lock CHRYSLER CARAVAN 2002 Service Manual

CHRYSLER CARAVAN 2002 Service Manual CARAVAN 2002 CHRYSLER CHRYSLER https://www.carmanualsonline.info/img/25/56864/w960_56864-0.png CHRYSLER CARAVAN 2002 Service Manual

Page 347 of 2399

CHRYSLER CARAVAN 2002  Service Manual seat switch. Refer toDiagnosis and Testing
Heated Seat Switchin Heated Seats for heated
seat switch diagnosis and testing procedures. If the
heated seat switch checks OK, proceed as follows.
(1) Check

Page 348 of 2399

CHRYSLER CARAVAN 2002  Service Manual (4) Remove the screw holding the PLG control
module to the D-pillar (Fig. 10).
(5) Remove the PLG control module from the vehi-
cle.
INSTALLATION
(1) Install the PLG control module on the D-pillar
and

Page 357 of 2399

CHRYSLER CARAVAN 2002  Service Manual (M) Check Engine Lamp (MIL) will illuminate during engine operation if this Diagnostic Trouble Code was recorded.
(G) Generator Lamp Illuminated
GENERIC
SCAN TOOL
CODEDRB SCAN TOOL DISPLAY DESCRIPTION

Page 361 of 2399

CHRYSLER CARAVAN 2002  Service Manual (M) Check Engine Lamp (MIL) will illuminate during engine operation if this Diagnostic Trouble Code was recorded.
(G) Generator Lamp Illuminated
GENERIC
SCAN TOOL
CODEDRB SCAN TOOL DISPLAY DESCRIPTION

Page 364 of 2399

CHRYSLER CARAVAN 2002  Service Manual (BCM), and the DRB IIItscan tool. The SKIM trans-
mits and receives RF signals through a tuned
antenna enclosed within a molded plastic ring forma-
tion that is integral to the SKIM housing. When the

Page 367 of 2399

CHRYSLER CARAVAN 2002  Service Manual SHIFT SCHEDULES
As mentioned earlier, the TCM has programming that
allows it to select a variety of shift schedules. Shift
schedule selection is dependent on the following:
²Shift lever position
²Th

Page 371 of 2399

CHRYSLER CARAVAN 2002  Service Manual reflashed if necessary. Refer to the latest Technical
Service Bulletin (TSB) Information for any updates.
The power door control module is a replaceable
component and cannot be repaired, if found to b

Page 374 of 2399

CHRYSLER CARAVAN 2002  Service Manual PCM/SKIM PROGRAMMING
When a PCM (JTEC) and the SKIM are replaced
at the same time perform the following steps in
order:
(1) Program the new PCM (JTEC)
(2) Program the new SKIM
(3) Replace all ignition

Page 388 of 2399

CHRYSLER CARAVAN 2002  Service Manual CONVENTIONAL BATTERY CHARGING TIME TABLE
Charging
Amperage5 Amps10
Amps20 Amps
Open Circuit
VoltageHours Charging @ 21É C (70É
F)
12.25 to 12.49 6 hours 3 hours 1.5
hours
12.00 to 12.24 10 hours 5 h

Page 391 of 2399

CHRYSLER CARAVAN 2002  Service Manual (1) Turn the ignition switch to the Off position. Be
certain that all electrical accessories are turned off.
(2) Remove the nut with washer that secures the
battery hold down bracket to the battery tr