GEELY FC 2008 Service Manual
Manufacturer: GEELY, Model Year: 2008, Model line: FC, Model: GEELY FC 2008Pages: 419, PDF Size: 13.87 MB
Page 41 of 419
![GEELY FC 2008 Service Manual Engine mechanism - Valve clearanceValve clearanceAdjustment1. Remove engine plastic hood components.
2. Remove ignition coil components [4G18-3705110].
3. Remove cylinder head cover components [4G18-
GEELY FC 2008 Service Manual Engine mechanism - Valve clearanceValve clearanceAdjustment1. Remove engine plastic hood components.
2. Remove ignition coil components [4G18-3705110].
3. Remove cylinder head cover components [4G18-](/img/58/57161/w960_57161-40.png)
Engine mechanism - Valve clearanceValve clearanceAdjustment1. Remove engine plastic hood components.
2. Remove ignition coil components [4G18-3705110].
3. Remove cylinder head cover components [4G18-
1003130].
4. Remove engine right bottom shield.
5. Turn crankshaft to cylinder 1 compression top dead
center position.(a) Turn crankshaft pulley to align its groove with “o” mark on
timing chain hood.
(b) Check dot marks on camshaft timing sprocket and VVT
timing sprocket, and they should be in a line on timing chain
hood surface as shown in the diagram.
Hint: if not, turn crankshaft for one circle again
and align the above marks.6. Check valve clearance.(a) Only check the valves shown in the diagram.
(1) Measure the clearance between valve tappet and cam-
shaft with plug gauge.
(2) Record valve clearance measuring value exceeding
specification, and this value will be used to determine
valve tappet thickness that needs change.
Valve clearance (cold vehicle)Intake airExhaust(b) Turn crankshaft for one circle ), and cylinder 4 is
turned to compression top dead center position.
(c) Only check the valves shown in the diagram. Measure valve
clearance (see step (a)).7. Remove drive beltSlowly turn drive belt tensioner clockwise to loosen it.
Then remove drive belt and put back drive belt tensioner slowly
and gently. 30 Mark
Mark
Mark
Timing chain
hood surface
Groove
Page 42 of 419

Engine mechanism - Valve clearance8. Remove right engine mounting assembly(a) Remove PS oil pump reservoir and put it aside.
(b) Place wooden block between jack and engine, properly
place the jack, and then remove right engine mounting
assembly.9. Remove drive belt tensioner device [4G18-
1300200].Hint: operate the jack up and down to remove bolts.10. Adjust valve clearance.Note: do not turn crankshaft before installing chain
tensioner.
(a) Turn crankshaft to cylinder 1 top dead center position.
(b) Align the marks on timing chain and camshaft timing
sprocket.
(c) Remove 2 bolts and chain tensioner.
(d) Fix camshaft with adjustable wrench and then loosen
the fixed bolts of exhaust camshaft timing sprocket.
Note: be careful not to damage valve lifter.
(e) As sequences shown in the diagram, loosen camshaft
bearing cover bolts on exhaust camshaft at several
times and remove the bearing cover at the same time.
(f) As shown in the diagram, remove exhaust camshaft
timing sprocket.Painting
mark
LooseningFixing 31
Page 43 of 419

Engine mechanism - Valve clearanceThickness of new valve lifterThickness of old valve liftereasured valve clearance(g) As sequences shown in the diagram, loosen camshaft
bearing cover bolts on intake camshaft at several times
and remove the bearing cover at the same time.
(h) Hold timing chain with hands and then remove the
camshaft.
(i) As shown in the diagram, tie up the chain with bandage.
Note: be careful not to let anything fall into the
timing chain hood.
(j) Remove valve lifter.
(k) Measure the thickness of this valve lifter with
micrometer.
(1) Calculate the thickness of new valve tappet and
adjust valve clearance within specification.: Exhaust: Hints:New valve tappet chosen should be near the value cal-
culated as much as possible.The thickness of valve tappet is from 5.06mm to 5.74mm,
and there is one specification every 0.02mm, therefore
there are totally 35 different dimensions to chose.
(m) As shown in the diagram, align alignment mark with tim-
ing mark on camshaft timing sprocket, and install timing
chain on the timing sprocket. 32Timing remarkchain linkTiming mark
Page 44 of 419

Engine mechanism - Valve clearance(n) Check intake side camshaft bearing cover forward re-
mark and figure, and tighten the bolts as sequences
shown in the diagram.
Torque: (o) Align alignment mark on the chain with timing mark on
camshaft timing sprocket, and place exhaust camshaft
in cylinder head.
(p) Temporarily lock fixed bolts.
(q) Check exhaust side camshaft bearing cover forward
remark and figure, and tighten the bolts as sequences
shown in the diagram.
Torque: (r) Install camshaft front bearing cover.
Torque: (s) Fix camshaft with adjustable wrench and then tighten
the fixed bolts of camshaft timing sprocket.
Torque: Note: be careful not to damage valve lifter.33Timing remark chain linkTiming markTighteningFixing
Page 45 of 419

Engine mechanism - Valve clearance(t) Check the matching marks on timing chain and cam-
shaft timing sprocket, and then align the groove of crank-
shaft pulley with the timing mark on timing chain hood
as shown in the diagram.
(u) Install chain tensioner.
(1) Check o-ring is clean, and buckle on the hook as
shown in the diagram.
(2) Coat engine oil on the chain tensioner, and then
install it.
Note: when installing the chain temsioner, buckle
on the hook again if plunger has ejected.
(3) Turn crankshaft counterclockwise to separate the
hook from lock pin on the plunger.Mark
Mark
Mark
Timing chain
hood surface
GroovePressing in 34 Lifting
HookPressing
inPinTurning Pin Separation
Hook
Page 46 of 419

Engine mechanism - Valve clearance(4) Turn crankshaft clockwise, and check the sliding
parts are blocked by plunger.
Hint: if the plunger does not eject, press the chain ten-
sion rail toward chain tensioner with screwdriver
or fingers to separate the hook from lock pin and
make the plunger eject.11.Install cylinder head cover components.(a) Install cylinder head cover gasket on cylinder head cover.
(b) Eliminate all old sealant (FIPG) materials.
(c) Coat sealant on 2 positions shown in the diagram.
Notes:Wipe off all the oil stains on junction plane.After coating sealant, finish installation of cylinder head
cover within 3 minutes.After installing, do not refill engine oil within 2 minutes.
(d) Install cylinder head cover components with 9 bolts, 2 seal washers and 2 nuts.
Evenly tighten bolts and nuts at several times.
Torque:
Short bolt: Nut, long bolt etc.: m12. Install drive belt tensioner device.Torque: nut: Bolt: 13. Install fixing bracket absorber on the left of engine.Torque: 14. Check there is oil leakage.Sealant 35 Plunger
TurningPushing
Page 47 of 419

Engine mechanism - Engine assemblyEngine assemblyReplacement1. Take measures to prevent gasoline leaking.
2. Remove engine right bottom shield.
3. Remove engine left bottom shield.
4. Discharge coolant.
5. Remove front wheels.
6. Remove engine plastic hood components.
7. Remove battery.
8. Remove air filter assembly.
9. Remove air filter hose.
10. Remove battery tray.
11. Disassemble fuel hose assembly.
12. Remove throttle cable assembly.
13. Disassemble radiator hose inlet end.
14. Disassemble radiator hose outlet end.
15. Disassemble cold air pipe inlet hose.
16. Disassemble cold air pipe outlet hose.
17. Remove transmission control pull cable assembly.
18. Disassemble warm air water inlet hose [4G18-1300102].
19. Disassemble warm air water outlet hose [4G18-1300108].
20. Disassemble the hoses of all joints to connect vehicle body end.
21. Uncouple engine wire harness.(a) Remove glove compartment door.
(b) Remove engine wire harness from engine ECU and junction block.
(c) Pull out engine wire harness.
(b) Remove engine wire harness from junction block of engine room.
(e) Remove vehicle body earth wire. 36
Page 48 of 419
![GEELY FC 2008 Service Manual Engine mechanism - Engine assembly22. Remove drive belt.Drive belt tensioner could turn belt tensioner clockwise to
loosen it.23. Remove alternator mounting components [4G18-
3701100].
24. Remove comp GEELY FC 2008 Service Manual Engine mechanism - Engine assembly22. Remove drive belt.Drive belt tensioner could turn belt tensioner clockwise to
loosen it.23. Remove alternator mounting components [4G18-
3701100].
24. Remove comp](/img/58/57161/w960_57161-47.png)
Engine mechanism - Engine assembly22. Remove drive belt.Drive belt tensioner could turn belt tensioner clockwise to
loosen it.23. Remove alternator mounting components [4G18-
3701100].
24. Remove compressor assembly.
25. Remove front chassis bracket.
26. Remove front exhaust pipe assembly.
27. Remove steering middle shaft assembly.(a) Remove steering column seal hole cover.
(b) Make alignment mark on steering middle shaft.
(c) Remove 2 bolts and steering middle shaft.
(d) Remove steering column cover.28. Remove the nuts on left side of front shaft hub.(a) Completely knock out the concave part of fixed nuts with
special tool and hammer.
Notes:Completely knock out the concave part of fixed
nuts before removing the fixed nuts.Do not damage thread of drive shaft.Do not sharpen the sharp end of special tool.Place the special tool in groove with its plane facing
upward.
(b) Remove fixed nuts with socket wrench (30mm).
Hint: perform the same steps at another side.29. Disassemble left side transversal lever assembly.Disassemble transversal lever assembly from steering
knuckle with special tool.
Hint: perform the same steps at another side.Alignment
markSpecial tool
Special tool37Sliding outLifting
Page 49 of 419

Engine mechanism - Engine assembly30. Disassemble left end front stabilizer link
assembly.Fix bolts with hex socket wrench, and then remove nuts.
Hint: perform the same steps at another side.31. Disassemble lower left control arm assembly.(a) As shown in the diagram, remove bolt and 2 nuts.
(b) Disassemble drive shaft from shaft hub with plastic
hammer.
Hint: perform the same steps at another side.32. Remove oil return pipe assembly.After removing 3 retaining clips and 2 bolts of power steer-
ing oil reservoir, remove the oil return pipe from vehicle.33. Remover engine assembly [4G18-1000000] and
transmission assembly.(a) Erect engine hanger.
(b) Remove 4 bolts, 2 nuts and right engine mounting
assembly.
(c) Remove through bolt and nut, and then remove left
engine mounting assembly from vehicle.
(d) As shown in the diagram, remove 6 bolts.
(e) Carefully remove engine assembly and transmission
assembly from vehicle. 38
Page 50 of 419

34. Remove power steering pump assembly.
35. Remove sub frame together with side member.(a) Remove front engine mounting assembly and rear en-
gine mounting assembly from engine assembly.
(b) Remove sub frame assembly.36. Remove starter mounting components
[4G18-3708100].
37. Remove transmission assembly.(a) Fix crankshaft with special tool, ant then remove 6 bolts.
(b) Remove transmission assembly.38. Remove clutch assembly [4G18-1601000]
and flywheel components [4G18-1005120J].(a) Fix crankshaft with special tool, ant remove clutch
assembly at first.
(b) Then remove flywheel components.39. Remove throttlesupporting plate [4G18-1008202].
40. Remove intake manifold assembly [4G18-
1008200].(f) As shown in the diagram, install front and rear hooks of
engine.
Torque: Hint: install engine hooks to front and rear sides of
engine.
(g) Lift engine assembly with chain pulley block and en-
gine lifting device.Engine mechanism - Engine assemblySpecial tool39 41. Remove exhaust manifold upper heat shield components [4G18-1008120].
42. Remove exhaust manifold assembly [4G18-1008100].
43. Remove fuel rail injector assembly [4G18-1112100].
44. Remove ignition coil installation components.
45. Remove oil level gauge tube components [4G18-1002140].
46. Remove temperature regulator assembly [4G18-1306100].
47. Disassemble warm air water outlet pipe components [4G18-1300100].
48. Remove oil pressure alerter [4G18-3757100].Remove oil pressure alerter with SST.49. Remove the hoses on all hose joint of engine.Remove clips and hose.50. Remove drive belt tensioner device.
51. Remove phase sensor [4G18-3600030].Engine hook
FrontRear