Chain NISSAN X-TRAIL 2001 Service Owner's Guide
[x] Cancel search | Manufacturer: NISSAN, Model Year: 2001, Model line: X-TRAIL, Model: NISSAN X-TRAIL 2001Pages: 3833, PDF Size: 39.49 MB
Page 198 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide EM-148
[YD22DDTi]
FUEL SUPPLY PUMP
5. Remove RH front wheel.
6. Remove RH splash cover (combined with under cover)
7. Remove front exhaust tube.
8. Remove fuel hose from fuel supply pump.
9. Disconnec NISSAN X-TRAIL 2001 Service Owners Guide EM-148
[YD22DDTi]
FUEL SUPPLY PUMP
5. Remove RH front wheel.
6. Remove RH splash cover (combined with under cover)
7. Remove front exhaust tube.
8. Remove fuel hose from fuel supply pump.
9. Disconnec](/img/5/57405/w960_57405-197.png)
EM-148
[YD22DDTi]
FUEL SUPPLY PUMP
5. Remove RH front wheel.
6. Remove RH splash cover (combined with under cover)
7. Remove front exhaust tube.
8. Remove fuel hose from fuel supply pump.
9. Disconnect the harness connector from the fuel supply pump.
10. Remove the fuel supply pump rear bracket.
●Loosen the fuel bolts in the reverse order of that show in the
figure and remove them.
11. Remove injection tube center.
12. Remove front chain case.
●Loosen fixing bolts in the reverse order of that shown in the
figure and remove them.
●Remove No. 6, 10 and 11 bolts with the rubber washer as
space is limited for pulling them out.
CAUTION:
●While front chain case is removed, cover openings to
prevent entry of foreign material into engine.
●Do not remove two mass dampers on the back of
cover.
13. Set the No. 1 piston to TDC on its compression stroke.
●Turn crankshaft pulley clockwise so that the alignment mark
(punched mark) on each camshaft sprocket is positioned as
shown in the figure.
●No position indicator is provided on the crankshaft pul-
ley.
●When installing, color coded links on the secondary tim-
ing chain can be used as alignment marks. Marking may
not be necessary for removal; however, make alignment
marks as required because the alignment mark on fuel
supply pump sprocket may not be easy to see.
14. Remove chain tensioner.
a. Push the plunger of chain tensioner and keep it pressed with a
push pin.
PBIC0984E
JEM121G
SBIA0189E
SEM515G
JEM124G
Page 199 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide FUEL SUPPLY PUMP
EM-149
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
b. Using a hexagon-head wrench [face to face: 5 mm (0.20 in),
SST], remove bolts to remove chain tensioner.
15. Remove timing cha NISSAN X-TRAIL 2001 Service Owners Guide FUEL SUPPLY PUMP
EM-149
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
b. Using a hexagon-head wrench [face to face: 5 mm (0.20 in),
SST], remove bolts to remove chain tensioner.
15. Remove timing cha](/img/5/57405/w960_57405-198.png)
FUEL SUPPLY PUMP
EM-149
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
b. Using a hexagon-head wrench [face to face: 5 mm (0.20 in),
SST], remove bolts to remove chain tensioner.
15. Remove timing chain slack guide.
●Using a hexagon-head wrench [face to face: 6 mm (0.24 in),
SST], remove bolt to remove timing chain slack guide.
16. Remove timing chain tension guide.
17. Remove secondary timing chain.
●Timing chain alone can be removed without removing sprock-
ets.
18. Hold fuel supply pump sprocket and remove bolt.
a. Insert positioning stopper pin (SST) into the hole 6 mm (0.24 in)
in the diameter on the fuel supply pump sprocket.
b. Using a TORX wrench (SST), turn pump shaft little by little to
adjust the position of fuel supply pump sprocket so that the
holes align.
c. Push positioning stopper pin (SST) through fuel supply pump
sprocket to fuel supply pump body to hold fuel supply pump
sprocket.
●Insert the positioning stopper pin until its flange contacts the fuel
supply pump sprocket.
●Remove the TORX wrench (SST).
SBIA0227E
SBIA0228E
JEM127G
SBIA0208E
SBIA0215E
Page 202 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide EM-152
[YD22DDTi]
FUEL SUPPLY PUMP
INSPECTION AFTER REMOVAL
Timing Chain
Check for cracks and excessive wear at roller links. Replace
chain if necessary.
INSTALLATION
1. Install new O-rings t NISSAN X-TRAIL 2001 Service Owners Guide EM-152
[YD22DDTi]
FUEL SUPPLY PUMP
INSPECTION AFTER REMOVAL
Timing Chain
Check for cracks and excessive wear at roller links. Replace
chain if necessary.
INSTALLATION
1. Install new O-rings t](/img/5/57405/w960_57405-201.png)
EM-152
[YD22DDTi]
FUEL SUPPLY PUMP
INSPECTION AFTER REMOVAL
Timing Chain
Check for cracks and excessive wear at roller links. Replace
chain if necessary.
INSTALLATION
1. Install new O-rings to the fuel supply pump housing.
2. Install fuel supply pump housing to the fuel supply pump.
●Using a hexagon -head wrench [face to face 5 mm (0.20 in)
SST], tighten the fuel supply pump housing mounting bolt.
3. Install coupling to the fuel supply pump.
●Using the TORX wrench (SST), tighten the sprocket nut to fix
the coupling.
4. Install adjusting shim.
●For shim adjustment, measure dimension L (Distance
between front surface of the coupling and the fuel supply
pump flange) at 2 opposing points near the coupling bolt cen-
ter. Use the average of these two measurements to select the
shim grade that marked on adjusting shim.
●The shim adjustment is required only when the fuel supply
pump is replaced.
SEM984C
PBIC0904E
PBIC0902E
PBIC0905E
Part No. of adjusting shim Grade number Measuring dimension L mm (in)
16614 8H800 0.5 t 39.23 - 39.77 (1.5445 - 1.5657)
16614 8H810 1.0 t 38.76 - 39.23 (1.5260 - 1.5445)
16614 8H860 1.2 t 38.57 - 38.76 (1.5185 - 1.5260)
16614 8H820 1.6 t 38.18 - 38.57 (1.5031 - 1.5185)
Page 204 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide EM-154
[YD22DDTi]
FUEL SUPPLY PUMP
13. Install secondary timing chain.
●When installing, match the alignment marks on sprockets with
color coded alignment marks (colored links) on the chain.
14. Ins NISSAN X-TRAIL 2001 Service Owners Guide EM-154
[YD22DDTi]
FUEL SUPPLY PUMP
13. Install secondary timing chain.
●When installing, match the alignment marks on sprockets with
color coded alignment marks (colored links) on the chain.
14. Ins](/img/5/57405/w960_57405-203.png)
EM-154
[YD22DDTi]
FUEL SUPPLY PUMP
13. Install secondary timing chain.
●When installing, match the alignment marks on sprockets with
color coded alignment marks (colored links) on the chain.
14. Install timing chain tension guide.
●The upper bolt has a longer shank than the lower bolt.
15. Using a hexagon-head wrench [face to face: 6 mm (0.24 in),
SST], install timing chain slack guide.
16. Install chain tensioner.
a. Push the plunger of the chain tensioner. While holding it with a
push pin, install the chain tensioner.
b. Using a hexagon-head wrench [face to face: 5 mm (0.20 in),
SST], tighten bolts.
c. Pull out the push pin, etc. holding the plunger.
●Check again that the alignment marks on the sprockets
and the colored alignment marks on the timing chain are
aligned.
17. Install front chain case.
a. Install tension guide on the back surface of front chain case.
●Hold front chain case vertically when installing. Tension guide
may come off if front chain case is tilted.
JEM128G
SBIA0228E
SBIA0227E
SBIA0189E
Page 205 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide FUEL SUPPLY PUMP
EM-155
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
b. Apply Genuine Liquid Gasket or equivalent (Refer to EM-111,
"Precautions For Liquid Gasket" .) on both ends of arched NISSAN X-TRAIL 2001 Service Owners Guide FUEL SUPPLY PUMP
EM-155
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
b. Apply Genuine Liquid Gasket or equivalent (Refer to EM-111,
"Precautions For Liquid Gasket" .) on both ends of arched](/img/5/57405/w960_57405-204.png)
FUEL SUPPLY PUMP
EM-155
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
b. Apply Genuine Liquid Gasket or equivalent (Refer to EM-111,
"Precautions For Liquid Gasket" .) on both ends of arched area
(locations where rear chain case is adjoined) as shown in the
figure.
c. Install front chain case.
●When installing, align dowel pin on oil pump case with the pin
hole.
●Install No. 6, 10 and 11 bolts with the rubber washer to the
front chain case.
d. Tighten fixing bolts in the numerical order shown in the figure.
e. After tightening all the bolts, re-tighten in the same order.
18. Install the fuel supply pump rear bracket.
●Tighten fixing bolts in the numerical order shown in the figure.
19. Connect the harness connector to fuel supply pump.
20. Install fuel hoses.
21. Hereafter, install in the reverse order of removal.
JEF370Y
JEM121G
PBIC0984E
Page 208 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide EM-158
[YD22DDTi]
CAMSHAFT
CAMSHAFT
PFP:13001
Removal and InstallationEBS00LRR
CAUTION:
Apply new engine oil to parts marked in illustration before installation.
●This engine will have a different v NISSAN X-TRAIL 2001 Service Owners Guide EM-158
[YD22DDTi]
CAMSHAFT
CAMSHAFT
PFP:13001
Removal and InstallationEBS00LRR
CAUTION:
Apply new engine oil to parts marked in illustration before installation.
●This engine will have a different v](/img/5/57405/w960_57405-207.png)
EM-158
[YD22DDTi]
CAMSHAFT
CAMSHAFT
PFP:13001
Removal and InstallationEBS00LRR
CAUTION:
Apply new engine oil to parts marked in illustration before installation.
●This engine will have a different valve arrangement from normal
DOHC 4-valve type engines. As both camshafts on this engine
have intake and exhaust camshafts, in this chapter they are
named as follows:
●Refer to the figure for intake and exhaust valve arrangement.
(The camshafts have, alternately, either an intake valve or an
exhaust valve.)
REMOVAL
1. Drain engine coolant. Refer to CO-29, "Changing Engine Coolant" .
2. Remove charge air cooler. Refer to EM-122, "
Removal and Installation" .
3. Remove air duct and air inlet pipe. Refer to EM-120, "
Removal and Installation" .
4. Remove rocker cover. Refer to EM-156, "
Removal and Installation" .
5. Remove vacuum pump. Refer to EM-139, "
Removal and Installation" .
6. Remove injection tube and fuel injector. Refer to EM-144, "
Removal and Installation" .
7. Remove secondary timing chain. Refer to EM-167, "
Removal and Installation" .
SBIA0177E
1. Camshaft bracket 2. Camshaft (right side) 3. Camshaft (left side)
4. Camshaft sprocket (right side) 5. Camshaft sprocket (left side)6. Adjusting shim
7. Valve lifter 8. Cylinder head
Camshaft (Right side) : Intake manifold side
Camshaft (Left side) : Exhaust manifold side
SBIA0178E
Page 212 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide EM-162
[YD22DDTi]
CAMSHAFT
INSTALLATION
1. Install the valve lifter and adjusting shim.
●Make sure that these are installed in the same position as before the removal process.
2. Install the camshaf NISSAN X-TRAIL 2001 Service Owners Guide EM-162
[YD22DDTi]
CAMSHAFT
INSTALLATION
1. Install the valve lifter and adjusting shim.
●Make sure that these are installed in the same position as before the removal process.
2. Install the camshaf](/img/5/57405/w960_57405-211.png)
EM-162
[YD22DDTi]
CAMSHAFT
INSTALLATION
1. Install the valve lifter and adjusting shim.
●Make sure that these are installed in the same position as before the removal process.
2. Install the camshaft.
●Identify camshafts by the paint position and screw hole at the
rear end.
●Install so that knock pins are positioned in the directions
shown in the figure.
3. Install camshaft brackets.
●Install correctly, identifying brackets by the journal No. and
front mark on top surface.
4. Tighten bolts in the order shown in the figure according to the
following procedure:
a. Tighten to 2.0 N·m (0.2 kg-m, 17 in-lb).
●Make sure camshaft thrusting parts (on rear side) securely fit
in their mating parts on the cylinder head.
b. Tighten to 6 N·m (0.6 kg-m, 52 in-lb).
c. Tighten to 12 to 13 N·m (1.2 to 1.4 kg-m, 9 to 10 ft-lb).
5. Install camshaft sprockets.
●Camshaft sprockets are commonly used for RH and LH.
●Align camshaft sprocket and dowel pin on camshaft, and
install.
●Holding the hexagonal part of camshaft with a wrench, tighten bolt securing camshaft sprocket.
6. Before installing spill tube after installing secondary timing chain, check and adjust valve clearance. Refer
to EM-163, "
Valve Clearance" .
7. Hereafter, install in the reverse order of removal.Camshaft RH:
Paint is at position A without screw hole.
Camshaft LH:
Paint is at position B with screw hole.
JEM173G
SEM516G
JEM175G
JEM160G
Page 213 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide CAMSHAFT
EM-163
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
Va l v e C l e a r a n c eEBS00LRS
INSPECTION
●When the camshaft or parts in connection with valves are
removed or replaced, and a NISSAN X-TRAIL 2001 Service Owners Guide CAMSHAFT
EM-163
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
Va l v e C l e a r a n c eEBS00LRS
INSPECTION
●When the camshaft or parts in connection with valves are
removed or replaced, and a](/img/5/57405/w960_57405-212.png)
CAMSHAFT
EM-163
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
Va l v e C l e a r a n c eEBS00LRS
INSPECTION
●When the camshaft or parts in connection with valves are
removed or replaced, and a malfunction has occurred (poor
starting, idling, or other malfunction) due to the misadjustment of
the valve clearance, inspect as follows.
●Inspect and adjust when the engine is cool (at normal tempera-
ture).
●Be careful of the intake and exhaust valve arrangement. The
valve arrangement is different from that in a normal engine.
NOTE:
The camshafts have, alternately, either an intake valve or an
exhaust valve.(Refer to illustration)
1. Drain engine coolant. Refer to CO-29, "
Changing Engine Coolant" .
2. Remove charge air cooler. Refer to EM-122, "
Removal and Installation" .
3. Remove air duct and air inlet pipe. Refer to EM-120, "
Removal and Installation" .
4. Remove rocker cover. Refer to EM-156, "
Removal and Installation" .
5. Remove vacuum pump. Refer to EM-139, "
Removal and Installation" .
6. Remove injection tube and fuel injector. Refer to EM-144, "
Removal and Installation" .
7. Remove secondary timing chain. Refer to EM-167, "
Removal and Installation"
Check valve clearance while engine is cold and not running.
8. Set the No. 1 piston to TDC on its compression stroke.
●Turn crankshaft pulley clockwise so that the knock pin on
camshaft LH faces straight above. (No position indicator, etc.
is provided on the crankshaft pulley.)
9. Put an alignment mark with paint, etc. on the crankshaft pulley
and on the oil pump as an angle indicator.
10. While referring to the figure, measure the valve clearance
marked in the table below.
●The injection order is 1-3-4-2.
SBIA0178E
SBIA0179E
JEM177G
Measuring pointNo. 1 No. 2 No. 3 No. 4
INT EXH INT EXH INT EXH INT EXH
When the No. 1
cylinder is in the
TDCXXX X
SBIA0180E
Page 217 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide SECONDARY TIMING CHAIN
EM-167
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
SECONDARY TIMING CHAINPFP:13028
Removal and InstallationEBS00LRT
CAUTION:
●After removing timing chain, do not turn crankshaft and NISSAN X-TRAIL 2001 Service Owners Guide SECONDARY TIMING CHAIN
EM-167
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
SECONDARY TIMING CHAINPFP:13028
Removal and InstallationEBS00LRT
CAUTION:
●After removing timing chain, do not turn crankshaft and](/img/5/57405/w960_57405-216.png)
SECONDARY TIMING CHAIN
EM-167
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
EM
SECONDARY TIMING CHAINPFP:13028
Removal and InstallationEBS00LRT
CAUTION:
●After removing timing chain, do not turn crankshaft and camshaft separately, or valves will strike
piston heads.
●When installing camshafts, chain tensioners, oil seals or other sliding parts, lubricate contacting
surfaces with new engine oil.
●Apply new engine oil to parts marked in illustration before installation.
REMOVAL
●For preparative work for removing/installing secondary timing chain to remove/install electronic fuel supply
pump. Refer to EM-147, "
FUEL SUPPLY PUMP" .
●To prepare for removing/installing secondary timing chain to remove/install camshaft. Refer to EM-158,
"Removal and Installation" .
1. Remove engine coolant reservoir tank.
2. Remove RH engine mount insulator and bracket. Refer to EM-193, "
Removal and Installation" .
3. Pull power steering reservoir tank out of brackets to move power steering piping.
CAUTION:
To avoid removing power steering reservoir tank out of brackets move it with power steering pip-
ing aside.
PBIC1238E
Page 218 of 3833
![NISSAN X-TRAIL 2001 Service Owners Guide EM-168
[YD22DDTi]
SECONDARY TIMING CHAIN
4. Remove front chain case.
●Loosen fixing bolts in the reverse order of that shown in the
figure and remove them.
●Remove No. 6, 10 and 11 bolt NISSAN X-TRAIL 2001 Service Owners Guide EM-168
[YD22DDTi]
SECONDARY TIMING CHAIN
4. Remove front chain case.
●Loosen fixing bolts in the reverse order of that shown in the
figure and remove them.
●Remove No. 6, 10 and 11 bolt](/img/5/57405/w960_57405-217.png)
EM-168
[YD22DDTi]
SECONDARY TIMING CHAIN
4. Remove front chain case.
●Loosen fixing bolts in the reverse order of that shown in the
figure and remove them.
●Remove No. 6, 10 and 11 bolts with the rubber washer as
space is limited for pulling them out.
CAUTION:
●While front chain case is removed, cover openings to
prevent entry of foreign material into engine.
●Do not remove two mass dampers on the back of
cover.
5. Set the No. 1 piston to TDC on its compression stroke.
●Turn crankshaft pulley clockwise so that the alignment mark
(punched mark) on each camshaft sprocket is positioned as
shown in the figure.
●No position indicator is provided on the crankshaft pul-
ley.
●When installing, color coded links on the secondary tim-
ing chain can be used as alignment marks. Marking may
not be necessary for removal; however, make alignment
marks as required because the alignment mark on fuel
supply pump sprocket may not be easy to see.
6. Remove chain tensioner.
a. Push the plunger of chain tensioner and keep it pressed with a
push pin.
b. Using a hexagon-head wrench [face to face: 5 mm, (0.20 in)
SST], remove bolts to remove chain tensioner.
JEM121G
SBIA0189E
SEM515G
JEM124G
SBIA0227E