12.65 JAGUAR X308 1998 2.G Owner's Guide
[x] Cancel search | Manufacturer: JAGUAR, Model Year: 1998, Model line: X308, Model: JAGUAR X308 1998 2.GPages: 2490, PDF Size: 69.81 MB
Page 767 of 2490

10. Fit the primary chain tensioner blade.
1. Position the tensioner blade to the cylinder block.
2. Fit the retaining / pivot bolt and tighten it to 12 - 16 Nm.
11. Refit the primary chain tens ioner assembly. Refer to
Operation 12.65.54 in this Section.
Use a wedge 303 - 533 (or two if required) between the
primary chain tensioner and te nsioner blade, to take up
the slack in the chain.
12. Tighten the exhaust camshaft sprocket securing bolt.
1. Fit the chain tensioner tool 303 - 532 to the sprocket holes.
1. Apply force to the tool in an anti-clockwise direction
to tension the chain on its drive side.
2. Whilst applying the opposing force to the sprocket and chain, tighten the sprock et securing bolt to 115 -
125 Nm.
13. Tighten the VVT unit securing bolt.
1. Whilst still applying the opposing force to the
sprocket and chain (using 303 - 532), check that the
wedges are still in place, tighten the VVT unit
securing bolt to 115 - 125 Nm.
Remove the chain tensioning tool and the wedge(s).
Page 769 of 2490

1. Fit the new sealing ring (scarf jointed) to the carrier bush groove.
2. Fit a new O-ring to the carrier oil-way.
22. NOTE: Lubricate the seal (s carf jointed) and the bush.
Fit the VVT bush carrier to the cylinder block.
1. Fit the bush carrier assembly.
1. Check that the seals are in place and that the ring dowels are engaged squa rely. Fully locate the
assembly as much as possible by hand pressure.
2. Fit the two securing bolts and one nut. Tighten to 19 - 23 Nm.
23. Refit the Timing Cover. Refer to Operation 12.65.01 in this
Section.
24. Move the engine compartment cover from the service position
and connect the gas struts.
25. Remove the paint protection sheets and close the cover.
26. Connect the battery and fit the battery cover.
Refer to the Battery Reconnection Procedure 86.15.15.
Page 770 of 2490

Engine - Primary Timing Chain LH4.0L SC V8 - AJ26/3.2L NA V8 - AJ26,
3.2L/4.0L
In-vehicle Repair
Removal
Special Tool(s)
Camshaft setting
303-530
Timing chain tensioning
303-532
Wedges, primary chain
303-533
Crankshaft setting
303-531
1. Open the engine compartment and fit paintwork protection
sheets.
2. Set the engine compartment cover to the service access
position.
3. Disconnect the batt ery ground cable.
Remove the battery cover.
4. Remove the Timing Cover. Re fer to Operation 12.65.01.
5. Raise the vehicle on a ramp.
6. Remove the crankshaft position sensor.
1. Remove the bolt which secures the crankshaft
Page 775 of 2490

camshaft sprocket, Bank 2.
Reposition the sprocket to the most advantageous position for use of the tool.
Remove the tool.
2. Install the primary timi ng chain, Bank 2.
1. Install the primary chain over the crankshaft sprocket and the intake camshaft sp rocket. There must be no
slack on the drive side of the primary chain and the
sprockets should not be rotated on the camshafts (or
the tensioning tool may not fit).
Slide the camshaft sprocket s fully rearwards onto the
respective camshafts.
3. Install the primary ch ain tensioner blade.
1. Position the tensioner blade to the cylinder block.
2. Install the retaining / pivo t bolt and tighten it to 12-
16 Nm.
4. Install the primary chain te nsioner assembly. Refer to
Operation 12.65.55.
Use a wedge 303-533 (or two if required) between the
primary chain tensioner and te nsioner blade, to take up
the slack in the chain.
5. Tighten the exhaust camshaft sprocket securing bolt.
1. Install the chain tensioner tool 303-532 to the sprocket holes.
Apply force to the tool in an anti-clockwise direction to
tension the chain on its drive side.
Page 777 of 2490

10. Install the primary ch ain tensioner blade.
1. Position the tensioner blade to the cylinder block.
2. Install the retaining / pivo t bolt and tighten it to 12-
16 Nm.
11. Install the primary chain te nsioner assembly. Refer to
Operation 12.65.54.
Use a wedge 303-533 (or two if required) between the
primary chain tensioner and te nsioner blade, to take up
the slack in the chain.
12. Tighten the exhaust camshaft sprocket securing bolt.
1. Install the chain tensioner tool 303-532 to the sprocket holes.
Apply force to the tool in an anti-clockwise direction to
tension the chain on its drive side.
2. Whilst applying the opposing force to the sprocket and chain, tighten the sprock et securing bolt to 115-
125 Nm.
13. Tighten the intake camshaft sprocket securing bolt.
1. Whilst still applying the opposing force to the
sprocket and chain (using 303-532), check that the
wedges are still in place, ti ghten the securing bolt to
115-125 Nm.
Remove the chain tensioning tool and the wedge(s).
Page 778 of 2490

14. Remove the camshaft locking tool 303-530.
15. Raise the vehicle on the ramp.
16. Remove the crankshaft setting tool 303-531.
17. Install the crankshaft position sensor.
1. Install the sensor to the flywheel housing and install
the securing bolt. Tighten to 6-8 Nm.
2. Install the access grommet to the housing.
18. Lower the ramp.
19. Install the Timing Cover. Refer to Operation 12.65.01.
20. Move the engine compartment cover from the service position
and connect the gas struts.
21. Remove the paint protection sheets and close the cover.
22. Connect the battery and in stall the battery cover.
Refer to the Battery Reconnection Procedure 86.15.15.
Page 779 of 2490

Engine - Primary Timing Chain RH
In-vehicle Repair
Removal
Special Tool(s)
Camshaft setting
303-530
Timing chain tensioning
303-532
Wedges, primary chain
303-533
Crankshaft setting
303-531 1. Open the engine compartment and fit paintwork protection
sheets.
2. Set the engine compartment cover to the service access
position.
3. Disconnect the batt ery ground cable.
Remove the battery cover.
4. Remove the Timing Co ver. Refer to Operation 12.65.01 in this
Section.
5. Remove the VVT bush carrier.
1. Remove the three bolts which secure the carrier to the cylinder block.
Page 783 of 2490

Reposition the sprocket (and the VVT unit) for the most
advantageous position for use of the tool.
Remove the tool.
3. Refit the primary timing chain.
1. Fit the primary chain to position over the crankshaft sprocket and the VVT unit sprocket. There must be no
slack on the drive side of the primary chain and the
VVT unit must not be rotated on the camshaft.
4. Fit the primary chain tensioner blade.
1. Position the tensioner blade to the cylinder block.
2. Fit the retaining / pivot bolt and tighten it to 12-16 Nm.
5. Refit the primary chain tensione r assembly. Refer to Operation
12.65.54 in this Section.
Use a wedge 303 - 533 (or two if required) between the
primary chain tensioner and tensioner blade, to take up
the slack in the chain.
6. Tighten the exhaust camshaft sprocket securing bolt.
1. Fit the chain tensioner tool 303 - 532 to the sprocket holes.
Apply force to the tool in an anti-clockwise direction to
tension the chain on its drive side.
2. Whilst applying the opposing force to the sprocket
Page 785 of 2490

Lubricate the seal (scarf jointed) and the bush.
1. Fit the bush carrier assembly.
Check that the seals are in pl ace and that the ring dowels
are engaged squarely. Fully locate the assembly as much
as possible by hand pressure.
2. Fit the three securing bolts. Tighten to 19-23 Nm.
15. Refit the Timing Cover. Refer to Operation 12.65.01 in this
Section.
16. Move the engine compartment cover from the service position
and connect the gas struts.
17. Remove the paint protection sheets and close the cover.
18. Connect the battery and fit the battery cover.
Refer to the Battery Reconnection Procedure in Section
414-01.
Page 786 of 2490

Engine - Primary Timing Chain Inner Guide LH
In-vehicle Repair
Removal
1. Open the engine compartment and fit paintwork protection
sheets.
2. Set the engine compartment cover to the service access
position.
3. Disconnect the batt ery ground cable.
Remove the battery cover.
4. Remove the Timing Co ver. Refer to Operation 12.65.01 in this
Section.
5. Remove the VVT Bush Carrier Assembly from the B-Bank.
Refer to Operation 12.65.52 in this Section.
6. Remove the Timing Chain Tens ioner - Primary, from the B-
Bank. Refer to Operation 12.65.55 in this Section.
7. Fit a Tie-Strap through the link s of the primary chain, just
above the crankshaft sprocket, to retain the chain to the
sprocket.
8. Rotate the inlet camshaft (and the exhaust camshaft), using a
spanner on the flats, to provide sufficient slack in the chain to
remove the chain tensioner blade.
9. Remove the chain tensioner blade.
1. Remove the pivot bolt which secures the tensioner blade.