repair Manual

NISSAN PICK-UP 2001 Repair Manual PICK-UP 2001 NISSAN NISSAN https://www.carmanualsonline.info/img/5/57372/w960_57372-0.png NISSAN PICK-UP 2001 Repair Manual

Page 378 of 1306

NISSAN PICK-UP 2001  Repair Manual 6 CHECK SHIELD CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect harness connectors E205, E33.
3. Check harness continuity between harness connector E33 terminal 5 and ground. Refer to wiring diagram

Page 380 of 1306

NISSAN PICK-UP 2001  Repair Manual AEC877A
Component DescriptionNEEC0424When the gear position is ªNº or ªPº, park/neutral position (PNP)
switch is ªONº.
ECM detects the park/neutral position when continuity with ground
exists.
C

Page 381 of 1306

NISSAN PICK-UP 2001  Repair Manual SEF212Y
DTC Confirmation Procedure=NEEC0428CAUTION:
Always drive vehicle at a safe speed.
NOTE:
If ªDTC Confirmation Procedureº has been previously conducted,
always turn ignition switch ªOFFº and

Page 390 of 1306

NISSAN PICK-UP 2001  Repair Manual Diagnostic ProcedureNEEC0325
1 INSPECTION START
Turn ignition switch ªOFFº, and restart engine.
Is engine running?
YesorNo
Yes (With CONSULT-II)©GO TO 2.
Yes (Without CONSULT-
II)©GO TO 3.
No©GO

Page 391 of 1306

NISSAN PICK-UP 2001  Repair Manual 4 CHECK POWER SUPPLY
1. Turn ignition switch OFF.
2. Disconnect ignition coil harness connector.
SEC276D
3. Turn ignition switch ON.
4. Check voltage between terminal 7 and ground with CONSULT-II or t

Page 396 of 1306

NISSAN PICK-UP 2001  Repair Manual Diagnostic ProcedureNEEC0438
1 CHECK OVERALL FUNCTION
With CONSULT-II
1. Start engine.
2. Perform ªPOWER BALANCEº in ªACTIVE TESTº mode with CONSULT-II.
SEF981Z
3. Make sure that each circuit prod

Page 397 of 1306

NISSAN PICK-UP 2001  Repair Manual 2 CHECK POWER SUPPLY
1. Stop engine.
2. Disconnect injector harness connector.
3. Turn ignition switch ON.
4. Check voltage between injector terminal 2 and ground with CONSULT-II or tester.
SEC277D
Vo

Page 412 of 1306

NISSAN PICK-UP 2001  Repair Manual Diagnostic Procedure=NEEC0454
1 INSPECTION START
Do you have CONSULT-II?
YesorNo
Ye s©GO TO 2.
No©GO TO 3.
2 CHECK OVERALL FUNCTION
With CONSULT-II
1. Start engine.
2. Check ªPW/ST SIGNALº in ªDA

Page 413 of 1306

NISSAN PICK-UP 2001  Repair Manual 4 CHECK INPUT SIGNAL CIRCUIT
1. Turn ignition switch ªOFFº.
2. Disconnect ECM harness connector.
3. Check harness continuity between ECM terminal 39 and terminal 1. Refer to wiring diagram.
Continui

Page 417 of 1306

NISSAN PICK-UP 2001  Repair Manual Diagnostic Procedure=NEEC0464
1 CHECK OVERALL FUNCTION
1. Start engine and warm it up to normal operating temperature.
2. Check idle speed.
700±50 rpm
If NG, adjust idle speed.
3. Push air conditione