3. CHECK SUNROOF SWITCH
1. Disconnect sunroof switch connector.
2. Operate sunroof slide switch, and check continuity of the sun-
roof switch as follows.
OK or NG
OK >> Check the condition of the harness and connector.
NG >> Replace sunroof switch.
Sunroof Motor Assembly Power Supply and Ground Circuit CheckEIS002WX
1. CHECK POWER SUPPLY CIRCUIT
1. Disconnect the sunroof motor assembly connector.
2. Check voltage between sunroof motor assembly connector R4
terminals 1, 5 and ground.
*: For explanation of the three available mode settings, refer to RF-17, "
Work Support" .
OK or NG
OK >> GO TO 3.
NG >> GO TO 2.
Terminal Condition Continuity
1
2Sunroof switch in CLOSE position Yes
Other than above No
3Sunroof switch in OPEN position Yes
Other than above No
4Sunroof switch in TILT UP position Yes
Other than above No
6Sunroof switch in TILT DOWN position Yes
Other than above No
WIIA0232E
ConnectorTerminals (Wire color)
Condition Voltage
(Approx.)
(+) (–)
R4 1 (W/L) GroundIgnition switch ON Battery voltage
Within 45 seconds after
ignition switch is turned
OFF and all doors closed
(Mode 1)
*
Battery voltage
With ignition switch OFF
(Mode 2)*0
Within 2 minutes after
ignition switch is turned
OFF and all doors closed
(Mode 3)
*
Battery voltage
When front door LH or
RH is open while retained
power is operating.0
5 (W/R) Ignition switch OFF Battery voltage
WIIA0250E

Page 2823 of 3371

RF-22
SUNROOF
Revision: August 20072004 QX56
Door Switch CheckEIS002WY
1. CHECK DOOR SWITCH INPUT SIGNAL
With CONSULT-II
Check door switches (“DOOR SW-DR” and “DOOR SW-AS”) in “DATA MONITOR” mode with CONSULT-II.
Without CONSULT-II
1. Turn ignition switch OFF.
2. Check voltage between BCM connector and ground.
OK or NG
OK >> Door switches are OK.
NG >> GO TO 2.
2. CHECK DOOR SWITCH CIRCUIT
1. Disconnect front door switches and BCM connectors.
2. Check continuity between front door switch connector B8 (LH) or B108 (RH) terminal 2 and BCM connec-
tor M18, M19 terminals 12 and 47.
3. Check continuity between front door switch connector B8 (LH)
or B108 (RH) terminal 2 and ground.
OK or NG
OK >> GO TO 3.
NG >> Repair or replace harness between BCM and door switch.
Monitor item Condition
DOOR SW-DROPEN : ON
CLOSE : OFF
DOOR SW-ASOPEN : ON
CLOSE : OFF
PIIA2464E
Item ConnectorTe r m i n a l s ( W i r e
color)
ConditionVoltage (V)
(Approx.)
(+) (–)
RH M18 12 (R/L)
GroundDoor Open
(switch closed)0
Door Closed
(switch open)Battery
voltage
LH M19 47 (SB)Door Open
(switch closed)0
Door Closed
(switch open)Battery
voltage
WIIA0234E
Front door switch LH
2 (SB) - 47 (SB) : Continuity should exist.
Front door switch RH
2 (R/L) - 12 (R/L) : Continuity should exist.
2 (SB or R/L) - Ground : Continuity should not exist.
WIIA0235E

Page 2824 of 3371

SUNROOF
RF-23
C
D
E
F
G
H
J
K
L
MA
B
RF
Revision: August 20072004 QX56
3. CHECK DOOR SWITCH
Check continuity between each door switch terminal 2 and body ground part of door switch.
OK or NG
OK >> GO TO 4.
NG >> Replace malfunctioning door switch.
4. CHECK BCM OUTPUT SIGNAL
1. Connect BCM connector.
2. Check voltage between BCM connector M18 terminal 12, M19 terminal 47 and ground.
OK or NG
OK >> Check the condition of the harness and the connector.
NG >> Replace BCM. Refer to BCS-19, "
Removal and Installa-
tion of BCM" .
Terminal Condition Continuity
2Body ground part
of door switchDoor switch pushed No
Door switch released Yes
WIIA0289E
12 (R/L) - Ground : Battery voltage
47 (SB) - Ground : Battery voltage
WIIA0234E

Page 2860 of 3371

RSU-1
REAR SUSPENSION
E SUSPENSION
CONTENTS
C
D
F
G
H
I
J
K
L
M
SECTION RSU
A
B
RSU
Revision: August 20072004 QX56 PRECAUTIONS .......................................................... 3
Precautions for Supplemental Restraint System
(SRS) “AIR BAG” and “SEAT BELT PRE-TEN-
SIONER” .................................................................. 3
Precautions for Rear Suspension ............................ 3
Wiring Diagrams and Trouble Diagnosis .................. 3
PREPARATION ........................................................... 4
Commercial Service Tools ........................................ 4
NOISE, VIBRATION, AND HARSHNESS (NVH)
TROUBLESHOOTING ................................................ 5
NVH Troubleshooting Chart ..................................... 5
CAN COMMUNICATION ............................................ 6
System Description .................................................. 6
TROUBLE DIAGNOSIS .............................................. 7
How to Perform Trouble Diagnoses for Quick and
Accurate Repair ....................................................... 7
INTRODUCTION ................................................... 7
CLARIFY CONCERN ............................................ 7
WORK FLOW ........................................................ 8
Component Parts and Harness Connector Location ..... 9
Wiring Diagram — A/SUSP — ............................... 10
Basic Inspection ..................................................... 12
AIR HOSES ......................................................... 12
POWER SYSTEM TERMINAL LOOSENESS
AND BATTERY INSPECTION ............................ 12
CK SUSP INDICATOR LAMP INSPECTION ...... 12
CK SUSP Indicator Lamp Timing ........................... 12
Control Unit Input/Output Signal Standard ............. 12
CONSULT-II Function (AIR LEVELIZER) ............... 13
CONSULT-II OPERATION .................................. 13
WORK SUPPORT ............................................... 14
SELF-DIAGNOSIS .............................................. 14
DATA MONITOR ................................................. 15
ACTIVE TEST ..................................................... 16
TROUBLE DIAGNOSIS FOR SELF-DIAGNOSTIC
ITEMS ....................................................................... 17
Height Sensor System Inspection .......................... 17
Exhaust Valve Solenoid System Inspection ........... 19
Compressor Motor, Compressor Motor Relay and Circuit Inspection .................................................... 20
TROUBLE DIAGNOSES FOR SYMPTOMS ............ 23
Load Leveling Rear Air Suspension System Does
Not Operate ............................................................ 23
CK SUSP Indicator Lamp Stays On When Ignition
Switch Is Turned On ............................................... 24
REAR SUSPENSION ASSEMBLY ........................... 25
Components ........................................................... 25
On-Vehicle Inspection and Service ......................... 26
SHOCK ABSORBER INSPECTION .................... 26
Wheel Alignment Inspection ................................... 27
PRELIMINARY INSPECTION ............................. 27
GENERAL INFORMATION AND RECOMMEN-
DATIONS ............................................................. 27
THE ALIGNMENT PROCESS ............................. 28
CAMBER ............................................................. 28
TOE-IN ................................................................ 28
REAR SUSPENSION MEMBER ............................... 30
Removal and Installation ........................................ 30
REMOVAL ........................................................... 31
INSPECTION AFTER REMOVAL ....................... 32
INSTALLATION ................................................... 33
SHOCK ABSORBER ................................................ 34
Removal and Installation ........................................ 34
REMOVAL ........................................................... 34
INSTALLATION ................................................... 34
INSPECTION AFTER INSTALLATION ................ 34
SUSPENSION ARM .................................................. 35
Removal and Installation ........................................ 35
REMOVAL ........................................................... 35
INSPECTION AFTER REMOVAL ....................... 35
INSTALLATION ................................................... 36
FRONT LOWER LINK .............................................. 37
Removal and Installation ........................................ 37
REMOVAL ........................................................... 37
INSPECTION AFTER REMOVAL ....................... 37
INSTALLATION ................................................... 38

Page 2871 of 3371

RSU-12
TROUBLE DIAGNOSIS
Revision: August 20072004 QX56
Basic InspectionEES00116
AIR HOSES
1. Check for pinched or damaged air hoses between the suspension air reservoir and each load leveling rear
air suspension shock absorber. Reposition, repair or replace hoses as necessary.
2. Check the air hose connections at the suspension air reservoir and at the shock absorbers for leaks. If
connections are leaking, repair or replace hoses as necessary.
POWER SYSTEM TERMINAL LOOSENESS AND BATTERY INSPECTION
Make sure the battery positive cable, negative cable and ground connection are not loose. In addition, make
sure the battery is sufficiently charged.
CK SUSP INDICATOR LAMP INSPECTION
1. Make sure the CK SUSP indicator lamp turns on for approximately 2 seconds when the ignition switch is
turned ON. If it does not, check the combination meter. Refer to DI-5, "
COMBINATION METERS" .
2. Make sure the lamp turns off approximately 2 seconds after the ignition switch is turned ON. If the lamp
does not turn off, conduct self-diagnosis of the suspension control unit.
3. After conducting the self-diagnosis, be sure to erase the error memory. Refer to RSU-13, "
CONSULT-II
Function (AIR LEVELIZER)" .
CK SUSP Indicator Lamp TimingEES00117
X: ON
—: OFF
Control Unit Input/Output Signal StandardEES00118
( ): Wire colorConditionCK SUSP
indicator lampRemarks
Ignition switch OFF – –
Ignition switch ON X Turns off after approximately 2 seconds.
Te r m i n a l
Item ConditionVoltage (V)
(Approx.)
+–
1 (V)
GroundCompressor relay output
Ignition switch ON or STARTBattery voltage
3 (W) Height sensor signal input 0.2V - 4.8V
5 (R) Reference voltage 5V
6 (G/R) Ignition power
Battery voltage
7 (W/L) Battery power —
8 (G/W) Diagnostic K-line — —
9 (SB) Exhaust valve output Ignition switch ON or START Battery voltage
10 (BR) Warning lamp output — —
14 (L) Height sensor ground — —
15 (BR/W) Alternator L signal input Engine running —
16 (B) Suspension control unit ground — 0V

Page 2882 of 3371

TROUBLE DIAGNOSES FOR SYMPTOMS
RSU-23
C
D
F
G
H
I
J
K
L
MA
B
RSU
Revision: August 20072004 QX56
TROUBLE DIAGNOSES FOR SYMPTOMSPFP:99999
Load Leveling Rear Air Suspension System Does Not OperateEES0011D
1. CHECK WARNING LAMP ACTIVATION
Make sure warning lamp remains off while driving.
OK or NG
OK >> GO TO 2.
NG >> Carry out self-diagnosis. Refer to RSU-14, "
SELF-DIAGNOSIS" .
2. CHECK FUSES
Check that the following fuses are not blown.
OK or NG
OK >> GO TO 3.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
3. CHECK SUSPENSION CONTROL UNIT POWER AND GROUND
1. Turn the ignition switch ON.
2. Check voltage between suspension control unit connector B3
terminal 6 (G/R) and ground and between suspension control
unit connector B3 terminal 7 (W/L) and ground.
3. Turn ignition switch OFF.
4. Check resistance between suspension control unit connector B3
terminal 16 (B) and ground.
OK or NG
OK >> GO TO 4.
NG >> Repair the circuit.
Unit Terminals Signal name Fuse or Fusible Link
Suspension control unit6 Ignition switch ON or START 12 (10A)
7
Battery power29 (10A)
Compressor motor relay 5 g (30A)
Combination meter24 Ignition switch ON or START 14 (10A)
8 Battery power 19 (10A)
Voltage : Approx. 12V
WEIA0069E
Continuity should exist.
WEIA0070E

Page 2905 of 3371

RSU-46
CONTROL UNIT
Revision: August 20072004 QX56
CONTROL UNITPFP:47850
Removal and InstallationEES0011V
REMOVAL
1. Remove the rear LH interior trim panel. Refer to EI-34, "BODY SIDE TRIM" .
2. Disconnect the battery negative terminal.
3. Disconnect the suspension control unit electrical connector.
4. Remove the two bolts and remove the suspension control unit.
INSTALLATION
Installation is in the reverse order of removal.
Initialization ProcedureEES0011W
1. If control unit has been replaced, proceed to step 2. If control unit has not been replaced, use CONSULT-
II “CLEAR HEIGHT INI” work support function to clear initialization flag and value. The CK SUSP warning
lamp should illuminate. Using CONSULT-II “EXHAUST SOLENOID” active test, release the air pressure
from the rear load leveling air suspension system.
2. Roll vehicle forward and backward.
3. Use CONSULT-II “ADJUST HEIGHT INI” work support function to set initialization condition.
4. Confirm that CK SUSP warning lamp is OFF.
LEIA0100E
Suspension control unit bolts : 6 N·m (0.6 kg-m, 53 in-lb)

Page 2909 of 3371

SB-2
PRECAUTIONS
Revision: August 20072004 QX56
PRECAUTIONSPFP:00001
Precautions for Supplemental Restraint System (SRS) “AIR BAG” and “SEAT
BELT PRE-TENSIONER”
EHS000VP
The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER”, used along
with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger for certain
types of collision. This system includes seat belt switch inputs and dual stage front air bag modules. The SRS
system uses the seat belt switches to determine the front air bag deployment, and may only deploy one front
air bag, depending on the severity of a collision and whether the front occupants are belted or unbelted.
Information necessary to service the system safely is included in the SRS and SB section of this Service Man-
ual.
WAR NIN G:
To avoid rendering the SRS inoperative, which could increase the risk of personal injury or death
in the event of a collision which would result in air bag inflation, all maintenance must be per-
formed by an authorized NISSAN/INFINITI dealer.
Improper maintenance, including incorrect removal and installation of the SRS, can lead to per-
sonal injury caused by unintentional activation of the system. For removal of Spiral Cable and Air
Bag Module, see the SRS section.
Do not use electrical test equipment on any circuit related to the SRS unless instructed to in this
Service Manual. SRS wiring harnesses can be identified by yellow and/or orange harnesses or
harness connectors.
Precautions for Seat Belt ServiceEHS000VQ
CAUTION:
Before removing the seat belt pre-tensioner assembly, turn the ignition switch OFF, disconnect
both battery cables and wait at least 3 minutes.
After replacing or reinstalling seat belt pre-tensioner assembly, or reconnecting seat belt pre-ten-
sioner assembly connector, ensure entire SRS operates properly. Refer to SRS-20, "
SRS Opera-
tion Check" .
Do not disassemble buckle or seat belt assembly.
Do not reuse seat belt anchor bolts after removal. Replace with new ones.
Replace anchor bolts if they are deformed or worn out.
Never oil tongue and buckle.
If any component of seat belt assembly is questionable, do not repair. Replace the whole seat belt
assembly.
If webbing is cut, frayed, or damaged, replace seat belt assembly.
When replacing seat belt assembly, use a genuine NISSAN seat belt assembly.
AFTER A COLLISION
WAR NIN G:
Inspect all seat belt assemblies including retractors and attaching hardware after any collision.
NISSAN recommends that all seat belt assemblies in use during a collision be replaced unless the
collision was minor and the belts show no damage and continue to operate properly. Failure to do
so could result in serious personal injury in an accident. Seat belt assemblies not in use during a
collision should also be replaced if either damage or improper operation is noted. Seat belt pre-
tensioner should be replaced even if the seat belts are not in use during a frontal collision in which
the air bags are deployed.
Replace any seat belt assembly (including anchor bolts) if:
The seat belt was in use at the time of a collision (except for minor collisions and the belts, retractors and
buckles show no damage and continue to operate properly).
The seat belt was damaged in an accident. (i.e., torn webbing, bent retractor or guide, etc.)
The seat belt attaching point was damaged in an accident. Inspect the seat belt attaching area for damage
or distortion and repair as necessary before installing a new seat belt assembly.
Anchor bolts are deformed or worn out.
The seat belt pre-tensioner should be replaced even if the seat belts are not in use during the collision in
which the air bags are deployed.

Page 2911 of 3371

SB-4
SEAT BELTS
Revision: August 20072004 QX56
REMOVAL OF SEAT BELT RETRACTOR
CAUTION:
Before servicing SRS, turn the ignition switch off, disconnect both battery cables and wait at least
3 minutes.
1. Remove the center pillar upper/lower finishers. Refer to EI-34, "
BODY SIDE TRIM" .
2. Remove the seat belt retractor anchor bolts and seat belt retractor and belt assembly.
On RH side, disconnect the seat belt tension sensor.
3. Disconnect the seat belt pre-tensioner electrical connector.
CAUTION:
For installing/removing seat belt pre-tensioner connector,
insert a thin screwdriver wrapped in tape into the notch, lift
the lock and remove the connector.
Install the connector with the lock raised, and push the lock
into the connector.
INSTALLATION OF SEAT BELT RETRACTOR
Installation is in the reverse order of removal.
Install the seat belt retractor and belt assembly upper bolt first.
Ensure that seat belt height adjuster is locked in the lowest position during installation.
WHIA0237E
PHIA0341E

Page 2922 of 3371

SC-1
STARTING & CHARGING SYSTEM
K ELECTRICAL
CONTENTS
C
D
E
F
G
H
I
J
L
M
SECTION SC
A
B
SC
Revision: August 20072004 QX56 PRECAUTIONS .......................................................... 2
Precautions for Supplemental Restraint System
(SRS) “AIR BAG” and “SEAT BELT PRE-TEN-
SIONER” .................................................................. 2
Wiring Diagrams and Trouble Diagnosis .................. 2
PREPARATION ........................................................... 3
Special Service Tool ................................................. 3
Commercial Service Tools ........................................ 3
BATTERY .................................................................... 4
How to Handle Battery ............................................. 4
METHODS OF PREVENTING OVER-DIS-
CHARGE ............................................................... 4
CHECKING ELECTROLYTE LEVEL .................... 4
SPECIFIC GRAVITY CHECK ............................... 5
CHARGING THE BATTERY ................................. 6
Trouble Diagnoses with Battery/Starting/Charging
System Tester .......................................................... 6
DIAGNOSTIC RESULT ITEM CHART .................. 8
Removal and Installation .......................................... 9
REMOVAL ............................................................. 9
INSTALLATION ..................................................... 9
STARTING SYSTEM ................................................ 10
System Description ................................................ 10
Wiring Diagram — START — ..................................11
Trouble Diagnoses with Battery/Starting/Charging
System Tester ........................................................ 12
DIAGNOSTIC RESULT ITEM CHART ................ 12
WORK FLOW ...................................................... 13DIAGNOSTIC PROCEDURE 1 ........................... 14
DIAGNOSTIC PROCEDURE 2 ........................... 15
MINIMUM SPECIFICATION OF CRANKING
VOLTAGE REFERENCING COOLANT TEM-
PERATURE ......................................................... 16
Removal and Installation ........................................ 16
REMOVAL ........................................................... 16
INSTALLATION ................................................... 16
CHARGING SYSTEM ............................................... 17
System Description ................................................. 17
Wiring Diagram — CHARGE — ............................. 18
Trouble Diagnoses with Battery/Starting/Charging
System Tester ......................................................... 19
DIAGNOSTIC RESULT ITEM CHART ................ 20
WORK FLOW ...................................................... 21
DIAGNOSTIC PROCEDURE 1 ........................... 22
DIAGNOSTIC PROCEDURE 2 ........................... 23
DIAGNOSTIC PROCEDURE 3 ........................... 23
DIAGNOSTIC PROCEDURE 4 ........................... 25
DIAGNOSTIC PROCEDURE 5 ........................... 26
MALFUNCTION INDICATOR .............................. 27
Removal and Installation ........................................ 27
REMOVAL ........................................................... 27
INSTALLATION ................................................... 27
SERVICE DATA AND SPECIFICATIONS (SDS) ...... 28
Battery .................................................................... 28
Starter ..................................................................... 28
Generator ............................................................... 28

Page:   < prev 1-10 ... 371-380 381-390 391-400 401-410 411-420 421-430 431-440 441-450 451-460 ... 530 next >