remove engine NISSAN TIIDA 2011 Service Repair Manual
[x] Cancel search | Manufacturer: NISSAN, Model Year: 2011, Model line: TIIDA, Model: NISSAN TIIDA 2011Pages: 3787, PDF Size: 78.35 MB
Page 2475 of 3787
![NISSAN TIIDA 2011 Service Repair Manual ENGINE ASSEMBLYEM-85
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
4. Remove engine mounting insulator (RH) (1), engine mounting
bracket (RH) (2) and engine mounting stay (3).
NISSAN TIIDA 2011 Service Repair Manual ENGINE ASSEMBLYEM-85
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
4. Remove engine mounting insulator (RH) (1), engine mounting
bracket (RH) (2) and engine mounting stay (3).](/img/5/57396/w960_57396-2474.png)
ENGINE ASSEMBLYEM-85
< REMOVAL AND INSTALLATION > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
4. Remove engine mounting insulator (RH) (1), engine mounting
bracket (RH) (2) and engine mounting stay (3).
5. Remove engine mounting insulator (LH) (4) through bolt secur- ing nut (A).
6. Carefully lower jack, or raise lift to remove the engine and the transaxle assembly. CAUTION:
• Make sure that no part interferes with the vehicle side.
• Before and during this lifting, alw ays check if any harnesses are left connected.
• During the removal, always be careful to prevent the vehicle from falling off the lift due to
changes in the center of gravity.
• If necessary, support the vehicle by setting jack or suitable tool at the rear.
Separation
1. Remove starter motor. Refer to SC-19, "Removal and Installation HR16DE".
2. Lift with a hoist and separate the engine from the transaxle assembly. Refer to EM-82, "
Exploded View".
INSTALLATION
Installation is in the reverse order of removal.
• Do not allow engine oil to get on engine mounting insulator. Be careful not to damage engine mounting insu-
lator.
• Make sure that each mounting insulator is seated properly, and tighten nuts and bolts.
• Tighten engine mounting insulator (RH) bolts in the numerical
order shown.
InspectionINFOID:0000000005930964
INSPECTION AFTER INSTALLATION
• Before starting engine, check oil/fluid levels incl uding engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-14, "
Fluids and Lubricants".
• Use procedure below to check for fuel leakage.
• Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
• Start engine. With engine speed increased, check again for fuel leakage at connection points.
• Run engine to check for unusual noise and vibration.
• Warm up engine thoroughly to make sure there is no leak age of fuel, exhaust gas, or any oils/fluids including
engine oil and engine coolant.
• Bleed air from passages in lines and hoses, such as in cooling system.
• After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to spec- ified level, if necessary.
• Summary of the inspection items:
JPBIA0512ZZ
: Vehicle front
JPBIA0280ZZ
Item Before starting engine Engine runningAfter engine stopped
Engine coolant LevelLeakage Level
Revision: May 2010 2011 Versa
Page 2477 of 3787
![NISSAN TIIDA 2011 Service Repair Manual ENGINE STAND SETTINGEM-87
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
DISASSEMBLY AND ASSEMBLY
ENGINE STAND SETTING
SettingINFOID:0000000005930965
NOTE:
Explained here is how NISSAN TIIDA 2011 Service Repair Manual ENGINE STAND SETTINGEM-87
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
DISASSEMBLY AND ASSEMBLY
ENGINE STAND SETTING
SettingINFOID:0000000005930965
NOTE:
Explained here is how](/img/5/57396/w960_57396-2476.png)
ENGINE STAND SETTINGEM-87
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
DISASSEMBLY AND ASSEMBLY
ENGINE STAND SETTING
SettingINFOID:0000000005930965
NOTE:
Explained here is how to disassemble with engine stand supporting transmission surface. When using differ-
ent type of engine stand, note with difference in steps and etc.
1. Remove the engine and the transaxle assembly from
the vehicle, and separate the transaxle from the
engine. Refer to EM-82, "
Exploded View".
2. Remove clutch cover and clutch disc (if equipped). Refer to CL-16, "
Removal and Installation".
3. Remove flywheel or driveplate. • Secure flywheel or driveplate with Tool, and remove bolts.
CAUTION:
• Never disassemble flywheel.
• Never place flywheel or driveplate with signal plate facing down.
• When handling signal plate, take car e not to damage or scratch it.
• Handle signal plate in a manner that prevents it from becoming magnetized.
4. Lift the engine with a hoist to install it onto widely use engine stand. CAUTION:
• Use the engine stand that has a load capacity [approximately 135 kg (298 lb) or more] large
enough for supporting the engine weight.
• If the load capacity of stand is not adequate, remove the following parts beforehand to reduce the poten-
tial risk of overturning stand.
- Intake manifold: Refer to EM-27, "
Exploded View".
- Exhaust manifold: Refer to EM-30, "
Exploded View".
- Rocker cover: Refer to EM-46, "
Exploded View".
NOTE:
The figure shows an example of widely use engine stand that
can support mating surface of transaxle with flywheel or drive-
plate removed.
CAUTION:
Before removing the hanging chains, make sure the engine
stand is stable and there is no risk of overturning.
5. Drain engine oil. Refer to LU-8, "
Draining".
6. Drain engine coolant by removing water drain plug (1) from RH side of the engine. Tool number : KV11105210 (J-44716)
PBIC0085E
: Engine front
PBIC3742E
Revision: May 2010
2011 Versa
Page 2478 of 3787
![NISSAN TIIDA 2011 Service Repair Manual EM-88
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
ENGINE UNIT
ENGINE UNIT
DisassemblyINFOID:0000000005930966
1. Remove intake manifold. Refer to
EM-27, "Exploded View".
2. Remove exhaust manifold. Refer to NISSAN TIIDA 2011 Service Repair Manual EM-88
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
ENGINE UNIT
ENGINE UNIT
DisassemblyINFOID:0000000005930966
1. Remove intake manifold. Refer to
EM-27, "Exploded View".
2. Remove exhaust manifold. Refer to](/img/5/57396/w960_57396-2477.png)
EM-88
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
ENGINE UNIT
ENGINE UNIT
DisassemblyINFOID:0000000005930966
1. Remove intake manifold. Refer to
EM-27, "Exploded View".
2. Remove exhaust manifold. Refer to EM-30, "
Exploded View".
3. Remove oil pan (upper). Refer to EM-42, "
Component".
4. Remove ignition coil, spark plug and rocker cover. Refer to EM-46, "
Exploded View".
5. Remove fuel injector and fuel tube. Refer to EM-33, "
Exploded View".
6. Remove timing chain. Refer to EM-49, "
Exploded View".
7. Remove camshaft. Refer to EM-59, "
Exploded View".
8. Remove cylinder head. Refer to EM-73, "
Removal and Installation".
AssemblyINFOID:0000000005930967
Assembly is in the reverse order of disassembly.
Revision: May 2010 2011 Versa
Page 2481 of 3787
![NISSAN TIIDA 2011 Service Repair Manual CYLINDER BLOCKEM-91
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
7. Remove piston from connecting rod.
• Use Tool and a press to remove the piston pin.
CAUTION:
Be careful n NISSAN TIIDA 2011 Service Repair Manual CYLINDER BLOCKEM-91
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
7. Remove piston from connecting rod.
• Use Tool and a press to remove the piston pin.
CAUTION:
Be careful n](/img/5/57396/w960_57396-2480.png)
CYLINDER BLOCKEM-91
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
7. Remove piston from connecting rod.
• Use Tool and a press to remove the piston pin.
CAUTION:
Be careful not to damage the piston and connecting rod.
NOTE:
The joint between the connecting rod and the piston pin is a
press fit.
8. Remove the main bearing cap in the following procedure. • Measure crankshaft end play before loosening main bearing cap bolts. Refer to EM-97, "
Inspection"
a. Loosen and remove bolts in several steps in reverse of the
numerical order shown.
• TORX socket (size: E14) can be used.
b. Label parts for assembly and remove the main beari ng cap from the cylinder block while tapping lightly
with a plastic hammer.
CAUTION:
Identify installation positions, and store th em without mixing up.
9. Remove crankshaft (2). CAUTION:
• Be careful not damage or deform signal plate (1) mountedon crankshaft.
• When setting crankshaft on a flat floor surface, use a block of wood to avoid interference between signal plate
and the floor surface.
• Never remove signal plate unl ess it is necessary to do so.
NOTE:
When removing or installing signal plate, use TORX socket (size
T40).
10. Pull rear oil seal out from rear end of crankshaft.
11. Label parts for assembly and remove main bearing (upper and lower) and thrust bearings from cylinder block and main bearing cap.
CAUTION:
Identify installation positions, and store th em without mixing up.
ASSEMBLY
1. Fully air-blow engine coolant and engine oil passages in cylinder block, cylinder bore and crankcase to
remove any foreign material.
WARNING:
Use goggles to protect your eyes.Tool number (A) : KV10109730 ( — )
Tool number (B) : KV10110310 ( — )
Tool number (C) : ST13030020 ( — )
PBIC5270J
: Engine front
PBIC3744E
PBIC3745E
Revision: May 2010
2011 Versa
Page 2482 of 3787
![NISSAN TIIDA 2011 Service Repair Manual EM-92
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
CYLINDER BLOCK
2. Install water drain plug (1) to cylinder block as shown.
Use Genuine Silicone RTV Sealant or equivalent. Refer to
GI-42, "
Recommended Che NISSAN TIIDA 2011 Service Repair Manual EM-92
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
CYLINDER BLOCK
2. Install water drain plug (1) to cylinder block as shown.
Use Genuine Silicone RTV Sealant or equivalent. Refer to
GI-42, "
Recommended Che](/img/5/57396/w960_57396-2481.png)
EM-92
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
CYLINDER BLOCK
2. Install water drain plug (1) to cylinder block as shown.
Use Genuine Silicone RTV Sealant or equivalent. Refer to
GI-42, "
Recommended Chemical Product and Sealant".
3. Install main bearings and thrust bearings in their original positions with the following procedure:
a. Remove dust, dirt, and engine oil on the bearing mating surfaces of cylinder block.
b. Install thrust bearings to the both sides of the No. 3 journal hous- ing (B) on cylinder block.
• Install thrust bearings with the oil groove (A) facing crankshaftarm (outside).
c. Install the main bearings (1) paying attention to the direction. • Install the one with oil holes (A) onto cylinder block and the
one without oil holes onto main bearing cap.
• Before installing main bearings, apply new engine oil to the bearing surface (inside). Do not apply engine oil to the back
surface, but thoroughly clean it.
• Ensure the oil holes on cylinder block and those on the corre- sponding bearing are aligned.
• Install the main bearing in the position shown.
NOTE:
Install the main bearing in the center position with the following
dimension. For service operati on, the center position can be
checked visually.
: Engine front
PBIC3742E
: Engine front
PBIC3258J
PBIC3746E
1 : Cylinder block
2 : Main bearing (upper)
3 : Main bearing (lower)
4 : Main bearing cap
: Engine front
PBIC3747E
Journal position No. 1No. 2 No. 3No. 4 No. 5
L1 [Unit: mm (in)] 1.65–2.05 1.25–1.65
2.30–2.701.25–1.65 1.60–2.00
(0.065-0.081) (0.049-0.065) (0.091-0.106) (0.049-0.065) (0.063-0.079)
L2 [Unit: mm (in)] 1.30–1.70
1.30–1.702.30–2.701.30–1.70 1.30–1.70
(0.051-0.067) (0.051-0.067) (0.091-0.106) (0.051-0.067) (0.051-0.067)
Revision: May 2010 2011 Versa
Page 2483 of 3787
![NISSAN TIIDA 2011 Service Repair Manual CYLINDER BLOCKEM-93
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
CAUTION:
Dimension L1 of journal No. 3 is the distance from the housing base end
surface (bulk) (not the
dist NISSAN TIIDA 2011 Service Repair Manual CYLINDER BLOCKEM-93
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
CAUTION:
Dimension L1 of journal No. 3 is the distance from the housing base end
surface (bulk) (not the
dist](/img/5/57396/w960_57396-2482.png)
CYLINDER BLOCKEM-93
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
CAUTION:
Dimension L1 of journal No. 3 is the distance from the housing base end
surface (bulk) (not the
distance from the thrust bearing mounting end surface).
4. Install signal plate to crankshaft if removed.
a. Set the signal plate (1) with the flange facing toward the counter- weight side (engine front side) to the crankshaft rear surface.
b. After positioning crankshaft and signal plate with positioning dowel pin, tighten bolt.
NOTE:
Dowel pin of crankshaft and signal plate is provided as a set for
each.
c. Remove dowel pin. CAUTION:
Be sure to remove dowel pin.
5. Install crankshaft to cylinder block. • Make sure that crankshaft turns smoothly by hand.
CAUTION:
Never install rear oil seal yet.
6. Install main bearing caps in their original positions. • Install the main bearing cap while referring to the front mark(B) and the journal number stamp (A).
NOTE:
Main bearing cap cannot be replaced as a single part,
because it is machined together with cylinder block.
7. Tighten main bearing cap bolts in numerical order shown with the following steps.
a. Apply new engine oil to threads and seat surfaces of the bolts.
b. Tighten main bearing cap bolts in the numerical order shown.
A : Dowel pin hole
: Engine front
PBIC3748E
PBIC3749E
: Engine front
PBIC3744E
: 32.4 N·m (3.3 kg-m, 24 ft-lb)
Revision: May 2010 2011 Versa
Page 2490 of 3787
![NISSAN TIIDA 2011 Service Repair Manual EM-100
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
CYLINDER BLOCK
Measure the outer diameter of piston pin with a micrometer.
Connecting Rod Small End Clearance
(Connecting rod small end clearance) = (Connec NISSAN TIIDA 2011 Service Repair Manual EM-100
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
CYLINDER BLOCK
Measure the outer diameter of piston pin with a micrometer.
Connecting Rod Small End Clearance
(Connecting rod small end clearance) = (Connec](/img/5/57396/w960_57396-2489.png)
EM-100
< DISASSEMBLY AND ASSEMBLY >[HR16DE]
CYLINDER BLOCK
Measure the outer diameter of piston pin with a micrometer.
Connecting Rod Small End Clearance
(Connecting rod small end clearance) = (Connecting rod sm
all end inner diameter) – (Piston pin outer diame-
ter)
• If the measured value is out of the standard, repl ace connecting rod assembly and/or piston and piston pin
assembly.
• If replacing connecting rod assembly, use "CONNECTING ROD BEARING OIL CLEARANCE" to select con-
necting rod bearing.
CYLINDER BLOCK TOP SURFACE DISTORTION
• Using a scraper, remove gasket on the cylinder block su rface, and also remove engine oil, scale, carbon, or
other contamination.
CAUTION:
Be careful not to allow gasket flakes to en ter engine oil or engine coolant passages.
• Measure the distortion on the cylinder block upper face at some different points in six directions with a straight edge and a feeler
gauge.
• If it exceeds the limit, replace cylinder block.
MAIN BEARING HOUSING INNER DIAMETER
• Install main bearing cap without main bearings install ed, and tighten main bearing cap bolts to the specified
torque. Refer to EM-90, "
Disassembly and Assembly".
• Measure the position shown [5 mm (0.196 in) rearward from main bearing housing front side end surface) in the 2 directions as
shown. The smaller one is the measured value.
• If out of the standard, replace cylinder block and main bearing caps as an assembly.
NOTE:
These components cannot be replaced as a single unit, because they were processed together.
PISTON TO CYLINDER BORE CLEARANCE
Cylinder Bore Inner Diameter
Standard : Refer to EM-116, "Cylinder Block".
PBIC0117E
Standard : Refer to EM-116, "Cylinder Block".
Limit : Refer to EM-116, "
Cylinder Block".
PBIC0121E
1 : Cylinder block
2 : Main bearing cap
: Engine front
Standard : Refer to EM-116, "Cylinder Block".
PBIC3879E
Revision: May 2010 2011 Versa
Page 2493 of 3787
![NISSAN TIIDA 2011 Service Repair Manual CYLINDER BLOCKEM-103
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Remove engine oil and dust on crankshaft pin and the surfaces of each bearing completely.
• Cut a plas NISSAN TIIDA 2011 Service Repair Manual CYLINDER BLOCKEM-103
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Remove engine oil and dust on crankshaft pin and the surfaces of each bearing completely.
• Cut a plas](/img/5/57396/w960_57396-2492.png)
CYLINDER BLOCKEM-103
< DISASSEMBLY AND ASSEMBLY > [HR16DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
• Remove engine oil and dust on crankshaft pin and the surfaces of each bearing completely.
• Cut a plastigage slightly shorter than the bearing width,
and place it in crankshaft axial direction, avoiding oil
holes.
• Install connecting rod bearings to connecting rod and c ap, and tighten connecting rod bolts to the specified
torque. Refer to EM-90, "
Disassembly and Assembly".
CAUTION:
Never rotate crankshaft.
• Remove connecting rod cap and bearing, and using the scale on the plastigage bag, measure the plastigage width.
NOTE:
The procedure when the measured value exceeds the limit is
same as that described in the “Method by Calculation”.
MAIN BEARING OIL CLEARANCE
Method by Calculation
• Install main bearings to cylinder block and main bearing cap, and tighten main bearing cap bolts to the spec-ified torque. Refer to EM-90, "
Disassembly and Assembly".
• Measure the inner diameter of main bearing with a bore gauge.
(Bearing oil clearance) = (Main bearing inner diameter) – (Crank-
shaft main journal diameter)
• If the clearance exceeds the limit, select proper main bearing according to main bearing inner diameter and crankshaft main
journal diameter to obtain the specified bearing oil clearance.
Refer to EM-108, "
MainBearing".
Method of Using Plastigage
• Remove engine oil and dust on crankshaft main journal and the surfaces of each bearing completely.
• Cut a plastigage slightly shorter than the bearing width, and place it in crankshaft axial direction, avoiding oil
holes.
• Install main bearings to cylinder block and main bearing cap, and tighten main bearing cap bolts to the spec-
ified torque. Refer to EM-90, "
Disassembly and Assembly".
CAUTION:
Never rotate crankshaft.
• Remove main bearing cap and bearings, and using the scale on the plastigage bag, measure the plastigage width.
NOTE:
The procedure when the measured value exceeds the limit is
same as that described in the “Method by Calculation”.
MAIN BEARING CRUSH HEIGHT
PBIC1149E
Standard : Refer to EM-120, "Main Bearing".
PBIC1644E
PBIC1149E
Revision: May 2010 2011 Versa
Page 2512 of 3787
![NISSAN TIIDA 2011 Service Repair Manual EM-122
< SERVICE INFORMATION >[MR18DE]
PRECAUTIONS
SERVICE INFORMATION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000005930983
NISSAN TIIDA 2011 Service Repair Manual EM-122
< SERVICE INFORMATION >[MR18DE]
PRECAUTIONS
SERVICE INFORMATION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000005930983](/img/5/57396/w960_57396-2511.png)
EM-122
< SERVICE INFORMATION >[MR18DE]
PRECAUTIONS
SERVICE INFORMATION
PRECAUTIONS
Precaution for Supplemental Restraint Syst
em (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000005930983
The Supplemental Restraint System such as “A IR BAG” and “SEAT BELT PRE-TENSIONER”, used along
with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger for certain
types of collision. This system includes seat belt switch inputs and dual stage front air bag modules. The SRS
system uses the seat belt switches to determine the front air bag deployment, and may only deploy one front
air bag, depending on the severity of a collision and w hether the front occupants are belted or unbelted.
Information necessary to service the system safely is included in the SRS and SB section of this Service Man-
ual.
WARNING:
• To avoid rendering the SRS inopera tive, which could increase the risk of personal injury or death in
the event of a collision which would result in air bag inflation, all maintenance must be performed by
an authorized NISSAN/INFINITI dealer.
• Improper maintenance, including incorrect removal and installation of the SRS can lead to personal
injury caused by unintent ional activation of the system. For re moval of Spiral Cable and Air Bag
Module, see the SRS section.
• Do not use electrical test equipmen t on any circuit related to the SRS unless instructed to in this
Service Manual. SRS wiring harn esses can be identified by yellow and/or orange harnesses or har-
ness connectors.
PRECAUTIONS WHEN USING POWER TOOLS (AIR OR ELECTRIC) AND HAMMERS
WARNING:
• When working near the Airbag Diagnosis Sensor Unit or other Airbag System sensors with the Igni-
tion ON or engine running, DO NOT use air or electri c power tools or strike near the sensor(s) with a
hammer. Heavy vibration could activate the sensor( s) and deploy the air bag(s), possibly causing
serious injury.
• When using air or electric power tools or hammers , always switch the Ignition OFF, disconnect the
battery, and wait at least 3 minu tes before performing any service.
Precaution Necessary for Steering W heel Rotation After Battery Disconnect
INFOID:0000000005930984
NOTE:
• This Procedure is applied only to models with Intelligent Key system and NATS (NISSAN ANTI-THEFT SYS-
TEM).
• Remove and install all control units after disconnecting both battery cables with the ignition knob in the
″LOCK ″ position.
• Always use CONSULT-III to perform self-diagnosis as a part of each function inspection after finishing work.
If DTC is detected, perform trouble diagnosis according to self-diagnostic results.
For models equipped with the Intelligent Key system and NATS, an electrically controlled steering lock mech-
anism is adopted on the key cylinder.
For this reason, if the battery is disconnected or if the battery is discharged, the steering wheel will lock and
steering wheel rotation will become impossible.
If steering wheel rotation is required when battery pow er is interrupted, follow the procedure below before
starting the repair operation.
OPERATION PROCEDURE
1. Connect both battery cables. NOTE:
Supply power using jumper cables if battery is discharged.
2. Use the Intelligent Key or mechanical key to turn the ignition switch to the ″ACC ″ position. At this time, the
steering lock will be released.
3. Disconnect both battery cables. The steering lock will remain released and the steering wheel can be rotated.
4. Perform the necessary repair operation.
Revision: May 2010 2011 Versa
Page 2513 of 3787
![NISSAN TIIDA 2011 Service Repair Manual PRECAUTIONSEM-123
< SERVICE INFORMATION > [MR18DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
5. When the repair work is completed, return the ignition switch to the
″LOCK ″ position before connecting
the b NISSAN TIIDA 2011 Service Repair Manual PRECAUTIONSEM-123
< SERVICE INFORMATION > [MR18DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
5. When the repair work is completed, return the ignition switch to the
″LOCK ″ position before connecting
the b](/img/5/57396/w960_57396-2512.png)
PRECAUTIONSEM-123
< SERVICE INFORMATION > [MR18DE]
C
D
E
F
G H
I
J
K L
M A
EM
NP
O
5. When the repair work is completed, return the ignition switch to the
″LOCK ″ position before connecting
the battery cables. (At this time, the steering lock mechanism will engage.)
6. Perform a self-diagnosis check of al l control units using CONSULT-III.
Precaution for Procedure without Cowl Top CoverINFOID:0000000005930985
When performing the procedure after removing cowl top cover, cover
the lower end of windshield.
Precaution for Drain CoolantINFOID:0000000005930986
• Drain coolant when engine is cooled.
Precaution for Disconnecting Fuel PipingINFOID:0000000005930987
• Before starting work, make sure no fire or spark producing items are in the work area.
• Release fuel pressure before disassembly.
• After disconnecting pipes, plug openings to stop fuel leakage.
Precaution for Removal and DisassemblyINFOID:0000000005930988
• When instructed to use special service tools, use the spec ified tools. Always be careful to work safely, avoid
forceful or uninstructed operations.
• Exercise maximum care to avoid damage to mating or sliding surfaces.
• Cover openings of engine system with tape or the equiva lent, if necessary, to seal out foreign materials.
• Mark and arrange disassembly parts in an organized way for easy troubleshooting and assembly.
• When loosening nuts and bolts, as a basic rule, start with the one furthest outside, then the one diagonally
opposite, and so on. If the order of loosening is specif ied, do exactly as specified. Power tools may be used
where noted in the step.
Precaution for Inspection, Repair and ReplacementINFOID:0000000005930989
• Before repairing or replacing, thoroughly inspect parts. Inspect new replacement parts in the same way, and
replace if necessary.
Precaution for Assembly and InstallationINFOID:0000000005930990
• Use torque wrench to tighten bolts or nuts to specification.
• When tightening nuts and bolts, as a basic rule, equally tighten in several different steps starting with the ones in center, then ones on inside and outside diagonally in this order. If the order of tightening is specified,
do exactly as specified.
• Replace with new gasket, packing, oil seal or O-ring.
• Thoroughly wash, clean, and air-blow each part. Carefully check oil or coolant passages for any restriction
and blockage.
• Avoid damaging sliding or mating surfaces. Completely remove foreign materials such as cloth lint or dust. Before assembly, oil sliding surfaces well.
• Release air within route after draining coolant.
• Before starting engine, apply fuel pressure to fuel lines with turning ignition switch ON (with engine stopped). Then make sure that there are no leaks at fuel line connections.
• After repairing, start engine and increase engine speed to check coolant, fuel, oil, and exhaust systems for leakage.
PIIB3706J
Revision: May 2010 2011 Versa