tow bar Peugeot 307 SW 2002 Owner's Manual
[x] Cancel search | Manufacturer: PEUGEOT, Model Year: 2002, Model line: 307 SW, Model: Peugeot 307 SW 2002Pages: 137, PDF Size: 1.43 MB
Page 95 of 137

YOUR 307 SW IN DETAIL91
BOOT LAYOUT
1 - Grab handles and coat hooks
2 - High load retaining net fastenings The high load retaining net can be fitted in the 2nd or
3rd row. Open the covers of the corresponding upper faste- nings. Fit the ends of the metal bar in these fastenings.Secure the two opaque material strap hooks in the sto-
wing rings on the floor. The rings are located directly below the corresponding upper fastenings. Pull the two straps taut.Secure the two hooks on the elastic parts of the opaque material in these rings. Note: the net must be positioned so that the label can
be seen from the boot. This ensures that the central
seat belt is routed correctly.
3 - 12V Socket for accessories This is a 12 volt socket (lighter type), installed on thetonneau left support.
It is supplied with the ignition off.
4 - Rear armrests with grab handle
5 - Storage nets One of them contains the luggage retaining net. 6 - Tonneau
To install it:
Ð position one end of the tonneau roller in the 2nd row,
Ð compress the opposite end of the roller and position it,
Ð release it to allow it to engage,
Ð unroll the tonneau as far as the boot pillars,
Ð insert the tonneau guides in the rails in the pillars. To remove it:
Ð remove the tonneau guides from the pillar rails,
Ð return the tonneau into its roller,
Ð compress it and remove it from its support at the 2nd row,
To store it, pull it back and place it with the two storage nets, already lowered. Note: the roller has two hooks for securing the lugga-
ge retaining net depending on where it is installed.
7 - Luggage retaining net Secure the net's seven hooks in the stowing rings and
the fastenings on the floor.
8 - Luggage retaining net fastenings ("hammock" version) in the tailgate Fold the net in two. Secure the two centre hooks in the stowing rings on the
floor. Secure the net's remaining four hooks on the boot pillars.
See configuration of the nets (next page)