SSANGYONG MUSSO 2003 Service Manual
Manufacturer: SSANGYONG, Model Year: 2003, Model line: MUSSO, Model: SSANGYONG MUSSO 2003Pages: 1574, PDF Size: 26.41 MB
Page 101 of 1574

M162 ENGINE MECHANICAL 1B1-65
Adjustment Procedure
1. Position the No.1 cylinder to BTDC 30° .
2. Remove the chain tensioner.
3. Remove the exhaust camshaft sprocket.
4. Align the intake and exhaust camshaft flange hole with the cylinder head upper surface.
Intake Side : 3 o ’clock direction
Exhaust Side : 9 o ’clock direction
5. Secure the intake and exhaust camshaft.
6. Position the piston of No.1 cylinder at TDC (OT) by turning the crankshaft.
7. Turn the camshaft adjuster of the intake camshaft to the left as much as possible (cam adjuster ‘retarded ’ position).
8. Install the chain to the intake camshaft sprocket.
Notice
Timing chain must be placed on the guide rail in gear case
cover.
Tools Required 104 589 01 01 00
Spanner
Inspection
1. Position the No.1 cylinder piston to TDC (OT) by turning the crankshaft. Notice When the OT mark on vibration damper is aligned with timing
gear case cover, the intake and exhaust cam of cylinderwill make the slope to the center and will face up. In this
way, the adjustment hole of the intake and exhaust camshaft will match in line with the cylinder head upper end, at 3
o’clock, and 9 o ’clock direction each other.
2. Check the timing as below procedure; - Check if the camshaft adjustment hole is positioned to 3 o’clock direction at the intake side and to 9 o ’clock
direction at the exhaust side, respectively and align withthe cylinder head mating surface.
- At this condition, check if the OT mark on vibration damper aligns with the marker on the timing gear case.
Page 102 of 1574

1B1-66 M162 ENGINE MECHANICAL
11. Check the camshaft timing.The sprocket bolt is designed to be used only once, so replace with new one.
10. Install the chain tensioner.
Installation Notice Tightening Torque
1st step 18 - 22 Nm
2nd step 90
° ± 5 °
9. Install the chain to the exhaust camshaft sprocket and
install it to the camshaft. Installation Notice (Sprocket Bolt)
TighteningTorque Screw Plug
40 Nm
Tensioner Assembly
72 - 88 Nm
Page 103 of 1574

M162 ENGINE MECHANICAL 1B1-67
VALVE SPRING
Preceding Work : Removal of camshaftRemoval of spark plug
1 Valve Tappet Assembly
2 Valve Cotter
3 Upper Retainer
4 Valve Spring..........Check, Replace if necessary
5 Valve Stem Seal
6 Lower Retainer 7 Connecting Hose
8 Thrust Piece
9 Slide
10 Adjust Bolt
11 Lever Pusher
12 Supporting Bar
Page 104 of 1574

1B1-68 M162 ENGINE MECHANICAL
Tools Required
111 589 01 59 00 Supporting Bar
111 589 18 61 00 Lever Pusher
111 589 25 63 00 Thrust Piece
116 589 06 63 00 Magnetic Finger Removal & Installation Procedure
1. Place the supporting bar (12) and the slide (9) at thecamshaft bearing cap (Nos 1 & 7/8&14) and tighten them with the bearing cap bolt. Installation Notice
2. Turn the crankshaft to position the each cylinder piston at TDC.
5. Install the engine lock to the ring gear to prevent the crankshaft from rotating.
6. Blow up with compressed air. Notice
Remove the valve spring only at TDC.
Always rotate the crankshaft by holding the chain to prevent from timing chain damage and tangling, and for smooth rotation.
3. Remove the valve tappet (1) using the magnetic finger.
4. Install the leakage tester connecting hose to the spark plug hole. Supporting Bar 111 589 01 59 00
Tightening Torque 22.5 - 27.5 Nm
Mark on The Vibration Damper
OT
120 °
240 °Cylinder
1, 6 2, 5 3, 4
Page 105 of 1574

M162 ENGINE MECHANICAL 1B1-69
8. Install the lever pusher (11) and the thrust piece (8) to theslide (9).
13. Remove the valve cotter (2) using either the pincette (13) or magnetic finger. Lever Pusher 111 589 18 61 00
Magnetic Finger 116 589 06 63 00
9. Mount the thrust piece (8) vertically to the valve spring
retainer (3).
10. Make the thrust piece (8) and the slide (9) perpendicular to each other.
11. Secure the slide (9) by turning the adjust bolt (10).
12. Press the valve spring (4) by using the lever pusher (11).
14. Remove the upper retainer (3) and the valve spring (4).
15. Remove the valve stem seal and replace if necessary.
Notice
Check the valve stem seal and replace if necessary.
16. Remove the lower retainer (6).
NoticeCheck the retainer for damages and replace with a new
one if necessary.
17. Installation should follow the removal procedure in the reverse order.