tow RENAULT TWINGO RS 2009 2.G Engine And Peripherals Owner's Guide
[x] Cancel search | Manufacturer: RENAULT, Model Year: 2009, Model line: TWINGO RS, Model: RENAULT TWINGO RS 2009 2.GPages: 652
Page 102 of 652

10A-96
ENGINE AND CYLINDER BLOCK ASSEMBLY
Engine - gearbox assembly: Removal - Refitting
K4M
10A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
aRemove the air filter unit (see 12A, Fuel mixture,
Air filter unit: Removal - Refitting, page 12A-13) .
aRemove the battery (see Battery: Removal - Refit-
ting) (80A, Battery).
aRemove:
-the petrol injection computer (see 17B, Petrol in-
jection, Petrol injection computer: Removal -
Refitting, page 17B-20) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (80A, Battery),
-the front wheels (see Wheel: Removal - Refitting)
(35A, Wheels and tyres),
-the engine undertray,
-the front wheel arch liners (see Front wheel arch
liner: Removal - Refitting) (55A, Exterior protec-
tion),
-the front bumper (see Front bumper: Removal -
Refitting) (55A, Exterior protection).
aDrain:
-the gearbox (see Manual gearbox oils: Draining -
Filling) (21A, Manual gearbox),-the cooling system (see 19A, Cooling, Cooling
system: Draining - Refilling, page 19A-9) ,
-the engine, if necessary (see 10A, Engine and
cylinder block assembly, Engine oil: Draining -
Refilling, page 10A-22) ,
-the refrigerant circuit using a refrigerant charging
station (see Refrigerant circuit: Draining - Fill-
ing) (62A, Air conditioning).
aAttach the « engine cooling radiator - condenser »
assembly to the front upper cross member.
aRemove:
-the engine tie-bar (see 19D, Engine mounting,
Lower engine tie-bar: Removal - Refitting, page
19D-18) ,
-the front axle subframe (see Front axle subframe:
Removal - Refitting) (31A, Front axle compo-
nents),
-the radiator mounting cross member (see Radiator
mounting cross member: Removal - Refitting)
(41A, Front lower structure),
-the front left-hand wheel driveshaft (see Front left-
hand driveshaft: Removal - Refitting) (29A,
Driveshafts),
-the front right-hand wheel driveshaft (see Front
right-hand driveshaft: Removal - Refitting)
(29A, Driveshafts),
-the differential output seal (see Differential output
seal: Removal - Refitting) (21A, Manual gear-
box).
aRemove the catalytic converter (see 19B, Exhaust,
Catalytic converter: Removal - Refitting, page
19B-12) . Special tooling required
Mot. 1448Remote operation pliers for
hose clips .
Equipment required
refrigerant charging station
Tightening torquesm
rubber pad mounting
bolts for the suspended
engine mounting on the
gearbox21 N.m
bolts of the suspended
mounting r ubber pad62 N.m
suspended engine
mounting shaft nut62 N.m
Page 112 of 652

10A-106
ENGINE AND CYLINDER BLOCK ASSEMBLY
Valves: Adjustment
D4F or D7F
10A
I - PREPARATION STAGE FOR ADJUSTING THE
VALVE CLEARANCES
aPosition the vehicle on a two-post lift ( (see Vehicle:
Towing and lifting) ).
aDisconnect the battery ( (see Battery: Removal -
Refitting) ).
aRemove:
-the front right-hand wheel, (see Front wheel arch
liner: Removal - Refitting)
-the front right-hand wheel arch liner (see MR 412
Bodywork, 55A, Exterior protection, Wheel arch
liner: Removal - Refitting),
-the air filter unit (see 12A, Fuel mixture, Air filter
unit: Removal - Refitting, page 12A-13) ,
-the inlet manifold (see 12A, Fuel mixture, Inlet
distributor: Removal - Refitting, page 12A-29) ,
-the rocker cover (see 11A, Top and front of en-
gine, Rocker cover: Removal - Refitting, page
11A-66) .
II - ADJUSTING THE VALVE CLEARANCES
aAdjust the valve clearances (see Technical Note
6004A, Petrol engine - 4 cylinder - D4, 10A, Tim-
ing-Cylinder head: Refitting).
aAdjust the valve clearances (see MR Components,
MR - Mot - D - (E), 4 cylinder cast-iron engine
(petrol), 10 Engine and peripherals, Engine re-
pair).
III - FINAL OPERATION
aRefit:
-the rocker cover (see 11A, Top and front of en-
gine, Rocker cover: Removal - Refitting, page
11A-66) ,
-the inlet manifold (see 12A, Fuel mixture, Inlet
distributor: Removal - Refitting, page 12A-29) ,
-the air filter unit (see 12A, Fuel mixture, Air filter
unit: Removal - Refitting, page 12A-13) ,-the front right-hand wheel arch liner (see MR 412
Bodywork, 55A, Exterior protection, Wheel arch
liner: Removal - Refitting),
-the front right-hand wheel ( (see Wheel: Removal
- Refitting) ).
aConnect the battery ( (see Battery: Removal - Re-
fitting) ).
D4F
D7F
Page 113 of 652

10A-107
ENGINE AND CYLINDER BLOCK ASSEMBLY
Flywheel: Removal - Refitting
D4F – D7F – K9K
10A
REMOVAL
I - REFITTING PREPARATIONS OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aDisconnect the battery (see Battery: Removal - Re-
fitting) (MR 411, 80A, Battery).
aRemove:
-the gearbox (see Manual gearbox: Removal - Re-
fitting) ,
-the clutch plate and pressure plate (see Pressure
plate - Disc: Removal - Refitting) .II - OPERATION FOR REMOVAL OF PART
CONCERNED
aLock the engine using tool (Mot. 582-01) (1) .
aRemove:
-the flywheel bolts,
-the flywheel,
-tool (Mot. 582-01). Special tooling required
Mot. 582-01Flywheel locking tool.
Tightening torquesm
D4F, D7F flywheel bolts18 Nm + 110˚ ±± ± ±
10˚
K9K flywheel bolts70 Nm
109158
Page 116 of 652

10A-110
ENGINE AND CYLINDER BLOCK ASSEMBLY
Flywheel: Removal - Refitting
K4M
10A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
aRemove:
-the engine undertray,
-the battery (see Battery: Removal - Refitting)
(80A, Battery),
-the air filter unit (see 12A, Fuel mixture, Air filter
unit: Removal - Refitting, page 12A-13) ,
-the petrol injection computer (see 17B, Petrol in-
jection, Petrol injection computer: Removal -
Refitting, page 17B-20) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (80A, Battery),
-the front wheels (see Wheel: Removal - Refitting)
(35A, Wheels and tyres),
-the front wheel arch liners (see Front wheel arch
liner: Removal - Refitting) (55A, Exterior protec-
tion),
-the front bumper (see Front bumper: Removal -
Refitting) (55A, Exterior protection).
aDrain:
-the gearbox (see Manual gearbox oils: Draining -
Filling) (21A, Manual gearbox),
-the engine cooling system (see 19A, Cooling,
Cooling system: Draining - Refilling, page 19A-
9) ,
-the refrigerant circuit using a refrigerant charging
station (see Refrigerant circuit: Draining - Fill-
ing) (62A, Air conditioning).aRemove:
-the lower engine tie-bar (see 19D, Engine mount-
ing, Lower engine tie-bar: Removal - Refitting,
page 19D-18) ,
-the front axle subframe (see Front axle subframe:
Removal - Refitting) (31A, Front axle compo-
nents),
-the front left-hand wheel driveshaft (see Front left-
hand driveshaft: Removal - Refitting) (29A,
Driveshafts),
-the front right-hand wheel driveshaft (see Front
right-hand driveshaft: Removal - Refitting)
(29A, Driveshafts),
-the differential output seals (see Differential out-
put seal: Removal - Refitting) (21A, Manual gear-
box),
-the « engine - gearbox » assembly (see 10A, En-
gine and cylinder block assembly, Engine -
gearbox assembly: Removal - Refitting, page
10A-74) (21A, Manual gearbox),
-the manual gearbox (see Manual gearbox: Re-
moval - Refitting) ,
-the « pressure plate - disc » assembly (see Pres-
sure plate - Disc: Removal - Refitting) (20A,
Clutch).
II - REMOVAL OPERATION
aRemove:
-the flywheel bolts,
-the (Mot. 1677) (1) , Special tooling required
Mot. 1677Flywheel locking tool.
Equipment required
refrigerant charging station
Tightening torquesm
flywheel bolts70 N.m
109158
Page 120 of 652

11A-3
TOP AND FRONT OF ENGINE
Accessories belt: Removal - Refitting
D4F, and 772, and STANDARD HEATING – D7F, and STANDARD HEATING
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aDisconnect the battery (see Battery: Removal - Re-
fitting) (80A, Battery).
aUndo the alternator bolts (1) .
aSwing the alternator towards the engine.
II - OPERATION FOR REMOVAL OF PART
CONCERNED
aRemove the accessories belt.
REFITTING
I - REFITTING PREPARATION OPERATION
aUse a brush to remove any deposits from the crank-
shaft accessories pulley V grooves.
aparts always to be replaced: Accessories belt.
II - REFITTING OPERATION FOR PART
CONCERNED
aRefit the accessories belt. Special tooling required
Mot. 1715Belt tension checking tool
(frequency indicator).
Mot. 1505Belt tension setting tool (fre-
quency meter)
Tightening torquesm
alter nator lower bolt50 N.m
alter nator upper bolt25 N.m
120305
WARNING
Only use brushes with plastic or non-corrosive
metal (br ass) bristles.
Page 121 of 652

11A-4
TOP AND FRONT OF ENGINE
Accessories belt: Removal - Refitting
D4F, and 772, and STANDARD HEATING – D7F, and STANDARD HEATING
11A
Accessories belt tensioning process
aTension the accessories belt by swinging the alter-
nator towards the front using a lever.
aSet the accessories belt tension using the (Mot.
1715) or the (Mot. 1505) to a value of 244 Hz ±± ± ±
5.
aTorque tighten:
-the alternator lower bolt (50 N.m),
-the alternator upper bolt (25 N.m).
aTurn the engine three revolutions clockwise (timing
end) to position the accessories belt correctly.
aCheck the accessories belt tension using the (Mot.
1715) or the (Mot. 1505).
aIf the accessories belt tension is outside permitted
tolerance values, readjust the tension.
III - FINAL OPERATION
aConnect the battery (see Battery: Removal - Refit-
ting) (80A, Battery).
120525
Page 122 of 652

11A-5
TOP AND FRONT OF ENGINE
Accessories belt: Removal - Refitting
K9K, and AIR CONDITIONING
11A
PARTS AND CONSUMABLES FOR THE
REPAIR WORK
aParts always to be replaced:
-accessories belt,
-accessories belt tensioning roller,
-accessories belt tensioning roller bolt,
-axle sub-frame bolts.
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aDisconnect the battery (see ) (MR 411, 80A, Bat-
tery).
aRemove:
-the wiper arms (see Windscreen wiper arm: Re-
moval - Refitting) (MR 411, 85A, Wipers - Wash-
ers),
-the scuttle panel grille (see Scuttle panel grille:
Removal - Refitting) (MR 412, 56A, Exterior
equipment),
-the scoop under the scuttle panel grille (see Scoop
under the scuttle panel grille: Removal - Refit-
ting) (MR 412, 56A, Exterior equipment).
-the front right-hand wheel (see Wheel: Removal -
Refitting) (MR 411, 35A, Wheels and tyres),
-the front right-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Exterior protection),
-the front bumper (see Front bumper: Removal -
Refitting) (MR 412, 55A, Exterior protection),
-the left-hand and right-hand headlights (see Halo-
gen headlight: Removal - Refitting) (MR 411,
80B, Headlights).aRemove:
-the air filter inlet air pipe bolt from the front upper
cross member,
-the expansion bottle bolt from the front upper cross
member,
-the cooling radiator retaining bracket bolt from the
front upper cross member.
aUnclip and then remove from the front upper cross
member:
-the air filter inlet air pipe,
-the expansion bottle.
aRemove the bonnet catch bolts.
aRemove the « cable - bonnet catch » assembly.
aRemove:
-the front upper cross member (see Front upper
cross member: Removal - Refitting) (MR 412,
42A, Upper front structure),
-the air conditioning pipe clip from the right-hand
headlight carrier panel,
-the right-hand suspended engine mounting (see
19D, Engine mounting, Right-hand suspended
engine mounting: Removal - Refitting, page
19D-13) .
II - OPERATION FOR REMOVAL OF PART
CONCERNED
1 - Removing the accessories belt
aRaise the engine using the (Mot. 1672) to access
the tensioning roller.
aRelax the accessories belt using a ratchet, an exten-
sion and a 16 mm socket.
aRemove the belt, passing it over its slot between the
headlight carrier panel and the alternator pulley.
aLower the engine using tool (Mot. 1672). Special tooling required
Mot. 1672Low er engine support.
Tightening torquesm
tensioning roller bolt40 Nm
alter nator bolts25 Nm
Note:
Shift the engine forwards slightly by hand to facil-
itate setting up the tools.
Page 125 of 652

11A-8
TOP AND FRONT OF ENGINE
Accessories belt: Removal - Refitting
D4F, and 772 or 780 or 782, and AIR CONDITIONING – D7F, and AIR CONDITIONING
11A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
aDisconnect the battery (see Battery: Removal - Re-
fitting) (80A, Battery).
aRemove:
-the front right-hand wheel (see Wheel: Removal -
Refitting) (35A, Wheels and tyres),
-the front right-hand wheel arch liner clips,
-the front right-hand wheel arch liner bolts,
aRemove the lower section of the front right-hand
wheel arch liner.II - OPERATION FOR REMOVAL OF PART
CONCERNED
a
aRemove the accessories belt tensioning roller pro-
tector.
aUndo the accessories belt tensioning roller bolt.
aRemove:
-the accessories belt,
-the accessories belt tensioning roller bolt,
-the accessories belt tension wheel.
REFITTING
I - REFITTING PREPARATION OPERATION
aUse a brush to remove any deposits from the crank-
shaft pulley V-grooves.
aparts always to be replaced: Accessories belt.
aparts always to be replaced: Accessories belt
tensioning roller. Special tooling required
Mot. 1715Belt tension checking tool
(frequency indicator).
Mot. 1505Belt tension setting tool (fre-
quency meter)
Equipment required
open-ended spanner
Tightening torquesm
tensioning roller bolt44 N.m
120775
109766
IMPORTANT
Wear cut-resistant gloves during the operation.
WARNING
Only use brushes with plastic or non-corrosive
metal (br ass) bristles.
Page 127 of 652

11A-10
TOP AND FRONT OF ENGINE
Accessories belt: Removal - Refitting
K9K, and STANDARD HEATING
11A
PARTS AND CONSUMABLES FOR THE
REPAIR WORK
aParts always to be replaced:
-accessories belt,
-accessories belt tensioning roller,
-accessories belt tensioning roller bolt
-the air conditioning compressor substitute pulley,
-axle sub-frame bolts.
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aDisconnect the battery (see ) (MR 411, 80A, Bat-
tery).
aRemove:
-the front right-hand wheel (see Wheel: Removal -
Refitting) (MR 411, 35A, Wheels and tyres),
-the front right-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Exterior protection),
-the front bumper (see Front bumper: Removal -
Refitting) (MR 412, 55A, Exterior protection),
-the left-hand and right-hand headlights (see Halo-
gen headlight: Removal - Refitting) (MR 411,
80B, Headlights).aRemove:
-the air filter inlet air pipe bolt from the front upper
cross member,
-the expansion bottle bolt from the front upper cross
member,
-the cooling radiator retaining bracket bolt from the
front upper cross member.
aUnclip and then remove from the front upper cross
member:
-the air filter inlet air pipe,
-the expansion bottle.
aRemove the bonnet catch bolts.
aRemove the « cable - bonnet catch » assembly.
aRemove the front upper cross member (see Front
upper cross member: Removal - Refitting) (MR
412, 42A, Upper front structure).
II - OPERATION FOR REMOVAL OF PART
CONCERNED
1 - Removing the accessories belt
aRelax the accessories belt using a 16 mm spanner.
aRemove the accessories belt from the air condition-
ing compressor substitute pulley.
aRemove the accessories belt, passing it over its slot
between the RH side member and the crankshaft
accessories and alternator pulleys.
aDiscard the accessories belt
2 - Removing the tensioning roller and the air
conditioning compressor substitute pulley
a
aDisconnect the connector on the alternator.
aRemove the nut from the alternator harness.
aMove the alternator harness to one side.
aRemove the alternator upper bolt.
aLoosen the alternator lower bolt.
aRemove the alternator with its lower bolt fitted. Tightening torquesm
air conditioning com-
pressor substitute pul-
ley bolts25 Nm
tensioning roller bolt40 Nm
bolts mounting the mul-
tifunction support on the
cylinder block44 Nm
bolt mounting the multi-
function support on the
sump25 Nm
alter nator bolts25 Nm
Note:
The tensioning roller and air conditioning com-
pressor substitute pulley must be replaced every
time the accessor ies belt is replaced.
Page 130 of 652

11A-13
TOP AND FRONT OF ENGINE
Accessories belt: Removal - Refitting
D4F, and 780 or 782, and STANDARD HEATING
11A
a
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).aRemove:
-the filler neck bolt (1) ,
-the filler neck in the direction of the arrow (2) ,
-the front right-hand wheel (see Wheel: Removal -
Refitting) (35A, Wheels and tyres),
-the front right-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (55A, Ex-
terior protection).
aUndo the lower bolt on the sub-frame tie-rod.
aRemove the upper bolt from the sub-frame tie-rod.
aRemove the sub-frame tie-rod. Special tooling required
Mot. 1715Belt tension checking tool
(frequency indicator).
Mot. 1505Belt tension setting tool (fre-
quency meter)
Equipment required
repositioner
Tightening torquesm
tensioning roller bolt44 N.m
sub-frame tie-rod lower
bolt62 N.m
sub-frame tie-rod upper
bolt21 N.m
IMPORTANT
Wear cut-resistant gloves during the operation.
122392